0% found this document useful (0 votes)
130 views2 pages

Dryice Inc. Facilities Planning: 400K East South Midwest West

This document contains a cost analysis for DryIce Inc.'s facility planning across multiple locations. It compares the fixed and variable costs of shipping dry ice from facilities in New York, Atlanta, Chicago, and San Diego to meet requirements in the East, South, Midwest, and West. The total system cost of shipping from all locations to meet all requirements is $265,740,000.

Uploaded by

Gokul Das
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
130 views2 pages

Dryice Inc. Facilities Planning: 400K East South Midwest West

This document contains a cost analysis for DryIce Inc.'s facility planning across multiple locations. It compares the fixed and variable costs of shipping dry ice from facilities in New York, Atlanta, Chicago, and San Diego to meet requirements in the East, South, Midwest, and West. The total system cost of shipping from all locations to meet all requirements is $265,740,000.

Uploaded by

Gokul Das
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

DryIce Inc.

Facilities Planning

Shipped
Shipped Shipped from
New York from NY Atlanta from Atlanta Chicago Chicago San Diego
Fixed Costs
200k 6,000,000 5,500,000 5,600,000 6,100,000
400k 10,000,000 9,200,000 9,300,000 10,200,000
Variable Costs
East 211 110,000 232 - 238 - 299
South 232 - 212 180,000 230 - 280
Midwest 240 - 230 - 215 120,000 270
West 300 - 280 - 270 - 225

23,210,000 110,000 38,160,000 180,000 25,800,000 120,000 22,500,000


6,000,000 5,500,000 5,600,000 6,100,000

29,210,000 43,660,000 31,400,000 28,600,000

Cells that are changed


All non negative integers
Shipped
from San
Diego Requirements Supply

- 110,000 110,000
- 180,000 180,000
- 120,000 120,000
100,000 100,000 100,000

100,000

132,870,000

TOTAL SYSTEM COST


265,740,000

You might also like