Mankhurd GA Drawings PDF
Mankhurd GA Drawings PDF
Mankhurd GA Drawings PDF
NOTES :-
CLEAR CARRIAGEWAY
10000
GENERAL :
1. ALL DIMENSION ARE IN MILLIMETERS & LEVELS ARE IN METER UNLESS OTHERWISE
SPECIFIED.
2. DIMENSIONS SHALL NOT BE SCALED, ONLY WRITTEN DIMENSIONS SHOULD BE
7 7
FOLLOWED.
3. THIS DRAWING SHOULD BE IN CONJUNCTION WITH GENERAL ARRANGEMENT DRAWING
AND OTHER RELATED DRAWING.
POCKET FOR EXPANSION JOINT
4. REFER SEPARATE DRAWING FOR SUPER STRUCTURE.
FRL @ CENTER
75MM WEARING
COAT (TYP.)
℄ CARRIAGE WAY & PILE CAP ℄ PILE CAP ( DIMENSION SHOULD BE
2.50% SLOPE FRL @ CENTER
7.789M 7.789M
CONFIRM WITH
MANUFACTURERS DRG.)
MATERIALS :
5. REINFORCING STEEL SHALL BE HYSD (TMT) BARS FE-500D, CONFIRMING TO IS-1786
INCLUDING LATEST AMENDMENTS.
6. GRADE OF CONCRETE SHALL BE AS FOLLOWS:
· CRASH BARRIER : M40
· PEDESTAL : M40
DIRT WALL
2500 2500 2500 RCC · PILE : M35
RCC BEARING
GIRDER · PILE CAP : M40
GIRDER WEEP
BEARING
HOLES RCC · PCC LEVELING COURSE : M15
PEDESTAL
6 RCC 6
PEDESTAL CONSTRUCTION
438
375
PILE CAP TOP
313
PILE CAP TOP
250
5.862 M 5.862 M
7. TEMPORARY STEEL CASING WITH NECESSARY GUIDE COLLAR MAY BE PROVIDED
500 DOWN TO 3.0m BELOW GROUND LEVEL AS PER THE SITE REQUIREMENT FOR
765 765
TYP. TYP. CONSTRUCTION PURPOSE. STEEL LINER 6MM THK. MAY BE PROVIDED AS PER CLAUSE
709.1.4 (a) IRC 78-2014.
8. PILE SHALL BE INSTALLED USING BENTONITE SLURRY OF PROPER CONSISTENCY &
WITH THE SAME TYPE OF EQUIPMENT & CONSTRUCTION PROCEDURE THAT ARE
2000
2000
PROPOSED TO BE ADOPTED FOR THE WORKING PILES.
9. CONCRETING FOR PILE SHALL BE CARRIED OUT IN A SINGLE CONTINUOUS
OPERATION. NO CONSTRUCTION JOINTS SHALL BE PERMITTED IN A PILE. TREMIE
CONCRETING SHALL BE RESORTED TO THE TOTAL TIME OF TREMIE CONCRETING IS
PILE CAP BOTTOM TO BE RESTRICTED WITHIN 4 HOURS FROM START TO APPROVAL FROM IC.
PILE CAP BOTTOM
3.862 M 3.862 M 10. THE PILE BORING, BORE STABILIZATION, CONCRETING ...etc. SHALL BE CARRIED OUT
150
STRICTLY IN ACCORDANCE WITH CLAUSE 1107 OF THE MoRT&H SPECIFICATION.
150
11. THE BOTTOM OF THE HOLE SHALL BE THOROUGHLY CLEANED BY EMPLOYING
5 150 750 2250 3000 2250 750 150 150 650 3000 650 150 SUITABLE MEANS AND LEVELS TAKEN. INCLUDING AT THE BOREHOLE BOTTOM TO 5
CONFIRM CORRECTNESS OF THE SHAFT LENGTH.
12. THE PERMISSIBLE TOLERANCES IN PILE INSTALLATION SHALL CONFORM TO
CLAUSE 1116 OF Mort&H SPECIFICATION AND CLAUSE 709 OF IRC:78-2014.
13. THE TRIMMING OF PILE HEAD SHALL BE COMPLETED BETWEEN 4 TO 7 DAYS OF
CASTING SHALL BE DONE CAREFULLY & CAUTIOUSLY TO AVOID DAMAGE TO THE REST
OF THE PILE.
PILE BOTTOM LVL. PILE BOTTOM LVL. 14. SLUMP FOR PILE CONCRETING SHALL BE 150mm TO 200mm AS PER MoRTH & IRC
-19.183 M -19.183 M
SPECIFICATION.
15.PILES SHALL BE VERTICAL, BORED CAST-IN-SITU.
16.THE TIP LEVEL OF PILE SHOWN IS AS PER GEOTECH REPORT. THE SOIL OBTAINED AT
THE TERMINATION DEPTH IS VISUALLY EXAMINED AND CROSS CHECKED AGAINST THE
SOIL PROFILE LOG BEFORE TERMINATING THE PILES.
SECTION A-A SECTION B-B 17.THE SHAFT LOAD CAPACITY OF PILE :
SCALE 1:50 SCALE 1:50 VERTICAL CAPACITY = 579 TONNES
SEISMIC VERTICAL CAPACITY = 723 TONNES
HORIZONTAL CAPACITY = 34 TONNES
4 18.MINIMUM ANCHORAGE FOR PILE IN ROCK = 2D. 4
B B
19. CORE RECOVERY > 90%
℄ CARRIAGE WAY,PIER CAP & PIER ℄ CARRIAGE WAY,PIER CAP & PIER
150
150
150
150
20.ROCK QUALITY DESIGNATION > 50%
650
650
Ø1000
1650
Ø1 750 2500 2500 2500 750
00
0
50
500
A A A A
4300
4300
3000
3000
400
3 3
Ø1 Ø10
00 1. G.M.(W) BB/P-12486 : GENERAL ARRANGEMENT DRAWING OF ROB.
2. DRG. NO.TP/DC-BR/HL-PC/2018-49-1/3 : FOR RCC GIRDER OF 20M
SPAN IN APPROACH PORTION
3. MRIDC/NGP/ROB/LC-MANKHURD /RCC SHEET : REINFORCEMENT
650
650
150
150
150
150 750 2250 3000 2250 750 150 150 9000 150
THIS DRAWING IS APPLICABLE FOR PWD ABUTMENT-A3
9000
B B
2 DRG.NO. MRIDC/CR/ROB/ MANKHURD /GA SHEET 0 OF 00 2
MRIDC
DY. CE/BR.D
SECTION :
LEGEND:- LEGEND:- DIVISION : MUMBAI
DESIGNATION SIGN.
= JACK LOCATION (PLAN) R.T.L. = RAIL TOP LEVEL AXEN / ROB
A2 A B C D E F G H J
A B C D E F G H J
NOTES :-
TOTAL WIDTH OF BRIDGE 10014 TOTAL WIDTH OF BRIDGE 10014
500 CLEAR CARRIAGEWAY 9014 SK 500 500 CLEAR CARRIAGEWAY 9014 SK 500 GENERAL :
9000SQ 9000SQ
1. ALL DIMENSION ARE IN MILLIMETERS & LEVELS ARE IN METER UNLESS OTHERWISE
SPECIFIED.
2. DIMENSIONS SHALL NOT BE SCALED, ONLY WRITTEN DIMENSIONS SHOULD BE
7 FOLLOWED.
300mm SLAB
℄OF CW 75MM WEARING COAT
300mm SLAB
℄OF CW 75MM WEARING COAT
3. THIS DRAWING SHOULD BE IN CONJUNCTION WITH GENERAL ARRANGEMENT DRAWING
7
(TYP) (TYP)
2.50 SLOPE 8.581 ℄OF PIER 2.50 SLOPE 8.581 ℄OF PIER ℄OF EJ AND OTHER RELATED DRAWING.
FRL 2.50 SLOPE FRL 2.50 SLOPE 8.581 4. REFER SEPARATE DRAWING FOR SUPER STRUCTURE.
FRL ℄OF BRNG ℄OF BRNG
17
MATERIALS :
37
* BEARING HEIGHT
* BEARING HEIGHT INCLUDED 5. REINFORCING STEEL SHALL BE HYSD (TMT) BARS FE-500D, CONFIRMING TO IS-1786
INCLUDED RCC RCC INCLUDING LATEST AMENDMENTS.
GIRDER GIRDER 6. GRADE OF CONCRETE SHALL BE AS FOLLOWS:
6.812 6.812
· CRASH BARRIER : M40
6.491 6.491
*509
*509
· PEDESTAL : M40
*446
*446
*384
*383
*321
*321
Pier Cap Top SOFFIT LVL. Pier Cap Top SOFFIT LVL.
6.491 BEARING · PIER : M40
Pier Cap top PEDESTAL
· PIER CAP : M40
600
600
600
734 2501 SK 2501 SK 2501 SK 762
2500 SQ 2500 SQ 2500 SQ
· PILE : M35
· PILE CAP : M40
1500
1500
1500
6
· PCC LEVELING COURSE : M15
900
900
900
6
4.991 4.991 4.991 CONSTRUCTION
Pier Cap Bottom Pier Cap Bottom Pier Cap Bottom
7. TEMPORARY STEEL CASING WITH NECESSARY GUIDE COLLAR MAY BE PROVIDED
1000
1000
1000
4.491 4.491 4.491
O.G.L. O.G.L. O.G.L. DOWN TO 3.0M BELOW GROUND LEVEL AS PER THE SITE REQUIREMENT FOR
3.991 3.991 3.991 CONSTRUCTION PURPOSE. STEEL LINER 6MM THK. MAY BE PROVIDED AS PER CLAUSE
Pile Cap Top Pile Cap Top Pile Cap Top 709.1.4 (A) IRC 78-2014.
