Daily MST Checklists
Daily MST Checklists
Time
Hrs. I/P Voltage (Ph) O/P Voltage (Ph) I/P Current O/P Current
HRS R-Y Y-B B-R I II III R Y B R Y
2nd Floor UPS 1 Rated 120 KVA
0:00
3:00
6:00
9:00
2nd Floor UPS 2 Rated 120 KVA
0:00
3:00
6:00
9:00
2nd floor Server Room UPS - 20 KVA
0:00
3:00
6:00
9:00
4th Floor UPS 1 Rated 40 KVA
0:00
3:00
6:00
9:00
4th Floor UPS 2 Rated 40 KVA
0:00
3:00
6:00
9:00
4th Floor UPS 3 Rated 80 KVA
0:00
3:00
6:00
9:00
4th Floor New Side UPS 1 Rated 100 KVA
0:00
3:00
6:00
9:00
4th Floor New Side UPS 2 Rated 100 KVA
0:00
3:00
6:00
9:00
Technician Duty Engineer Facility Manager
Name: Name: Name:
cy India Pvt. Ltd.
or Date :
BATTERY BATTERY Total
BACK UP VOLTAGE load Technician TECHNICIAN
O/P Current Freq. TIME Volts % Name SIGN
B HZ
ated 120 KVA
m UPS - 20 KVA
ated 40 KVA
ated 40 KVA
ated 80 KVA
Time
Hrs. I/P Voltage (Ph) O/P Voltage (Ph) I/P Current O/P Current
HRS R-Y Y-B B-R I II III R Y B R Y
2nd Floor UPS 1 Rated 120 KVA
12:00
3:00
6:00
9:00
2nd Floor UPS 2 Rated 120 KVA
12:00
3:00
6:00
9:00
2nd floor Server Room UPS- 20 KVA
12:00
3:00
6:00
9:00
4th Floor UPS 1 Rated 40 KVA
12:00
3:00
6:00
9:00
4th Floor UPS 2 Rated 40 KVA
12:00
3:00
6:00
9:00
4th Floor UPS 3 Rated 80 KVA
12:00
3:00
6:00
9:00
4th Floor New Side UPS 1 Rated 100 KVA
12:00
3:00
6:00
9:00
4th Floor New Side UPS 2 Rated 100 KVA
12:00
3:00
6:00
9:00
4th Floor UPS 1 Rated 40 KVA
12:00
3:00
6:00
9:00
UPS- 20 KVA
ted 40 KVA
ted 40 KVA
ted 80 KVA
ted 40 KVA
y Manager
DELOITTE CONSULTING INDIA PVT. LTD.
Date: Purchase Approval
Cost
Per Unit Total HELD IN
Sr. No. Material Denom Qty Tax after
Cost Cost STOCK
Tax
Order Placed By
Admin
Remark
s
Grand Total
Order Placed By
Admin
Remark
s
Deloitte Consultancy India Pvt. Ltd.
Daily Housekeeping Checklist
Date:
1 Reception
2 Security Office
3 Server Rooms
4 Workstations
5 Services Section
6 Board Room
7 All Cabins
8 All Meeting Rooms
9 Electrical Room
10 Video Conference Rooms
11 MD Cabin
12 Break Out area
14 All pantries
15 All Training Rooms
Gents Washrooms Check List
Description Status Remark Janitor'sName
1 Washbasin
2 Mirror glass
3 Urinal Pots
4 W/C
5 Exhaust Fan
6 Tiles & Walls
7 Floor
8 Garbage Removal
Ladies Washroom Check List
1 Washbasin
2 Mirror glass
3 W/C
4 Exhaust Fan
5 Tiles & Walls
6 Floor
7 Garbage Removal
CBRE
HK Supervisor Representati
ve
Deloitte Consultancy India Pvt. Ltd.
DAILY CHECKLIST FOR AUDIO VISUAL TECHNICIAN
Vth Floor
Sr.
Description
No. Board Room
Check for the chairs in the room are arranged properly. If not
7
then please arrange
Check all the lights in the room are functioning properly, inform
8
technician in case of any defficiency
10
Check White Board
Remarks:
Sign:
Floor:
Daily Checklist for MST Date:
A General
1 Check all the Emergency Light are always ON
4 Check Light MCBs are ON of all Meeting, Focus & Board Room
6 Check Light Switches are ON of all Meeting, Focus & Board Room
Shift MST
Name Signature Facility Engineer
Shift-A……………………………………………………… ………………. Sign:_________
Shift-B……………………………………………………… ……………….
Signature Signature
Name Name
Closing Order
Consumption
Stock Quantity
ur format
Facility Manager
Signature
Name
DELOITTE CONSULTING INDIA PVT. LTD.
