Ethiopian Roads Authority Routine Road Maintenance Bill of Quantity
Ethiopian Roads Authority Routine Road Maintenance Bill of Quantity
1 BILL OF QUANTITIES
Ethiopian Roads Authority
Routine Road Maintenance Bill of Quantity
RNMD: Gondar Road Network & Safety Management Branch Directorate
Maintenance Type: Routine Maintenance
Project Name: Debre Tabor section
Intervention Area: Area 1
Act No Activity Name Unit Quantity Unit price Amount
(ETB)
110 Spot Repair Gravel Road (Nat. ) m3 118.00 173.74 20,501.32
111 Spot Repair Gravel Road (C.A ) m3 - 938.92 -
121 Culvert cleaning m3 382.59 193.20 73,915.62
122 Ditch cleaning (Manual) m 4,107.37 15.91 65,348.19
123 Repair erosion damage (Selected fill) m3 56.65 224.84 12,736.96
124 Repair erosion damage (Rock fill) m3 - 306.60 -
125 Mortared Masonry Repair m3 519.69 1,226.40 637,351.50
3
126 Dry Masonry Repair m - 678.62 -
3
127 Gabion structure m 149.42 1,214.97 181,543.25
131 Brush Clearing m2 - 1.13 -
2
210 Asphalt Patching (Seal coat) m - 83.46 -
2
211 Asphalt Patching (SST) m - 91.34 -
212 Asphalt Patching (DST) m2 2,873.50 176.91 508,350.89
3
213 Asphalt Patching (Cold - Mix) m - 6,234.20 -
3
214 Asphalt Patching (Hot Mini - Mix) m - 6,887.34 -
215 Asphalt Patching (Individual cracks) ml - 51.50 -
216 Pothole Reinstatement (D S T) m2 - 165.78 -
217 Pothole Reinstatement (Cold Mix) m3 - 6,726.07 -
218 Pothole Reinstatement (Hot Mini - m3 - 6,954.91 -
Mix)
219 Pothole Reinstatement (Base failure) m3 - 793.34 -
220 Blading gravel road (light) km - 3,200.80 -
221 Blading gravel road (Heavy) km 41.05 12,496.11 512,965.32
222 Gravel Provision-Selected Material m3 15,114.50 141.23 2,134,620.84
223 Gravel Provision-Crushed Agg. m3 - 883.82 -
230 Ditch cleaning (Machine) km 28.74 7,899.04 226,978.91
240 Shoulder Blading km - 1,624.62 -
241 Shoulder rehabilitation m3 - 224.84 -
251 Concrete Construction (Class1) m3 - 5,110.00 -
252 Concrete Construction (Class2) m3 - 3,427.87 -
253 Steel reinforcement Kg - 51.11 -
15.01(a) Detour Construction (not including Km - 431,583.2 -
Culvert) 5
15.01(b) Detour Maintenance (not including Km - 114,000.0 -
Culvert) 0
BRIDGE REPAIR - -
2
1-CWL-1 Water linkage on Deck slab m - 1,035.66 -
10-FSCO-3 Abutment and Wingwall scour m2 49.26 2,067.00 101,820.42
2
1-CHE-2 Honeycomb on deck slab m - 1,476.75 -
10-MHR-1 missing of curb and railing ea - 9,839.31 -
1-CPO-1 Abutment and Wingwall peel off m2 - 1,841.10 -
1-CRE-2 Rebar exposed on Pier and foundation m2 - 1,990.58 -
2
10-FSCO-3 River bed scour m - 2,246.59 -
2
5-RER-1 Riprap erosion m - 615.79 -
10-FSCO-3 Crack (deck slab) ml - 1,169.64 -
DAYWORKS 1,229,751.55
Sub Total 5,705,884.7
contingency (10%) 570,588.5
15% VAT 941,470.98
Total 7,217,944.20