8. PILE SHALL BE INSTALLED USING BENTONITE SLURRY OF PROPER CONSISTENCY &
WITH THE SAME TYPE OF EQUIPMENT & CONSTRUCTION PROCEDURE THAT ARE
1500
1500
1500
PROPOSED TO BE ADOPTED FOR THE WORKING PILES.
9. CONCRETING FOR PILE SHALL BE CARRIED OUT IN A SINGLE CONTINUOUS
OPERATION. NO CONSTRUCTION JOINTS SHALL BE PERMITTED IN A PILE. TREMIE
2.491 2.491 2.491 CONCRETING SHALL BE RESORTED TO THE TOTAL TIME OF TREMIE CONCRETING IS
Pile Cap Bottom Pile Cap Bottom Pile Cap Bottom
TO BE RESTRICTED WITHIN 4 HOURS FROM START TO APPROVAL FROM IC.
10. THE PILE BORING, BORE STABILIZATION, CONCRETING ...ETC. SHALL BE CARRIED OUT
STRICTLY IN ACCORDANCE WITH CLAUSE 1107 OF THE MORT&H SPECIFICATION.
11. THE BOTTOM OF THE HOLE SHALL BE THOROUGHLY CLEANED BY EMPLOYING
5 SUITABLE MEANS AND LEVELS TAKEN. INCLUDING AT THE BOREHOLE BOTTOM TO 5
Ø1000 Ø1000 Ø1000 Ø1000 Ø1000 Ø1000 CONFIRM CORRECTNESS OF THE SHAFT LENGTH.
000.000 000.000 000.000 12.THE PERMISSIBLE TOLERANCES IN PILE INSTALLATION SHALL CONFORM TO CLAUSE
Pile Cap Bottom Pile Cap Bottom Pile Cap Bottom 1116 OF MORT&H SPECIFICATION AND CLAUSE 709 OF IRC:78-2014.
650 3000 650 650 3000 650 650 3000 650
13.THE TRIMMING OF PILE HEAD SHALL BE COMPLETED BETWEEN 4 TO 7 DAYS OF
CASTING SHALL BE DONE CAREFULLY & CAUTIOUSLY TO AVOID DAMAGE TO THE
SECTION A-A SECTION B-B SECTION B-B REST OF THE PILE.
SCALE 1:50 SCALE 1:50 SCALE 1:50
14.SLUMP FOR PILE CONCRETING SHALL BE 150MM TO 200MM AS PER MORTH & IRC
SPECIFICATION.
15.PILES SHALL BE VERTICAL, BORED CAST-IN-SITU.
16.THE TIP LEVEL OF PILE SHOWN IS AS PER GEOTECH REPORT. THE SOIL OBTAINED AT
THE TERMINATION DEPTH IS VISUALLY EXAMINED AND CROSS CHECKED AGAINST THE
SOIL PROFILE LOG BEFORE TERMINATING THE PILES.
17.THE SHAFT LOAD CAPACITY OF PILE :
VERTICAL CAPACITY = 630 TONNES
SEISMIC VERTICAL CAPACITY = 787 TONNES
HORIZONTAL CAPACITY = 34 TONNES
18.MINIMUM ANCHORAGE FOR PILE IN ROCK = 2D.
4
4
℄OF EJ
℄OF BRNG ℄OF BRNG C
FRL
8.581 50 OF EJ ℄OF FOOTING & PIER
℄OF PIER
C OF CW
150 650 1500
4300
1500 650 150 TO PANVEL
℄
9000
TO CST 782 2507 SK 2508 SK 2508 SK 696 TO PANVEL
Ø1000 2499 SQ 2500 SQ 2500 SQ
650
℄OF BRNG
765
JACK LOCATION
(TYP)
702
RCC RCC
GIRDER GIRDER B B
℄OF EJ
548
BRNG
1500
PIER
℄OF 2500
P1
B B
Ø2000
452
6.812 6.812 A A
4300
798
Pedestal
Pedestal A A
BEARING
1500
798 452 548 702 734 2501 SK 2501 SK 2501 SK 762 PEDESTAL
600
1250 1250
150 650
C PCC
NOTES :-
TOTAL WIDTH OF BRIDGE 10002 TOTAL WIDTH OF BRIDGE 10002 GENERAL :
500 CLEAR CARRIAGEWAY 9001 SK 500 500 CLEAR CARRIAGEWAY 9001 SK 500
℄OF EJ 1. ALL DIMENSION ARE IN MILLIMETERS & LEVELS ARE IN METER UNLESS OTHERWISE
9000SQ 9000SQ 9.209 SPECIFIED.
FRL ℄OF BRNG ℄OF BRNG 2. DIMENSIONS SHALL NOT BE SCALED, ONLY WRITTEN DIMENSIONS SHOULD BE
7 FOLLOWED. 7
3. THIS DRAWING SHOULD BE IN CONJUNCTION WITH GENERAL ARRANGEMENT DRAWING
AND OTHER RELATED DRAWING.
300mm SLAB
℄OF CW 75MM WEARING COAT
300mm SLAB
℄OF CW 75MM WEARING COAT
RCC RCC 4. REFER SEPARATE DRAWING FOR SUPER STRUCTURE.
(TYP) (TYP)
2.50 SLOPE 9.209 ℄OF PIER 2.50 SLOPE 9.209 ℄OF PIER GIRDER GIRDER
FRL 2.50 SLOPE FRL 2.50 SLOPE
7.440
MATERIALS :
SOFFIT LVL.
7.119 5. REINFORCING STEEL SHALL BE HYSD (TMT) BARS FE-500D, CONFIRMING TO IS-1786
8 Pier Cap top
INCLUDING LATEST AMENDMENTS.
600
* BEARING HEIGHT * BEARING HEIGHT 6. GRADE OF CONCRETE SHALL BE AS FOLLOWS:
INCLUDED 10 · CRASH BARRIER : M40
1500
INCLUDED
· PEDESTAL : M40
900
7.440 7.440
· PIER : M40
7.119 7.119
*509
*446
· PIER CAP : M40
*384
5.619
*321
Pier Cap Top SOFFIT LVL. Pier Cap Top SOFFIT LVL.
Pier Cap Bottom · PILE : M35
766 2501 SK 2501 SK 2501 SK 731 · PILE CAP : M40
600
600
1000
744 2500 2500 2500 756 5.119
6 2500 SQ 2500 SQ 2500 SQ O.G.L. · PCC LEVELING COURSE : M15
6
1500
1500
4.619
Pile Cap Top CONSTRUCTION
900
900
4.991
5.619 5.619 Pier Cap Bottom 7. TEMPORARY STEEL CASING WITH NECESSARY GUIDE COLLAR MAY BE PROVIDED
1500
Pier Cap Bottom Pier Cap Bottom DOWN TO 3.0M BELOW GROUND LEVEL AS PER THE SITE REQUIREMENT FOR
CONSTRUCTION PURPOSE. STEEL LINER 6MM THK. MAY BE PROVIDED AS PER CLAUSE
1000
1000
5.119 5.119
O.G.L. O.G.L. 709.1.4 (A) IRC 78-2014.
3.119
4.619 4.619 Pile Cap Bottom 8. PILE SHALL BE INSTALLED USING BENTONITE SLURRY OF PROPER CONSISTENCY &
Pile Cap Top Pile Cap Top WITH THE SAME TYPE OF EQUIPMENT & CONSTRUCTION PROCEDURE THAT ARE
PROPOSED TO BE ADOPTED FOR THE WORKING PILES.
9. CONCRETING FOR PILE SHALL BE CARRIED OUT IN A SINGLE CONTINUOUS
1500
1500
OPERATION. NO CONSTRUCTION JOINTS SHALL BE PERMITTED IN A PILE. TREMIE
CONCRETING SHALL BE RESORTED TO THE TOTAL TIME OF TREMIE CONCRETING IS
Ø1000 Ø1000
TO BE RESTRICTED WITHIN 4 HOURS FROM START TO APPROVAL FROM IC.
3.119 3.119
Pile Cap Bottom Pile Cap Bottom 000.000 10. THE PILE BORING, BORE STABILIZATION, CONCRETING ...ETC. SHALL BE CARRIED OUT
Pile Cap Bottom STRICTLY IN ACCORDANCE WITH CLAUSE 1107 OF THE MORT&H SPECIFICATION.
650 3000 650
11. THE BOTTOM OF THE HOLE SHALL BE THOROUGHLY CLEANED BY EMPLOYING
5 SUITABLE MEANS AND LEVELS TAKEN. INCLUDING AT THE BOREHOLE BOTTOM TO
SECTION B-B 5
CONFIRM CORRECTNESS OF THE SHAFT LENGTH.
SCALE 1:50
12.THE PERMISSIBLE TOLERANCES IN PILE INSTALLATION SHALL CONFORM TO CLAUSE
Ø1000 Ø1000 Ø1000 Ø1000 1116 OF MORT&H SPECIFICATION AND CLAUSE 709 OF IRC:78-2014.
