(NH 52)
to Ajmer road section (NH 48) in the state of Rajasthan on Engineering, Procurement & Construction (EPC) Mode
Schedule B-1
Note: The prospective bidder/ agency should satisfy himself about the quantities and
quantum of utility shifting work involved well before the bid due date and it is made
clear in unequivocal terms that any changes/variation in quantities of over ground
utilities mentioned in Schedule-B1 will be executed by the contractor at no extra cost
to the Authority and the amount quoted by the contractor shall be deemed to be
inclusive of any such variation in the quantity of utility shifting actually executed at
site. The underground utilities found in excess of prescribed in Schedule B1shall be
shifted under CoS. The contractor will be thus fully responsible to shift all the
electrical works out of present ROW.
Schedule B-2
1. Responsibility of Removal of structure (if any) with in the ROW shall be taken up by
the contractor.