8D Report: Problem Solving Team

This document appears to be an 8D report template used for problem solving and continuous improvement. It contains sections for documenting a product complaint including details of the failure, a problem solving team, containment actions, root cause analysis, corrective actions, preventative actions, and verification of effectiveness. The template provides a structured approach to problem solving from containing the initial failure through identifying and addressing the root cause.

Uploaded by

Ashok Kumar A
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (5 votes)
2K views2 pages

8D Report: Problem Solving Team

This document appears to be an 8D report template used for problem solving and continuous improvement. It contains sections for documenting a product complaint including details of the failure, a problem solving team, containment actions, root cause analysis, corrective actions, preventative actions, and verification of effectiveness. The template provides a structured approach to problem solving from containing the initial failure through identifying and addressing the root cause.

Uploaded by

Ashok Kumar A
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

8D REPORT Report Date

Complaint date Originator: Where the failure occurred Failure details

Complaint No. Incoming Part/ Model No.

Complaint Description Production Machine Serial No.

Customer Name Shipping audit Delivery Quantity

Contact Information Customer line Quantity Rejected

Gear / Gearless Machine Customer Field X M/C Dispatch date

D1 Problem Solving Team

Role Name Department Skills Responsibility

Team Leader

Member

Member

D2 Problem Description

When did it take place?

Where did it take place?

What happened?

How many (Quantity)?

How did it happen?

Disposition Rework Rejection (Return to Supplier/ Customer) Conditionally Accepted Scrap

D3 Containment Action(s) - Short Term Actions to Limit Damage

Description Effectiveness % Responsible Completed By Completed On

Containment action at Inspected Qty Ok Qty Not Ok Effectiveness % Responsible Completed By Completed On

Transit

Inhouse

Supplier end

Customer end

Next Good shipment schedule Qty - Date - Will this have impact on COT? YES NO

D4 Root Cause Analysis

Description (how could the failure occur?) Responsible Completed On

Reason Why?

Reason Why?

Reason Why?

Reason Why?

Reason Why?

Final Root Cause

D5 Identified Permanent Corrective Action(s)

Description Responsible When Verification Status


D6 Implemented Permanent Corrective Action(s)

Description Responsible When Verification Status

D7 Preventive Action(s) - To Avoid Defect Recurrence


Document Updation Update Required
Action Responsible Completed on
(If required) (Y/N?)
One point Lesson

Manufacturing Work Instructions

Inspection Work Instructions

Drawing

Process Flow Charts

Process FMEA

Process Control Plans

Others - Specify

Horizantal Deployment
Actions Responsible When Verification Status

D8 Congratulate Your Team - Final Meeting

Verification of Effectiveness (Implemented Permanent Corrective Action)

1st lot / Batch 2nd lot / Batch 3rd lot / Batch Status

Final Validation by 8D Closure YES NO Approved By


customer Date Date