000.000 000.000 13.THE TRIMMING OF PILE HEAD SHALL BE COMPLETED BETWEEN 4 TO 7 DAYS OF
Pile Cap Bottom Pile Cap Bottom CASTING SHALL BE DONE CAREFULLY & CAUTIOUSLY TO AVOID DAMAGE TO THE
650 3000 650 650 3000 650
REST OF THE PILE.
14.SLUMP FOR PILE CONCRETING SHALL BE 150MM TO 200MM AS PER MORTH & IRC
SECTION A-A SECTION B-B SPECIFICATION.
SCALE 1:50 SCALE 1:50
15.PILES SHALL BE VERTICAL, BORED CAST-IN-SITU.
16.THE TIP LEVEL OF PILE SHOWN IS AS PER GEOTECH REPORT. THE SOIL OBTAINED AT
THE TERMINATION DEPTH IS VISUALLY EXAMINED AND CROSS CHECKED AGAINST THE
SOIL PROFILE LOG BEFORE TERMINATING THE PILES.
17.THE SHAFT LOAD CAPACITY OF PILE :
VERTICAL CAPACITY = 630 TONNES
SEISMIC VERTICAL CAPACITY = 787 TONNES
HORIZONTAL CAPACITY = 34 TONNES
18.MINIMUM ANCHORAGE FOR PILE IN ROCK = 2D.
4
4
℄OF EJ
FRL ℄OF BRNG ℄OF BRNG
50 OF EJ
C ℄OF PIER
9.209
℄
OF FOOTING & PIER C
150 650 1500
4300
1500 650 150
℄OF CW
TO PANVEL
9000
TO CST 766 2501 SK 2501 SK 2501 SK 731 TO PANVEL
650
℄OF BRNG
765
RCC RCC (TYP) JACK LOCATION
700
GIRDER GIRDER
B B
℄OF EJ
1500
550
BRNG
PIER
B B
℄OF 2500
P2
Ø2000
454
7.440 453.8763 453.8763
A A
4300
SOFFIT LVL.
Bearing
3
Pedestal 3
796
A A
796.1237
1500
BEARING
744 2500 2500 2500 756 PEDESTAL
Ø1000
C
1500
TO CHEMBUR,SION
150 650
SCALE 1:50
C PCC
NOTES :-
TOTAL WIDTH OF BRIDGE 10001 TOTAL WIDTH OF BRIDGE 10001
500 CLEAR CARRIAGEWAY 9001 SK 500 500 CLEAR CARRIAGEWAY 9001 SK 500 GENERAL :
9000SQ 9000SQ
9.838 ℄OF EJ 1. ALL DIMENSION ARE IN MILLIMETERS & LEVELS ARE IN METER UNLESS OTHERWISE
FRL ℄OF BRNG ℄OF BRNG SPECIFIED.
2. DIMENSIONS SHALL NOT BE SCALED, ONLY WRITTEN DIMENSIONS SHOULD BE
7 FOLLOWED. 7
3. THIS DRAWING SHOULD BE IN CONJUNCTION WITH GENERAL ARRANGEMENT DRAWING
300mm SLAB
℄OF CW 75MM WEARING COAT
300mm SLAB
℄
OF CW 75MM WEARING COAT
AND OTHER RELATED DRAWING.
(TYP) (TYP)
2.50 SLOPE 9.838 ℄OF PIER 2.50 SLOPE 9.838 ℄OF PIER RCC
GIRDER
RCC
GIRDER
4. REFER SEPARATE DRAWING FOR SUPER STRUCTURE.
FRL 2.50 SLOPE FRL 2.50 SLOPE
600
INCLUDED INCLUDING LATEST AMENDMENTS.
INCLUDED
6. GRADE OF CONCRETE SHALL BE AS FOLLOWS:
1500
· CRASH BARRIER : M40
· PEDESTAL : M40
900
7.748 8.067 7.748 8.069
*508
*508
·
*446
PIER : M40
*446
*381
*383
*320
*318
Pier Cap Top SOFFIT LVL. Pier Cap Top SOFFIT LVL.
6.248 · PIER CAP : M40
Pier Cap Bottom · PILE : M35
600
600
752 2581 SK 2499 SK 2502 SK 666 760 2500 2500 2500 740 · PILE CAP : M40
1000
5.748
2570 SQ 2496 SQ 2501 SQ O.G.L. · PCC LEVELING COURSE : M15
1500
1500
6
5.248 6
900
900
Pile Cap Top CONSTRUCTION
6.248 6.248
Pier Cap Bottom Pier Cap Bottom 7. TEMPORARY STEEL CASING WITH NECESSARY GUIDE COLLAR MAY BE PROVIDED
1500
DOWN TO 3.0M BELOW GROUND LEVEL AS PER THE SITE REQUIREMENT FOR
1000
1000
5.748 5.748
O.G.L. O.G.L. CONSTRUCTION PURPOSE. STEEL LINER 6MM THK. MAY BE PROVIDED AS PER CLAUSE
5.248 5.248 3.748 709.1.4 (A) IRC 78-2014.
Pile Cap Top Pile Cap Top Pile Cap Bottom 8. PILE SHALL BE INSTALLED USING BENTONITE SLURRY OF PROPER CONSISTENCY &
WITH THE SAME TYPE OF EQUIPMENT & CONSTRUCTION PROCEDURE THAT ARE
PROPOSED TO BE ADOPTED FOR THE WORKING PILES.
1500
1500
9. CONCRETING FOR PILE SHALL BE CARRIED OUT IN A SINGLE CONTINUOUS
OPERATION. NO CONSTRUCTION JOINTS SHALL BE PERMITTED IN A PILE. TREMIE
Ø1000 Ø1000 CONCRETING SHALL BE RESORTED TO THE TOTAL TIME OF TREMIE CONCRETING IS
3.748 3.748
Pile Cap Bottom Pile Cap Bottom TO BE RESTRICTED WITHIN 4 HOURS FROM START TO APPROVAL FROM IC.
000.000 10. THE PILE BORING, BORE STABILIZATION, CONCRETING ...ETC. SHALL BE CARRIED OUT
Pile Cap Bottom
650 3000 650 STRICTLY IN ACCORDANCE WITH CLAUSE 1107 OF THE MORT&H SPECIFICATION.
11. THE BOTTOM OF THE HOLE SHALL BE THOROUGHLY CLEANED BY EMPLOYING
5 SUITABLE MEANS AND LEVELS TAKEN. INCLUDING AT THE BOREHOLE BOTTOM TO
SECTION B-B 5
SCALE 1:50 CONFIRM CORRECTNESS OF THE SHAFT LENGTH.
Ø1000 Ø1000 Ø1000 Ø1000 12.THE PERMISSIBLE TOLERANCES IN PILE INSTALLATION SHALL CONFORM TO CLAUSE
000.000 000.000 1116 OF MORT&H SPECIFICATION AND CLAUSE 709 OF IRC:78-2014.
Pile Cap Bottom Pile Cap Bottom 13.THE TRIMMING OF PILE HEAD SHALL BE COMPLETED BETWEEN 4 TO 7 DAYS OF
650 3000 650 650 3000 650
CASTING SHALL BE DONE CAREFULLY & CAUTIOUSLY TO AVOID DAMAGE TO THE
REST OF THE PILE.
SECTION A-A SECTION B-B 14.SLUMP FOR PILE CONCRETING SHALL BE 150MM TO 200MM AS PER MORTH & IRC
SCALE 1:50 SCALE 1:50
SPECIFICATION.
15.PILES SHALL BE VERTICAL, BORED CAST-IN-SITU.
16.THE TIP LEVEL OF PILE SHOWN IS AS PER GEOTECH REPORT. THE SOIL OBTAINED AT
THE TERMINATION DEPTH IS VISUALLY EXAMINED AND CROSS CHECKED AGAINST THE
FRL SOIL PROFILE LOG BEFORE TERMINATING THE PILES.
17.THE SHAFT LOAD CAPACITY OF PILE :
VERTICAL CAPACITY = 630 TONNES
SEISMIC VERTICAL CAPACITY = 787 TONNES
HORIZONTAL CAPACITY = 34 TONNES
18.MINIMUM ANCHORAGE FOR PILE IN ROCK = 2D.
4
4
700
RCC RCC B B
GIRDER GIRDER
℄OF EJ
550
℄OF BRNG
1500
P3
PIER
546
B B
8.067 8.069 Ø2000 A A
SOFFIT LVL. SOFFIT LVL.
4300
Bearing
704
3
Pedestal 3
A A
704 546 550 700 752 2581 SK 2499 SK 2502 SK 666 BEARING
1500
600
Ø1000 TO CHEMBUR,SION C
1500
150 650
900
C PCC
NOTES :-
TOTAL WIDTH OF BRIDGE 10025 TOTAL WIDTH OF BRIDGE 10000
501 CLEAR CARRIAGEWAY 9023 SK 501 500 CLEAR CARRIAGEWAY 9000 500 GENERAL :
9000SQ
1. ALL DIMENSION ARE IN MILLIMETERS & LEVELS ARE IN METER UNLESS OTHERWISE
8.455 ℄OF EJ SPECIFIED.
