Ground Floor Plan: A B C D F E
Ground Floor Plan: A B C D F E
1 2 3 4
TOP OF RIDGE
21.20
2.00
LANDING LANDING
W
8 1 8
W
7 9 1 9 7 TOP OF ROOF BEAM
6 10 10 6
3.90
5 11 11 5
STAGE
5.00
4 12 12 4
3 13 13 3
2 14 14 2
1 15 1.50 10.81 1.50 15 1
2 UP UP
3.00
HALLWAY HALLWAY
1.40
1.40
3
2ND FLOOR LEVEL
TOILET
2.50
4
2.22 1.50 0.88
TOP OF LANDING
3.00
3.78 4.60 4.60 4.60 3.70
0.50
SCALE 1:10
A-1 NATURAL GROUND
21.20
8 8
7 9 9 7
2.00
6 10 10 6
3.90
W
5 11 2 11 5
4 12 12 4
3 13 13 3 TOP OF ROOF BEAM
2 14 14 2
5.00
1 15 15 1
2 DOWN DOWN
7.80
3.00
MULTI PURPOSE ROOM
TERRACE TERRACE
1.40
3 W
2
2ND FLOOR LEVEL
2.50
TOP OF LANDING
3.00
4
W W W
2 2 2
FINISH FLOOR LN.
0.50
NATURAL GROUND
PREPARED BY: PROJECT TITILE : TWO STOREY EVACUATION CENTER APPROVED BY : SHEET CONTENT : SHEET NO. :
MUNICIPALITY OF ORAS,
A PROPOSED GROUND FLOOR PLAN
ARTEMIO M. MAISO OFFICE OF THE ENIGINEERING
EVACUATION CENTER VIVIANE P. ALVAREZ 2ND FLOOR PLAN
A-1
MUNICIPAL ENGINEER MUNICIPAL MAYOR RIGHT SIDE ELEATION
PROVINCE OF EASTERN SAMAR LEFT SIDE ELEVATION