Equipment Name:
Make:
Technical Details:
Readings
Operating Variables
Controlled Values
Recorded Values
Defficiency
Remarks
Major Fault Observed
Material Consumed
Donot use this
Things to Order
Total 21 21 21 17
Week off 0 0 0 4
Chamber Maids
Monday Tuesday Wednesday Thursday
First Shift 0700-1600 Hrs 1 1 1 1
General 0900-1800 Hrs 1 1 1 1
Late General 1100-2000 Hrs 1 1 1 1
Night Shift 2200-0700 Hrs
Total 3 3 3 3
Week off 0 0 0 0
Electricians
Monday Tuesday Wednesday Thursday
First Shift 0700-1600 Hrs 1 1 1 1
General 0900-1800 Hrs 1
Second Shift 1400-2300 Hrs 1 1 1 1
Night Shift 2200-0700 Hrs 1 1 1 1
Total 3 3 3 4
Week off 1 1 1 0
FM / Duty Engineers
Monday Tuesday Wednesday Thursday
First Shift 0700-1600 Hrs
General 0900-1800 Hrs FM FM FM FM
Second Shift 1400-2300 Hrs DE DE DE DE
Night Shift 2200-0700 Hrs DE DE DE DE
1 As Sugested by Mr. Pranil there may be occasions that Electricans and Housekeepin
should not be overtime charged and has to be compenseted by offs
2 On 26th Jan , 15th Aug and 2nd October No Staff will be available as it is national H
Client: Deloitte
Location: Gurgaon
HK Deployment- Shift Wise
Designation Shift A Shift B General Shift 1General Shift 2
Timing 0700- 16001400- 2200 0800- 1700 0900- 1800
Supervisors 1 1
House Boys 9 8
Chamber Maid 1
Pantry Boys 1 1
Office Boy 1
Mail Boy
Client: Deloitte
Location: Gurgaon
Tech Deployment- Shift Wise
Designation Shift A Shift B Shift C General Shift
Timing 0700- 15001400- 2200 2130- 0730 0900- 1800
Sr Multi Skilled
Tech 1
13 16 17 126
8 5 4 21
upervisor Remarks
Friday Saturday Sunday House Keeping Supervisor will get leave on all Deloitte Holi
1 1
1 1 2
1 1
1 1 2
2 2 2 6
1 1 1 3
aids Remarks
Friday Saturday Sunday Total Manpower Chamber maids will have leave on all Deloitte Holidays
1 1 6 In case of any advanced (Latest by Thursday) special reque
1 1 6
1 1 6
0
3 3 0 18
0 0 3 3
s
Friday Saturday Sunday Total Manpower
1 1 1 7
1 1 3
1 1 1 7
1 1 1 7
3 4 4 24
1 0 0 4
Remarks
Friday Saturday Sunday On all Deloitte Holidays there will be that day and Day before will be treated
FM FM
DE
DE DE DE
OR Remarks
Friday Saturday Sunday All Deloitte Holidays will be trated as leave
AV / BMS AV / BMS
ments
at Electricans and Housekeeping may need to work some exteded hours, and there
enseted by offs
l be available as it is national Holiday
hift Wise
General Shift
General
3 Shift 4
Total
1200- 21001100- 2000
2
17
1 2
2
1
1 1
se Shift Time
Shift A A 0700- 1500
Total
Shift B B 1400-2200
1 Shift C C 2130-0730
G G A A A O G G
A A O C C C C C
C C C O B B B B
B B B B O A A A
es
Oct'11 DateNov'11 DateDec'11 Date Jan'12 Date Fab'12 Date
March'12 Date
April'12 Date
May'12 Date
1st &15th 5th& 19th 3rd &17th 7th&21st 4th&18th 4th&18th 1st&15th 6th&20th
8th & 12th & 10th
14th & 28th 11th&25th 11th&25th 8th &22nd 13th&27th
22nd 26th &24th
ll get leave on all Deloitte Holidays
G C C C O G G G B
C O B B B B B B O
B B O A A A A A A
A A A O C C C C C
May'12 Date
y will be cancelled and will be posponded to Sunday
22/06/11 23/06/11 24/06/11 25/06/11 26/06/11 27/06/11 28/06/11 29/06/11 30/06/11
B B O G G G A A A
A A A A A A O C C
O C C C C C C O B
C O B B B B B B O
DELOITTE CONSULTING INDIA PVT. LTD.
Critical Areas Temperature Reading
Floor Location 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00
Hub Room- 1
UPS Room
Breakout Area
Core-2 Core-2, DG Meter Reading Core-5 Core-5, DG Meter Reading Core-6 Core-6, DG Meter Reading
Total units Total units Total units
DATE consumed per consumed per consumed per Sign Remarks
KWH KVAH KWH KVAH KWH KVAH KWH KVAH KWH KVAH KWH KVAH
day day day
KWH KWH KWH
0 0 0