FRL ℄OF BRNG ℄OF BRNG 2. DIMENSIONS SHALL NOT BE SCALED, ONLY WRITTEN DIMENSIONS SHOULD BE
7 ℄OF PIER FOLLOWED. 7
300mm SLAB
75MM WEARING COAT
300mm SLAB
℄OF CW 75MM WEARING COAT 3. THIS DRAWING SHOULD BE IN CONJUNCTION WITH GENERAL ARRANGEMENT DRAWING
(TYP) (TYP)
2.50 SLOPE 8.455 ℄OF CW 2.50 SLOPE 8.455 ℄OF PIER
AND OTHER RELATED DRAWING.
4. REFER SEPARATE DRAWING FOR SUPER STRUCTURE.
FRL 2.50 SLOPE FRL 2.50 SLOPE RCC RCC
GIRDER GIRDER
MATERIALS :
26 6.685 6.686
* BEARING HEIGHT * BEARING HEIGHT SOFFIT LVL. SOFFIT LVL. 5. REINFORCING STEEL SHALL BE HYSD (TMT) BARS FE-500D, CONFIRMING TO IS-1786
6.365
INCLUDED INCLUDED 5 Pier Cap top INCLUDING LATEST AMENDMENTS.
600
6. GRADE OF CONCRETE SHALL BE AS FOLLOWS:
· CRASH BARRIER : M40
1500
6.365 6.685 6.365 6.686 · PEDESTAL : M40
*508
*509
*446
*446
*383
*384
*321
*320
SOFFIT LVL. SOFFIT LVL.
900
Pier Cap Top Pier Cap Top · PIER : M40
756 2500 2500 2500
· PIER CAP : M40
744 4.865
600
600
776 2506 SK 2506 SK 2506 SK 705 · PILE : M35
Pier Cap Bottom
2500 SQ 2500 SQ 2500 SQ · PILE CAP : M40
1500
1500
1000
4.365 · PCC LEVELING COURSE : M15
6 O.G.L.
900
900
6
4.991 3.865
4.865 4.865 Pier Cap Bottom Pile Cap Top
CONSTRUCTION
Pier Cap Bottom Pier Cap Bottom
7. TEMPORARY STEEL CASING WITH NECESSARY GUIDE COLLAR MAY BE PROVIDED
1000
1000
4.365 4.365
1500
O.G.L. O.G.L. DOWN TO 3.0M BELOW GROUND LEVEL AS PER THE SITE REQUIREMENT FOR
CONSTRUCTION PURPOSE. STEEL LINER 6MM THK. MAY BE PROVIDED AS PER CLAUSE
3.865 3.865
Pile Cap Top Pile Cap Top 709.1.4 (A) IRC 78-2014.
2.365 8. PILE SHALL BE INSTALLED USING BENTONITE SLURRY OF PROPER CONSISTENCY &
Pile Cap Bottom
WITH THE SAME TYPE OF EQUIPMENT & CONSTRUCTION PROCEDURE THAT ARE
1500
1500
PROPOSED TO BE ADOPTED FOR THE WORKING PILES.
9. CONCRETING FOR PILE SHALL BE CARRIED OUT IN A SINGLE CONTINUOUS
OPERATION. NO CONSTRUCTION JOINTS SHALL BE PERMITTED IN A PILE. TREMIE
2.365 2.365 CONCRETING SHALL BE RESORTED TO THE TOTAL TIME OF TREMIE CONCRETING IS
Pile Cap Bottom Pile Cap Bottom Ø1000 Ø1000 TO BE RESTRICTED WITHIN 4 HOURS FROM START TO APPROVAL FROM IC.
000.000
10. THE PILE BORING, BORE STABILIZATION, CONCRETING ...ETC. SHALL BE CARRIED OUT
Pile Cap Bottom STRICTLY IN ACCORDANCE WITH CLAUSE 1107 OF THE MORT&H SPECIFICATION.
650 3000 650 11. THE BOTTOM OF THE HOLE SHALL BE THOROUGHLY CLEANED BY EMPLOYING
5 SUITABLE MEANS AND LEVELS TAKEN. INCLUDING AT THE BOREHOLE BOTTOM TO 5
Ø1000 Ø1000 Ø1000 Ø1000 SECTION B-B CONFIRM CORRECTNESS OF THE SHAFT LENGTH.
000.000 000.000
SCALE 1:50 12.THE PERMISSIBLE TOLERANCES IN PILE INSTALLATION SHALL CONFORM TO CLAUSE
Pile Cap Bottom Pile Cap Bottom 1116 OF MORT&H SPECIFICATION AND CLAUSE 709 OF IRC:78-2014.
650 3000 650 650 3000 650 13.THE TRIMMING OF PILE HEAD SHALL BE COMPLETED BETWEEN 4 TO 7 DAYS OF
CASTING SHALL BE DONE CAREFULLY & CAUTIOUSLY TO AVOID DAMAGE TO THE
SECTION A-A SECTION B-B REST OF THE PILE.
SCALE 1:50 SCALE 1:50 14.SLUMP FOR PILE CONCRETING SHALL BE 150MM TO 200MM AS PER MORTH & IRC
SPECIFICATION.
15.PILES SHALL BE VERTICAL, BORED CAST-IN-SITU.
16.THE TIP LEVEL OF PILE SHOWN IS AS PER GEOTECH REPORT. THE SOIL OBTAINED AT
THE TERMINATION DEPTH IS VISUALLY EXAMINED AND CROSS CHECKED AGAINST THE
SOIL PROFILE LOG BEFORE TERMINATING THE PILES.
17.THE SHAFT LOAD CAPACITY OF PILE :
VERTICAL CAPACITY = 630 TONNES
SEISMIC VERTICAL CAPACITY = 787 TONNES
HORIZONTAL CAPACITY = 34 TONNES
18.MINIMUM ANCHORAGE FOR PILE IN ROCK = 2D.
4
4
720
(TYP)
RCC RCC B B
(TYP)
700
℄OF EJ
GIRDER GIRDER
500
2440
P8
PIER
1500
499
B B A
Ø2000 A
6.685 6.686
SOFFIT LVL. SOFFIT LVL.
4300
721
Bearing
3
Pedestal 3
A A BEARING
776 2506 SK 2506 SK 2506 SK 705
1500
Ø1000 TO CHEMBUR,SION
C
1500
150 650
900
C PCC
NOTES :-
TOTAL WIDTH OF BRIDGE 10000 TOTAL WIDTH OF BRIDGE 10000
500 CLEAR CARRIAGEWAY 9000 500 500 CLEAR CARRIAGEWAY 9000 500 GENERAL :
9.121 ℄OF EJ 1. ALL DIMENSION ARE IN MILLIMETERS & LEVELS ARE IN METER UNLESS OTHERWISE
FRL ℄OF BRNG ℄OF BRNG SPECIFIED.
2. DIMENSIONS SHALL NOT BE SCALED, ONLY WRITTEN DIMENSIONS SHOULD BE
7 ℄OF PIER ℄OF PIER FOLLOWED. 7
75MM WEARING COAT 75MM WEARING COAT 3. THIS DRAWING SHOULD BE IN CONJUNCTION WITH GENERAL ARRANGEMENT DRAWING
300mm SLAB (TYP) 300mm SLAB (TYP) AND OTHER RELATED DRAWING.
2.50 SLOPE 9.121 ℄OF CW 2.50 SLOPE
℄
9.121 OF CW RCC RCC
4. REFER SEPARATE DRAWING FOR SUPER STRUCTURE.
FRL 2.50 SLOPE FRL 2.50 SLOPE GIRDER GIRDER
600
INCLUDED INCLUDED INCLUDING LATEST AMENDMENTS.
6. GRADE OF CONCRETE SHALL BE AS FOLLOWS:
1500
· CRASH BARRIER : M40
900
7.031 7.352 7.031 7.352 · PEDESTAL : M40
*508
*508
*446
*446
*383
*383
*321
*321
Pier Cap Top SOFFIT LVL. Pier Cap Top SOFFIT LVL. · PIER : M40
5.531
Pier Cap Bottom · PIER CAP : M40
600
600
748 2500 2500 2500 752 752 2500 2500 2500 748 · PILE : M35
1000
5.031 · PILE CAP : M40
O.G.L.
1500
1500
6
· PCC LEVELING COURSE : M15
4.531 6
900
900
Pile Cap Top
CONSTRUCTION
5.531 5.531
Pier Cap Bottom Pier Cap Bottom
1500
7. TEMPORARY STEEL CASING WITH NECESSARY GUIDE COLLAR MAY BE PROVIDED
1000
1000
5.031 5.031 DOWN TO 3.0M BELOW GROUND LEVEL AS PER THE SITE REQUIREMENT FOR
O.G.L. O.G.L.
CONSTRUCTION PURPOSE. STEEL LINER 6MM THK. MAY BE PROVIDED AS PER CLAUSE
4.531 4.531 3.031 709.1.4 (A) IRC 78-2014.
Pile Cap Top Pile Cap Top Pile Cap Bottom
8. PILE SHALL BE INSTALLED USING BENTONITE SLURRY OF PROPER CONSISTENCY &
WITH THE SAME TYPE OF EQUIPMENT & CONSTRUCTION PROCEDURE THAT ARE
PROPOSED TO BE ADOPTED FOR THE WORKING PILES.
