Site Investigation Observation Closing Report

1) The document records dates and details of issues reported on a 400kV transmission line between locations 49/0 to 49/1. 2) In July 2020, instructions were given to trim trees that were coming into the line corridor. 3) By July 30th 2020, the trees had been cut and trimmed after paying the tree owners. Verification of the corrective actions was recorded.

Uploaded by

Harsh Vardhan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views12 pages

Site Investigation Observation Closing Report

1) The document records dates and details of issues reported on a 400kV transmission line between locations 49/0 to 49/1. 2) In July 2020, instructions were given to trim trees that were coming into the line corridor. 3) By July 30th 2020, the trees had been cut and trimmed after paying the tree owners. Verification of the corrective actions was recorded.

Uploaded by

Harsh Vardhan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 12

Sl.

no Date Received from

D
A
T
E

1
5 400 KV SA LINE
1
J LOCATION NO 49/-
U 49/1
L
Y
2
0
2
0
D
A
T
E

1
5 400 KV SA LINE
1
J LOCATION NO 49/-
U 49/1
L
Y

2
0
2
0

D
D
A
T
E

1
5 400 KV SA LINE
J LOCATION NO 48/0 -
U 49/0
L
Y
2
0
2
0

HARSHVARDHAN
CORRECTIVE ACTION & PREVENTIVE ACTION REG

Corrective / Preventive
Nature of complaint / Finder-Fixer/Observations
Action Proposed

Instructed to the
AMC of M/s JBS
personnel to
cut/trim the
trees which is
coming in the
line corridor of
span no-49/0 to
49/1 in 1st this
month July-
2020.
Instructed to the
AMC of M/s JBS
personnel to
cut/trim the
trees which is
coming in the
line corridor of
span no-49/0 to
49/1 in 1st this
month July-
2020.
Instructed to the AMC
of M/s JBS personnel
to cut/trim the trees
which is coming in the
line corridor of span
no-49/0 to 49/1 in 1st
this month July-2020.
PREVENTIVE ACTION REGISTER

Ref. No. SPGVL/EHS/O&M/FR/23/17-10-2017/Rev.00

Date of Action Taken

Trees are cut and


trimmed on date
30 july 2020 after
payment to trees
owner
Trees are cut and
trimmed on date
30 july 2020 after
payment to trees
owner
Tree cut on date 06 Agust
2020
STER

Ref. No. SPGVL/EHS/O&M/FR/23/17-10-2017/Rev.00

Verification of Effectiveness