Foundation Plan: A B C D F E

The document provides schedules and dimensions for beams, columns, and footings used in construction. It lists Beam RB with dimensions of 250mm by 300mm and reinforcement of 5-16mm and 2-16mm rebar. Column C1 is scheduled at 250mm by 250mm with 6-16mm main bars and lateral ties spaced at 100mm and 200mm. Footing F1 has dimensions of 1000mm by 1000mm and reinforcement of 8-16mm bars along the A and B sides, with an excavation depth of 1000mm.

Uploaded by

chris
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
118 views1 page

Foundation Plan: A B C D F E

The document provides schedules and dimensions for beams, columns, and footings used in construction. It lists Beam RB with dimensions of 250mm by 300mm and reinforcement of 5-16mm and 2-16mm rebar. Column C1 is scheduled at 250mm by 250mm with 6-16mm main bars and lateral ties spaced at 100mm and 200mm. Footing F1 has dimensions of 1000mm by 1000mm and reinforcement of 8-16mm bars along the A and B sides, with an excavation depth of 1000mm.

Uploaded by

chris
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SCHEDULE OF BEAMS

DIMENSIONS
A B C D E F MARK
B (mm) T (mm) SUPPORTS L/R
TOP BOTTOM
MIDSPAN
TOP BOTTOM
RB 250 300 5-16MM 2-16MM 2-16MM 5-16MM 1 @ 50MM, 7 @ 100MM, 7@ 150MM, REST @ 200MM O.C.

SCHEDULE OF COLUMNS
DIMENSION(mm) LATERAL TIES/HOOPS
MARK MAIN BARS REMARKS
B T
C1 250 250 6-16MM 5@ 100 REST 200 M.O.C FOOTING TO ROOF BEAM
FOOTING TO ROOF BEAM
1
SCHEDULE OF FOOTINGS
DIMENSION (mm) REINFORCEMENT BARS DEPTH OF
MARK THICKNESS mm
A B ALONG 'A' ALONG 'B' EXCAVATION 'D'
F1 1000 1000 300 8-16MM 8-16MM 1000

STAGE

100mm THK SLAB


2 SPACED @ 500mm
UP

OC. BW.

3 MARK COLUMN SECTION TIES

0.25
BACK BACK
STAGE STAGE TIES
SPACED @

0.25
4 C1
2-0.05m.,
2-0.10m.,
AND REST
@ 0.15m.
ON CENTER

1 FOUNDATION PLAN
SCALE 1:10
S-1

LEFT RIGHT
MIDSPAN
SUPPORT SUPPORT
0.40 L/4 L/3 B
0.15

>300

T
>150 L/8
CROSS SECTION
2-0.05m. , 2-0.10m., AND SPAN, L
THE REST @ 0.15m. O. C.
LONGITUDINAL SECTION
PLAN
NAT. GRADE LINE

5 TYPICAL BEAM DETAILS


SCALE 1:30
S-1
1.00
0.25
0.70min.
VARIES

L/4
0.60
VARIES

He
0.15

Hr

THICKNESS
>300

BEAM
0.25

0.40
0.80

VERTICAL BARS
SPACED AT 15CM BOTHWAYS SECTION
0.30m

L/8
GRAVEL BED SPACED @ 15CM
COMPACTED EVENLY BOTHWAYS 4 WALL FOOTING DETAILS
SCALE 1:30
S-1
1.00
Hr

He
>150

6 TYPICAL COLUMN BEAM DETAILS


3 COLUMN FOOTING DETAILS S-1 SCALE 1:30
Hr
He

SCALE 1:30
S-1
7 HOOKS AND BEND DETAILS
SCALE 1:30
S-1

PREPARED BY: PROJECT TITILE : TWO STOREY EVACUATION CENTER APPROVED BY : SHEET CONTENT : SHEET NO. :
MUNICIPALITY OF ORAS,
A PROPOSED FOUNDATION PLAN
ARTEMIO M. MAISO OFFICE OF THE ENIGINEERING
EVACUATION CENTER VIVIANE P. ALVAREZ COLUMN FOOTING DETAILS
S-1
MUNICIPAL ENGINEER MUNICIPAL MAYOR WALL FOOTING DETAILS
PROVINCE OF EASTERN SAMAR TYPICAL BEAM DETAILS
TYPICAL COLUMN BEAM DETAILS
ADDRESS: ORAS , EASTERN SAMAR LOCATION : ADDRESS: ORAS , EASTERN SAMAR HOOKS AND BEND DETAILS