1500
1500
9. CONCRETING FOR PILE SHALL BE CARRIED OUT IN A SINGLE CONTINUOUS
OPERATION. NO CONSTRUCTION JOINTS SHALL BE PERMITTED IN A PILE. TREMIE
3.031 3.031 Ø1000 Ø1000 CONCRETING SHALL BE RESORTED TO THE TOTAL TIME OF TREMIE CONCRETING IS
Pile Cap Bottom Pile Cap Bottom TO BE RESTRICTED WITHIN 4 HOURS FROM START TO APPROVAL FROM IC.
000.000
Pile Cap Bottom 10. THE PILE BORING, BORE STABILIZATION, CONCRETING ...ETC. SHALL BE CARRIED OUT
650 3000 650 STRICTLY IN ACCORDANCE WITH CLAUSE 1107 OF THE MORT&H SPECIFICATION.
11. THE BOTTOM OF THE HOLE SHALL BE THOROUGHLY CLEANED BY EMPLOYING
5 SECTION B-B SUITABLE MEANS AND LEVELS TAKEN. INCLUDING AT THE BOREHOLE BOTTOM TO 5
SCALE 1:50 CONFIRM CORRECTNESS OF THE SHAFT LENGTH.
Ø1000 Ø1000 Ø1000 Ø1000
12.THE PERMISSIBLE TOLERANCES IN PILE INSTALLATION SHALL CONFORM TO CLAUSE
000.000 000.000 1116 OF MORT&H SPECIFICATION AND CLAUSE 709 OF IRC:78-2014.
Pile Cap Bottom Pile Cap Bottom
650 3000 650 650 3000 650 13.THE TRIMMING OF PILE HEAD SHALL BE COMPLETED BETWEEN 4 TO 7 DAYS OF
CASTING SHALL BE DONE CAREFULLY & CAUTIOUSLY TO AVOID DAMAGE TO THE
SECTION A-A SECTION B-B REST OF THE PILE.
SCALE 1:50 SCALE 1:50 14.SLUMP FOR PILE CONCRETING SHALL BE 150MM TO 200MM AS PER MORTH & IRC
SPECIFICATION.
15.PILES SHALL BE VERTICAL, BORED CAST-IN-SITU.
16.THE TIP LEVEL OF PILE SHOWN IS AS PER GEOTECH REPORT. THE SOIL OBTAINED AT
THE TERMINATION DEPTH IS VISUALLY EXAMINED AND CROSS CHECKED AGAINST THE
SOIL PROFILE LOG BEFORE TERMINATING THE PILES.
17.THE SHAFT LOAD CAPACITY OF PILE :
VERTICAL CAPACITY = 630 TONNES
SEISMIC VERTICAL CAPACITY = 787 TONNES
HORIZONTAL CAPACITY = 34 TONNES
18.MINIMUM ANCHORAGE FOR PILE IN ROCK = 2D.
4
4
JACK LOCATION
720
(TYP) (TYP)
RCC RCC B B
(TYP)
700
℄OF EJ
GIRDER GIRDER
500
℄OF BRNG
PIER 700
P9
1500
(TYP)
500
B B A
(TYP)
A
700
7.352 7.352 Ø2000
SOFFIT LVL. SOFFIT LVL.
4300
720
Bearing
3
Pedestal 3
A A
720 500 500 720 748 2500 2500 2500 752
600
1500
Ø1000 TO CHEMBUR,SION C
1500
150 650
SCALE 1:50
C PCC
NOTES :-
TOTAL WIDTH OF BRIDGE 10000 TOTAL WIDTH OF BRIDGE 10000
GENERAL :
500 CLEAR CARRIAGEWAY 9000 500 500 CLEAR CARRIAGEWAY 9000 500
℄OF EJ 1. ALL DIMENSION ARE IN MILLIMETERS & LEVELS ARE IN METER UNLESS OTHERWISE
9.786
SPECIFIED.
FRL ℄OF BRNG ℄OF BRNG 2. DIMENSIONS SHALL NOT BE SCALED, ONLY WRITTEN DIMENSIONS SHOULD BE
7 FOLLOWED.
℄OF PIER ℄OF PIER 3. THIS DRAWING SHOULD BE IN CONJUNCTION WITH GENERAL ARRANGEMENT DRAWING
7
75MM WEARING COAT 75MM WEARING COAT
300mm SLAB 300mm SLAB AND OTHER RELATED DRAWING.
(TYP) (TYP)
2.50 SLOPE 9.786 ℄OF CW 2.50 SLOPE 9.786 ℄OF CW RCC RCC 4. REFER SEPARATE DRAWING FOR SUPER STRUCTURE.
FRL 2.50 SLOPE FRL 2.50 SLOPE GIRDER GIRDER
8.017 8.017
MATERIALS :
SOFFIT LVL. SOFFIT LVL.
2 2 7.696
Pier Cap top 5. REINFORCING STEEL SHALL BE HYSD (TMT) BARS FE-500D, CONFIRMING TO IS-1786
* BEARING HEIGHT * BEARING HEIGHT INCLUDING LATEST AMENDMENTS.
600
INCLUDED INCLUDED
6. GRADE OF CONCRETE SHALL BE AS FOLLOWS:
1500
· CRASH BARRIER : M40
· PEDESTAL : M40
900
7.696 8.017 7.696 8.017
*508
*508
· PIER : M40
*446
*446
*383
*383
*321
*321
Pier Cap Top SOFFIT LVL. Pier Cap Top SOFFIT LVL.
6.196 · PIER CAP : M40
Pier Cap Bottom · PILE : M35
600
600
748 2500 2500 2500 752 752 2501 2498 2501 748
· PILE CAP : M40
1000
5.969
O.G.L. · PCC LEVELING COURSE : M15
1500
1500
6
6
5.196
900
900
Pile Cap Top CONSTRUCTION
6.196 6.196
Pier Cap Bottom Pier Cap Bottom 7. TEMPORARY STEEL CASING WITH NECESSARY GUIDE COLLAR MAY BE PROVIDED
1500
DOWN TO 3.0M BELOW GROUND LEVEL AS PER THE SITE REQUIREMENT FOR
1000
1000
5.969 5.969
O.G.L. O.G.L. CONSTRUCTION PURPOSE. STEEL LINER 6MM THK. MAY BE PROVIDED AS PER CLAUSE
5.196 5.196 3.696
709.1.4 (A) IRC 78-2014.
Pile Cap Top Pile Cap Top Pile Cap Bottom 8. PILE SHALL BE INSTALLED USING BENTONITE SLURRY OF PROPER CONSISTENCY &
WITH THE SAME TYPE OF EQUIPMENT & CONSTRUCTION PROCEDURE THAT ARE
PROPOSED TO BE ADOPTED FOR THE WORKING PILES.
1500
1500
9. CONCRETING FOR PILE SHALL BE CARRIED OUT IN A SINGLE CONTINUOUS
OPERATION. NO CONSTRUCTION JOINTS SHALL BE PERMITTED IN A PILE. TREMIE
CONCRETING SHALL BE RESORTED TO THE TOTAL TIME OF TREMIE CONCRETING IS
3.696 3.696 Ø1000 Ø1000
Pile Cap Bottom Pile Cap Bottom TO BE RESTRICTED WITHIN 4 HOURS FROM START TO APPROVAL FROM IC.
000.000 10. THE PILE BORING, BORE STABILIZATION, CONCRETING ...ETC. SHALL BE CARRIED OUT
Pile Cap Bottom
650 3000 650 STRICTLY IN ACCORDANCE WITH CLAUSE 1107 OF THE MORT&H SPECIFICATION.
11. THE BOTTOM OF THE HOLE SHALL BE THOROUGHLY CLEANED BY EMPLOYING
5 SUITABLE MEANS AND LEVELS TAKEN. INCLUDING AT THE BOREHOLE BOTTOM TO
SECTION B-B 5
SCALE 1:50
CONFIRM CORRECTNESS OF THE SHAFT LENGTH.
Ø1000 Ø1000 Ø1000 Ø1000 12.THE PERMISSIBLE TOLERANCES IN PILE INSTALLATION SHALL CONFORM TO CLAUSE
000.000 000.000 1116 OF MORT&H SPECIFICATION AND CLAUSE 709 OF IRC:78-2014.
Pile Cap Bottom Pile Cap Bottom 13.THE TRIMMING OF PILE HEAD SHALL BE COMPLETED BETWEEN 4 TO 7 DAYS OF
650 3000 650 650 3000 650
OF BRNG
CASTING SHALL BE DONE CAREFULLY & CAUTIOUSLY TO AVOID DAMAGE TO THE
REST OF THE PILE.
SECTION A-A SECTION B-B 14.SLUMP FOR PILE CONCRETING SHALL BE 150MM TO 200MM AS PER MORTH & IRC
SCALE 1:50 SCALE 1:50
SPECIFICATION.
15.PILES SHALL BE VERTICAL, BORED CAST-IN-SITU.
16.THE TIP LEVEL OF PILE SHOWN IS AS PER GEOTECH REPORT. THE SOIL OBTAINED AT
THE TERMINATION DEPTH IS VISUALLY EXAMINED AND CROSS CHECKED AGAINST THE
SOIL PROFILE LOG BEFORE TERMINATING THE PILES.
