The document outlines the steps to complete three quality control processes: 1) Quality Inspection with 8 steps to select inspections, edit line items, fill quantities, select decisions, and save. 2) Change of Stock with 7 steps to select products, identify batch numbers, and set stock to unrestricted. 3) Goods Movement with 6 steps to select products, fill quantities, and save movement to target logistic areas. The processes allow inspection completion, changing inspection stock to unrestricted, and moving stock to stores.

Uploaded by

Veera Mani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views

Quality Process Steps

The document outlines the steps to complete three quality control processes: 1) Quality Inspection with 8 steps to select inspections, edit line items, fill quantities, select decisions, and save. 2) Change of Stock with 7 steps to select products, identify batch numbers, and set stock to unrestricted. 3) Goods Movement with 6 steps to select products, fill quantities, and save movement to target logistic areas. The processes allow inspection completion, changing inspection stock to unrestricted, and moving stock to stores.

Uploaded by

Veera Mani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Quality Inspection process steps

Step 1 Select Quality control work center


Step 2 Select Inspections
Step 3 Select All open inspections option in the drop down list box
Step 4 Select the line id and click edit option
Step 5 Fill the inspected quantity
Step 6 Select the Accepted option in the drop down list
Step 7 Select the Decision option and select the quality descison
Step 8 Click the save button and close the document

Change of stock
Step 1 Select the Quality Control work center
Step 2 Select the change of stock option in the common task
Step 3 Add the product id using Addrow option
Step 4 Select the batch no in the identified stock
Step 5 Click on the next button
Step 6 Click on the set unrestricted stock button
Step 7 Click the Next button and finish

Goods Movement
Step 1 Select the Internal Logistics work center
Step 2 Select the Goods Movement in the common task
Step 3 Add the product id using Addrow option
Step 4 Click the next button
Step 5 Fill the quantity and target logistic area
Step 6 Click the next button and save
This flow only for inspection completion.

Inspected stock is still in the inspection mode. We have to change this mode to unrestricted
mode. Then only we could move the stock to resepctive stores

This option is moving the stock from inward area to respective stores