Bstab 5 & 6 Improvement Project MLNG Tiga

This document summarizes the design check calculations for the outrigger pressures of a 500-ton crane to be used on the BSTAB 5/6 Improvement Project. It calculates the total load on the crane, load distribution to each outrigger, and pressure on the ground. It then verifies that the pressure does not exceed the soil's bearing capacity. Finally, it calculates the pressure on a pipe located below the outrigger using Boussinesq's equation. The pressure is determined to be 50.91 kPa, meeting design requirements.

Uploaded by

anon_714194540
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
101 views5 pages

Bstab 5 & 6 Improvement Project MLNG Tiga

This document summarizes the design check calculations for the outrigger pressures of a 500-ton crane to be used on the BSTAB 5/6 Improvement Project. It calculates the total load on the crane, load distribution to each outrigger, and pressure on the ground. It then verifies that the pressure does not exceed the soil's bearing capacity. Finally, it calculates the pressure on a pipe located below the outrigger using Boussinesq's equation. The pressure is determined to be 50.91 kPa, meeting design requirements.

Uploaded by

anon_714194540
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

Project Title BSTAB 5/6 PROJECT Calc No.

HSP/CV/2020/0802
Document Title DESIGN CHECK FOR CRANE OUTRIGGER Rev. A3
Client SERBA DINAMIK Page 1 of 5

PROJECT TITLE:

BSTAB 5 & 6 IMPROVEMENT PROJECT MLNG


TIGA

Document Title:

DESIGN CHECK FOR 500TONS CRANE (DEMAG


AC 1600) OUTRIGGER PRESSURE

Prepared By IR. HAW SENG POH Signature Date 19/9/2020

Endorsed By IR. HAW SENG POH Signature Date 19/9/2020

Approved By Signature Date


Calc
Project Title BSTAB 5/6 PROJECT HSP/CV/2020/0802
No.
Calculation
DESIGN CHECK FOR CRANE OUTRIGGER Rev. A3
Title
Client SERBA DINAMIK Page 2 of 5

DESIGN LOAD
1. Cargo weight = 82Tons
2. Crane total weight = 108Tons
3. Hook Block weight = 2.6Tons
4. Lifting Gear weight = 1Tons
5. Counterweight = 140Tons
6. Outrigger weight = 3 Tons
7. Total weight = 336.6Tons

OUTRIGGER STEEL MAT DETAILS


1. Thickness = 200mm
2. Dimension = 2.7m x 3m = 8.1m2
3. Number of outrigger = 4 legged

LOAD CALCULATION
Load distibution at each ourrigger = 333.6Tons/4legs = 83.4Tons

PRESSURE FROM STEEL MAT TO THE GROUND/FLOOR


= 83.4Tons / 8.1m2
= 10.3Tons/m2
= 103kPa
Calc
Project Title BSTAB 5/6 PROJECT HSP/CV/2020/0802
No.
Calculation
DESIGN CHECK FOR CRANE OUTRIGGER Rev. A3
Title
Client SERBA DINAMIK Page 3 of 5

SOIL BEARING CAPACITY AT PROPOSED SITE


Referring to document T-11-501-000, page 3, clause 2.0, Table1 and also the attachment 1,
the soil bearing capacity at Area A is range from 110kPa to 200kPa, which is bigger than our
calculated bearing pressure of 103kPa.
Calc
Project Title BSTAB 5/6 PROJECT HSP/CV/2020/0802
No.
Calculation
DESIGN CHECK FOR CRANE OUTRIGGER Rev. A3
Title
Client SERBA DINAMIK Page 4 of 5

CALCULATION OF PRESSURE AT THE PIPE SURFACE


BOUSSINESQ’s EQUATION PRESSURE EQUATION

P 2.7m

3m

Q
2 1.2m

1
Q’

0.6
0.6

Q = P/BL
Q = 83.4Tons / 8.1m2
Q = 103kPa

Q’ = Pressure applied to the pipe surface from the outrigger load


Q’ = 83.4/ (3+1.2)(2.7+1.2)
Q’ = 83.4/(4.2)(3.9)
Q’ = 83.4/(16.38)
Q’ = 5.091tons/m2
Q’ = 50.91kN/m2
Q’ = 50.91kPa

Note: Estimated the pipe is located 1.2m depth from the surface. If the depth is different,
another calculation need to perform to reconfirm the pressure applied to the pipe
surface.
Calc
Project Title BSTAB 5/6 PROJECT HSP/CV/2020/0802
No.
Calculation
DESIGN CHECK FOR CRANE OUTRIGGER Rev. A3
Title
Client SERBA DINAMIK Page 5 of 5

APPENDIX A
LIFTING DRAWINGS FROM HARBOUR