17.THE SHAFT LOAD CAPACITY OF PILE :
VERTICAL CAPACITY = 630 TONNES
SEISMIC VERTICAL CAPACITY = 787 TONNES
HORIZONTAL CAPACITY = 34 TONNES
18.MINIMUM ANCHORAGE FOR PILE IN ROCK = 2D.
4
4
720
(TYP)
RCC RCC
GIRDER GIRDER B
℄OF EJ
1500
500
℄OF BRNG
PIER
B B
P10
Ø2000
500
4300
8.017 8.017 A
SOFFIT LVL. SOFFIT LVL.
3 Bearing
3
720
Pedestal A A
1500
Ø1000
C
1500
TO CHEMBUR,SION
150 650
C PCC
NOTES :-
TOTAL WIDTH OF BRIDGE 10000 TOTAL WIDTH OF BRIDGE 10000
500 CLEAR CARRIAGEWAY 9000 500 500 CLEAR CARRIAGEWAY 9000 500 GENERAL :
9.653 ℄OF EJ
FRL ℄OF BRNG ℄OF BRNG 1. ALL DIMENSION ARE IN MILLIMETERS & LEVELS ARE IN METER UNLESS OTHERWISE
SPECIFIED.
2. DIMENSIONS SHALL NOT BE SCALED, ONLY WRITTEN DIMENSIONS SHOULD BE
7 ℄OF PIER ℄OF PIER FOLLOWED. 7
75MM WEARING COAT 75MM WEARING COAT 3. THIS DRAWING SHOULD BE IN CONJUNCTION WITH GENERAL ARRANGEMENT DRAWING
300mm SLAB 300mm SLAB RCC RCC AND OTHER RELATED DRAWING.
(TYP) (TYP)
2.50 SLOPE 9.653 ℄OF CW 2.50 SLOPE 9.653 ℄OF CW GIRDER GIRDER
4. REFER SEPARATE DRAWING FOR SUPER STRUCTURE.
FRL 2.50 SLOPE FRL 2.50 SLOPE
7.883 7.883
7.563
SOFFIT LVL. SOFFIT LVL. MATERIALS :
16 2 Pier Cap top
600
* BEARING HEIGHT * BEARING HEIGHT 5. REINFORCING STEEL SHALL BE HYSD (TMT) BARS FE-500D, CONFIRMING TO IS-1786
INCLUDED INCLUDED INCLUDING LATEST AMENDMENTS.
1500
6. GRADE OF CONCRETE SHALL BE AS FOLLOWS:
· CRASH BARRIER : M40
900
7.563 7.883 7.563 7.883 · PEDESTAL : M40
*508
*508
*446
*445
*383
*383
6.063
*321
*320
Pier Cap Top SOFFIT LVL. Pier Cap Top SOFFIT LVL. · PIER : M40
Pier Cap Bottom
· PIER CAP : M40
600
600
1000
756 2500 2500 2500 745 777 2504 SK 2504 SK 2504 SK 710 5.563 · PILE : M35
O.G.L. · PILE CAP : M40
2500 SQ 2500 SQ 2500 SQ
1500
1500
6 5.063 · PCC LEVELING COURSE : M15
Pile Cap Top 6
900
900
CONSTRUCTION
6.063 6.063
1500
Pier Cap Bottom Pier Cap Bottom
7. TEMPORARY STEEL CASING WITH NECESSARY GUIDE COLLAR MAY BE PROVIDED
1000
1000
5.563 5.563 DOWN TO 3.0M BELOW GROUND LEVEL AS PER THE SITE REQUIREMENT FOR
O.G.L. O.G.L.
3.563 CONSTRUCTION PURPOSE. STEEL LINER 6MM THK. MAY BE PROVIDED AS PER CLAUSE
5.063 5.063 Pile Cap Bottom 709.1.4 (A) IRC 78-2014.
Pile Cap Top Pile Cap Top
8. PILE SHALL BE INSTALLED USING BENTONITE SLURRY OF PROPER CONSISTENCY &
WITH THE SAME TYPE OF EQUIPMENT & CONSTRUCTION PROCEDURE THAT ARE
PROPOSED TO BE ADOPTED FOR THE WORKING PILES.
1500
1500
9. CONCRETING FOR PILE SHALL BE CARRIED OUT IN A SINGLE CONTINUOUS
Ø1000 Ø1000 OPERATION. NO CONSTRUCTION JOINTS SHALL BE PERMITTED IN A PILE. TREMIE
3.563 3.563 CONCRETING SHALL BE RESORTED TO THE TOTAL TIME OF TREMIE CONCRETING IS
Pile Cap Bottom Pile Cap Bottom 000.000
Pile Cap Bottom TO BE RESTRICTED WITHIN 4 HOURS FROM START TO APPROVAL FROM IC.
650 3000 650 10. THE PILE BORING, BORE STABILIZATION, CONCRETING ...ETC. SHALL BE CARRIED OUT
STRICTLY IN ACCORDANCE WITH CLAUSE 1107 OF THE MORT&H SPECIFICATION.
SECTION B-B 11. THE BOTTOM OF THE HOLE SHALL BE THOROUGHLY CLEANED BY EMPLOYING
5 SUITABLE MEANS AND LEVELS TAKEN. INCLUDING AT THE BOREHOLE BOTTOM TO
SCALE 1:50 5
Ø1000 Ø1000 Ø1000 Ø1000 CONFIRM CORRECTNESS OF THE SHAFT LENGTH.
12.THE PERMISSIBLE TOLERANCES IN PILE INSTALLATION SHALL CONFORM TO CLAUSE
000.000 000.000 1116 OF MORT&H SPECIFICATION AND CLAUSE 709 OF IRC:78-2014.
Pile Cap Bottom Pile Cap Bottom
650 3000 650 650 3000 650 13.THE TRIMMING OF PILE HEAD SHALL BE COMPLETED BETWEEN 4 TO 7 DAYS OF
CASTING SHALL BE DONE CAREFULLY & CAUTIOUSLY TO AVOID DAMAGE TO THE
SECTION A-A SECTION B-B REST OF THE PILE.
SCALE 1:50 SCALE 1:50 14.SLUMP FOR PILE CONCRETING SHALL BE 150MM TO 200MM AS PER MORTH & IRC
SPECIFICATION.
15.PILES SHALL BE VERTICAL, BORED CAST-IN-SITU.
16.THE TIP LEVEL OF PILE SHOWN IS AS PER GEOTECH REPORT. THE SOIL OBTAINED AT
THE TERMINATION DEPTH IS VISUALLY EXAMINED AND CROSS CHECKED AGAINST THE
SOIL PROFILE LOG BEFORE TERMINATING THE PILES.
17.THE SHAFT LOAD CAPACITY OF PILE :
VERTICAL CAPACITY = 630 TONNES
SEISMIC VERTICAL CAPACITY = 787 TONNES
HORIZONTAL CAPACITY = 34 TONNES
18.MINIMUM ANCHORAGE FOR PILE IN ROCK = 2D.
4
4
℄OF CW
℄OF EJ ℄OF BRNG ℄OF PIER & PIERCAP
FRL
9.653
℄OF BRNG 50 OF EJ C C
℄ OF FOOTING & PIER
4300
TO PANVEL 9000
150 650 1500 1500 650 150 777 2504 SK 2504 SK 2504 SK 710
TO CST TO PANVEL
2500 SQ 2500 SQ 2500 SQ
℄OF BRNG
765
JACK LOCATION
650
Ø1000
701
701
(TYP)
B B
RCC RCC
℄OF EJ
GIRDER GIRDER
549
549
BRNG
PIER
P13
℄OF 2500
2500
1500
559
568
599
630
661
670
B B A A
7.883 7.883 Ø2000
SOFFIT LVL. SOFFIT LVL.
4300
691
580
3 Bearing
3
Pedestal
A A
756 2500 2500 2500 745
1500
Ø1000 TO CHEMBUR,SION
C PLAN OF PIER CAP
1500
SCALE 1:50
150 650
900
C PCC
NOTES :-
TOTAL WIDTH OF BRIDGE 10050 TOTAL WIDTH OF BRIDGE 10085
502SK CLEAR CARRIAGEWAY 9043 SK 504SK 504SK CLEAR CARRIAGEWAY 9077 SK 504SK GENERAL :
500SQ 9000 SQ 500SQ 500SQ 9000 SQ 500SQ
8.853 ℄OF EJ 1. ALL DIMENSION ARE IN MILLIMETERS & LEVELS ARE IN METER UNLESS OTHERWISE
FRL ℄OF BRNG ℄OF BRNG SPECIFIED.
2. DIMENSIONS SHALL NOT BE SCALED, ONLY WRITTEN DIMENSIONS SHOULD BE
7
℄OF PIER ℄OF PIER FOLLOWED.
3. THIS DRAWING SHOULD BE IN CONJUNCTION WITH GENERAL ARRANGEMENT DRAWING
7
75MM WEARING COAT 75MM WEARING COAT
300mm SLAB (TYP) 300mm SLAB (TYP) AND OTHER RELATED DRAWING.
2.50 SLOPE 8.853 ℄OF CW 2.50 SLOPE
℄
8.853 OF CW
RCC
GIRDER
RCC
GIRDER
4. REFER SEPARATE DRAWING FOR SUPER STRUCTURE.
FRL 2.50 SLOPE FRL 2.50 SLOPE
600
INCLUDED INCLUDED INCLUDING LATEST AMENDMENTS.
6. GRADE OF CONCRETE SHALL BE AS FOLLOWS:
1500
· CRASH BARRIER : M40
900
7.083 7.082 · PEDESTAL : M40
6.763 6.763
*510
*508
*446
*445
*383
*383
· PIER : M40
*320
*319
Pier Cap Top SOFFIT LVL. Pier Cap Top SOFFIT LVL.
5.263
Pier Cap Bottom
· PIER CAP : M40
· PILE : M35
600
600
717 2504 SK 2504 SK 2504 SK 770 761 2542 SK 2544 SK 2542 SK 611
1000
4.763 · PILE CAP : M40
2500 SQ 2500 SQ 2500 SQ 2500 SQ 2501 SQ 2500 SQ O.G.L.
1500
1500
6
· PCC LEVELING COURSE : M15
4.263 6
900
900
Pile Cap Top
CONSTRUCTION
5.263 5.263
Pier Cap Bottom Pier Cap Bottom
1500
7. TEMPORARY STEEL CASING WITH NECESSARY GUIDE COLLAR MAY BE PROVIDED
1000
1000
4.763 4.763 DOWN TO 3.0M BELOW GROUND LEVEL AS PER THE SITE REQUIREMENT FOR
O.G.L. O.G.L.
CONSTRUCTION PURPOSE. STEEL LINER 6MM THK. MAY BE PROVIDED AS PER CLAUSE
4.263 4.263 2.763 709.1.4 (A) IRC 78-2014.
Pile Cap Top Pile Cap Top Pile Cap Bottom 8. PILE SHALL BE INSTALLED USING BENTONITE SLURRY OF PROPER CONSISTENCY &
WITH THE SAME TYPE OF EQUIPMENT & CONSTRUCTION PROCEDURE THAT ARE
PROPOSED TO BE ADOPTED FOR THE WORKING PILES.
1500
1500
9. CONCRETING FOR PILE SHALL BE CARRIED OUT IN A SINGLE CONTINUOUS
OPERATION. NO CONSTRUCTION JOINTS SHALL BE PERMITTED IN A PILE. TREMIE
2.763 2.763
3.563 Ø1000 Ø1000 CONCRETING SHALL BE RESORTED TO THE TOTAL TIME OF TREMIE CONCRETING IS
Pile Cap Bottom Pile Cap Bottom TO BE RESTRICTED WITHIN 4 HOURS FROM START TO APPROVAL FROM IC.
000.000
Pile Cap Bottom 10. THE PILE BORING, BORE STABILIZATION, CONCRETING ...ETC. SHALL BE CARRIED OUT
650 3000 650 STRICTLY IN ACCORDANCE WITH CLAUSE 1107 OF THE MORT&H SPECIFICATION.
11. THE BOTTOM OF THE HOLE SHALL BE THOROUGHLY CLEANED BY EMPLOYING
5 SECTION B-B SUITABLE MEANS AND LEVELS TAKEN. INCLUDING AT THE BOREHOLE BOTTOM TO 5
SCALE 1:50 CONFIRM CORRECTNESS OF THE SHAFT LENGTH.
Ø1000 Ø1000 Ø1000 Ø1000
12.THE PERMISSIBLE TOLERANCES IN PILE INSTALLATION SHALL CONFORM TO CLAUSE
000.000 000.000 1116 OF MORT&H SPECIFICATION AND CLAUSE 709 OF IRC:78-2014.
Pile Cap Bottom Pile Cap Bottom
650 3000 650 650 3000 650 13.THE TRIMMING OF PILE HEAD SHALL BE COMPLETED BETWEEN 4 TO 7 DAYS OF
CASTING SHALL BE DONE CAREFULLY & CAUTIOUSLY TO AVOID DAMAGE TO THE
REST OF THE PILE.
SECTION A-A SECTION B-B
SCALE 1:50 SCALE 1:50
14.SLUMP FOR PILE CONCRETING SHALL BE 150MM TO 200MM AS PER MORTH & IRC
SPECIFICATION.
15.PILES SHALL BE VERTICAL, BORED CAST-IN-SITU.
16.THE TIP LEVEL OF PILE SHOWN IS AS PER GEOTECH REPORT. THE SOIL OBTAINED AT
THE TERMINATION DEPTH IS VISUALLY EXAMINED AND CROSS CHECKED AGAINST THE
SOIL PROFILE LOG BEFORE TERMINATING THE PILES.
17.THE SHAFT LOAD CAPACITY OF PILE :
VERTICAL CAPACITY = 630 TONNES
SEISMIC VERTICAL CAPACITY = 787 TONNES
HORIZONTAL CAPACITY = 34 TONNES
18.MINIMUM ANCHORAGE FOR PILE IN ROCK = 2D.
4
4
℄OF BRNG
765
Ø1000 JACK LOCATION
650
(TYP)
657
657
RCC RCC B B
℄OF EJ
GIRDER GIRDER
593
593
BRNG
P13
℄OF 2500
2500
PIER
1500
450
446
445
453
457
456
B B A
Ø2000 A
7.083 7.082
4300
805
793
3 Bearing
Pedestal 3
A A
1500
C
150 650
900
C PCC
CLEAR CARRIAGEWAY
NOTES :-
10000
GENERAL :
1. ALL DIMENSION ARE IN MILLIMETERS & LEVELS ARE IN METER UNLESS OTHERWISE
SPECIFIED.
7 ℄ CARRIAGE WAY & PIER CAP ℄PIER & PIER CAP 2. DIMENSIONS SHALL NOT BE SCALED, ONLY WRITTEN DIMENSIONS SHOULD BE
7
FOLLOWED.
℄ PIER 75MM WEARING
℄BRG. ℄BRG. 3. THIS DRAWING SHOULD BE IN CONJUNCTION WITH GENERAL ARRANGEMENT DRAWING
FRL @ CENTER 1.25% SLOPE 500 500
850 COAT (TYP.) FRL @ CENTER AND OTHER RELATED DRAWING.
9.658 M
9.658 M 4. REFER SEPARATE DRAWING FOR SUPER STRUCTURE.
MATERIALS :
5. REINFORCING STEEL SHALL BE HYSD (TMT) BARS FE-500D, CONFIRMING TO IS-1786
2500 2500 2500 INCLUDING LATEST AMENDMENTS.
RCC RCC RCC
GIRDER
6. GRADE OF CONCRETE SHALL BE AS FOLLOWS:
GIRDER GIRDER
· CRASH BARRIER : M40
BEARING
· PEDESTAL : M40
RCC
PEDESTAL · PIER : M40
· PIER CAP : M40
404
341
373
PIER CAP TOP PIER CAP TOP
310
7.620 M 7.620 M · PILE : M35
6 BEARING · PILE CAP : M40 6
765 765 · PCC LEVELING COURSE : M15
900
900
TYP. TYP. RCC
PEDESTAL CONSTRUCTION
9000
7. TEMPORARY STEEL CASING WITH NECESSARY GUIDE COLLAR MAY BE PROVIDED
DOWN TO 3.0M BELOW GROUND LEVEL AS PER THE SITE REQUIREMENT FOR
1800
2500
PIERCAP
1800
CONSTRUCTION PURPOSE. STEEL LINER 6MM THK. MAY BE PROVIDED AS PER CLAUSE
900
900
PIER CAP
709.1.4 (A) IRC 78-2014.
PIER TOP PIER TOP
5.820 M 6.120 M
8. PILE SHALL BE INSTALLED USING BENTONITE SLURRY OF PROPER CONSISTENCY &
WITH THE SAME TYPE OF EQUIPMENT & CONSTRUCTION PROCEDURE THAT ARE
2000 250 2000 250 PROPOSED TO BE ADOPTED FOR THE WORKING PILES.
1000 150 G.L. PIER
700
PIER 9. CONCRETING FOR PILE SHALL BE CARRIED OUT IN A SINGLE CONTINUOUS
PILE CAP TOP PILE CAP TOP OPERATION. NO CONSTRUCTION JOINTS SHALL BE PERMITTED IN A PILE. TREMIE
5.120 M 5.120 M
CONCRETING SHALL BE RESORTED TO THE TOTAL TIME OF TREMIE CONCRETING IS
1150 2000 1150 TO BE RESTRICTED WITHIN 4 HOURS FROM START TO APPROVAL FROM IC.
4300 4300 10. THE PILE BORING, BORE STABILIZATION, CONCRETING ...ETC. SHALL BE CARRIED OUT
5 STRICTLY IN ACCORDANCE WITH CLAUSE 1107 OF THE MORT&H SPECIFICATION. 5
11. THE BOTTOM OF THE HOLE SHALL BE THOROUGHLY CLEANED BY EMPLOYING
1500
1500
150
CASTING SHALL BE DONE CAREFULLY & CAUTIOUSLY TO AVOID DAMAGE TO THE
3000 150 4300 150 REST OF THE PILE.
14.SLUMP FOR PILE CONCRETING SHALL BE 150MM TO 200MM AS PER MORTH & IRC
SPECIFICATION.
15.PILES SHALL BE VERTICAL, BORED CAST-IN-SITU.
16.THE TIP LEVEL OF PILE SHOWN IS AS PER GEOTECH REPORT. THE SOIL OBTAINED AT
THE TERMINATION DEPTH IS VISUALLY EXAMINED AND CROSS CHECKED AGAINST THE
SOIL PROFILE LOG BEFORE TERMINATING THE PILES.
PILE BOTTOM LVL. PILE BOTTOM LVL. 17.THE SHAFT LOAD CAPACITY OF PILE :
-13.811 M -13.811 M VERTICAL CAPACITY = 630 TONNES
4 SECTION B-B SEISMIC VERTICAL CAPACITY = 787 TONNES 4
SECTION A-A SCALE 1:50
HORIZONTAL CAPACITY = 34 TONNES
SCALE 1:50 18.MINIMUM ANCHORAGE FOR PILE IN ROCK = 2D.
19. CORE RECOVERY > 85%
20.ROCK QUALITY DESIGNATION > 65%
B
℄ CARRIAGE WAY & PIER CAP
℄ PIER
9000 PIER CAP
B 750 2500 2500 2500 750
4300
JACK POINT
150 650 1500 1500 650 150 PIER CAP
750
℄OF BRG.
150
A A
3 3
2500 PIER CAP
500
650
0
Ø100
TYP.
700
1. G.M.(W) BB/P-12486 : GENERAL ARRANGEMENT DRAWING OF ROB.
2. DRG. NO.TP/DC-BR/HL-PC/2018-49-1/3 : FOR RCC GIRDER OF 20M
1500
750
B
THIS DRAWING IS APPLICABLE FOR PWD PIER 6
PLAN OF PIER CAP
DRG.NO. MRIDC/CR/ROB/ MANKHURD /GA SHEET 0 OF 00
1500
2 SCALE 1:50 2
MRIDC
DY. CE/BR.D
650
AXEN / ROB
= JACK LOCATION (ELEVATION) F.R.L. = FINISH ROAD LEVEL
B PCC CHECKED BY
℄ = CENTER LINE F.C.T = FOUNDATION CAP TOP TITLE :
SK SSE / ROB / DES
TYP = TYPICAL F.C.B = FOUNDATION CAP BOTTOM JOINT GENERAL MANAGER
DIMENSIONS DETAIL OF PILE CAP PCC = PLAIN CEMENT CONCRETE F.B. = FOUNDATION BOTTOM
SCALE 1:50
DESIGNED BY SSE / ROB WIDENING OF EXISTING ROAD OVER
BRG = BEARING RQD = ROCK QUALITY DESIGANTION
SDP BRIDGES AT MANKHURD ON SION - PANVEL
G.L. = GROUND LEVEL
1 ASST. MANGER (DESIGN) SPECIAL STATE HIGHWAY IN MUMBAI. 1
JE / ROB / DES
CHECKED BY
NVP
MAHARASHTRA RAIL INFRASTRUCTURE DEVELOPMENT CORPORATION LTD. MANGER (DESIGN) SCALE :- AS SHOWN
DIMENSIONAL DETAILS PILE, PILECAP,
R0 FOR APPROVAL A Joint Venture of Govt. of Maharashtra and Ministry of Railway DRAWN BY
DATE : 05 / 02 / 2020 PIER & PIER CAP FOR P6
2nd Floor, Hoechst House, Nariman Point, Mumbai - 400 021 MVG
REV. DATE DESCRIPTION OF REVISIONS SR.EXECUTIVE (DRAWING)
A2 A B C D E F G H J
A B C D E F G H J
GENERAL :
1. ALL DIMENSION ARE IN MILLIMETERS & LEVELS ARE IN METER UNLESS OTHERWISE
SPECIFIED.
2. DIMENSIONS SHALL NOT BE SCALED, ONLY WRITTEN DIMENSIONS SHOULD BE
7 7
℄PIER & PIER CAP FOLLOWED.
75MM WEARING ℄ CARRIAGE WAY,PIER CAP & PIER ℄BRG. ℄BRG. 3. THIS DRAWING SHOULD BE IN CONJUNCTION WITH GENERAL ARRANGEMENT DRAWING
PIER CAP TOP COAT (TYP.) 500 500
PIER CAP TOP AND OTHER RELATED DRAWING.
8.848 M 0.00% SLOPE 8.848 M 4. REFER SEPARATE DRAWING FOR SUPER STRUCTURE.
MATERIALS :
5. REINFORCING STEEL SHALL BE HYSD (TMT) BARS FE-500D, CONFIRMING TO IS-1786
2500 2500 2500 RCC INCLUDING LATEST AMENDMENTS.
RCC
GIRDER
RCC GIRDER 6. GRADE OF CONCRETE SHALL BE AS FOLLOWS:
GIRDER · CRASH BARRIER : M40
BEARING
· PEDESTAL : M40
RCC
PEDESTAL · PIER : M40
· PIER CAP : M40
310
310
310
PIER CAP TOP PIER CAP TOP
310
6.863 M 6.863 M · PILE : M35
6 BEARING · PILE CAP : M40 6
· PCC LEVELING COURSE : M15
600
600
765 765
TYP. TYP. RCC
PEDESTAL
1500
9000 CONSTRUCTION
1500
2500
PIERCAP 7. TEMPORARY STEEL CASING WITH NECESSARY GUIDE COLLAR MAY BE PROVIDED
900
900
PIER CAP
DOWN TO 3.0M BELOW GROUND LEVEL AS PER THE SITE REQUIREMENT FOR
PIER TOP PIER TOP CONSTRUCTION PURPOSE. STEEL LINER 6MM THK. MAY BE PROVIDED AS PER CLAUSE
5.363 M 5.363 M
709.1.4 (A) IRC 78-2014.
2000 8. PILE SHALL BE INSTALLED USING BENTONITE SLURRY OF PROPER CONSISTENCY &
150 150
PIER G.L. 250 2000 250 WITH THE SAME TYPE OF EQUIPMENT & CONSTRUCTION PROCEDURE THAT ARE
1000
PIER PROPOSED TO BE ADOPTED FOR THE WORKING PILES.
9. CONCRETING FOR PILE SHALL BE CARRIED OUT IN A SINGLE CONTINUOUS
PILE CAP TOP PILE CAP TOP OPERATION. NO CONSTRUCTION JOINTS SHALL BE PERMITTED IN A PILE. TREMIE
4.363 M 4.363 M
CONCRETING SHALL BE RESORTED TO THE TOTAL TIME OF TREMIE CONCRETING IS
TO BE RESTRICTED WITHIN 4 HOURS FROM START TO APPROVAL FROM IC.
1150 2000 1150
4300 10. THE PILE BORING, BORE STABILIZATION, CONCRETING ...ETC. SHALL BE CARRIED OUT
5 4300
STRICTLY IN ACCORDANCE WITH CLAUSE 1107 OF THE MORT&H SPECIFICATION. 5
11. THE BOTTOM OF THE HOLE SHALL BE THOROUGHLY CLEANED BY EMPLOYING
1500
SUITABLE MEANS AND LEVELS TAKEN. INCLUDING AT THE BOREHOLE BOTTOM TO
CONFIRM CORRECTNESS OF THE SHAFT LENGTH.
12.THE PERMISSIBLE TOLERANCES IN PILE INSTALLATION SHALL CONFORM TO CLAUSE
PILE CAP BOTTOM PILE CAP BOTTOM 1116 OF MORT&H SPECIFICATION AND CLAUSE 709 OF IRC:78-2014.
2.863 M 2.863 M
13.THE TRIMMING OF PILE HEAD SHALL BE COMPLETED BETWEEN 4 TO 7 DAYS OF
150
CASTING SHALL BE DONE CAREFULLY & CAUTIOUSLY TO AVOID DAMAGE TO THE
3000 150 4300 150 REST OF THE PILE.
14.SLUMP FOR PILE CONCRETING SHALL BE 150MM TO 200MM AS PER MORTH & IRC
SPECIFICATION.
15.PILES SHALL BE VERTICAL, BORED CAST-IN-SITU.
16.THE TIP LEVEL OF PILE SHOWN IS AS PER GEOTECH REPORT. THE SOIL OBTAINED AT
THE TERMINATION DEPTH IS VISUALLY EXAMINED AND CROSS CHECKED AGAINST THE
SOIL PROFILE LOG BEFORE TERMINATING THE PILES.
PILE BOTTOM LVL. PILE BOTTOM LVL. 17.THE SHAFT LOAD CAPACITY OF PILE :
-13.145 M -13.145 M VERTICAL CAPACITY = 368 TONNES
4 SEISMIC VERTICAL CAPACITY = 456 TONNES 4
SECTION A-A SECTION B-B HORIZONTAL CAPACITY = 34 TONNES
SCALE 1:50 18.MINIMUM ANCHORAGE FOR PILE IN ROCK = 2D.
SCALE 1:50 19. CORE RECOVERY > 80%
20.ROCK QUALITY DESIGNATION > 30%
4300
750 2500 2500 2500 750
150 650 1500 1500 650 150 ℄OF BRG. ℄OF BRG.
150
PIER CAP
750
3 3
JACK POINT
650
0
A A
Ø100
2500 PIER CAP
500
TYP.
700
SPAN IN APPROACH PORTION
3. MRIDC/NGP/ROB/LC-MANKHURD /RCC SHEET : REINFORCEMENT
750
765 765
TYP TYP
1250 THIS DRAWING IS APPLICABLE FOR PWD PIER 7
B
1500
MRIDC
650
DY. CE/BR.D
LEGEND:- LEGEND:- SECTION :
DIVISION : MUMBAI
DESIGNATION SIGN.
150