Primary Clarifier Estimate (AutoRecovered)

This document provides an estimate for a primary clarifier including quantities and costs for various construction elements. It includes estimates for earthwork excavation, plain cement concrete, reinforced cement concrete, and shuttering. The total estimated quantities are 957.7342 cubic meters of earthwork excavation, 121.8808 cubic meters of plain cement concrete, 558.5802 cubic meters of reinforced cement concrete. It also provides areas for shuttering of various elements of the clarifier.

Uploaded by

epe civil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
394 views3 pages

Primary Clarifier Estimate (AutoRecovered)

This document provides an estimate for a primary clarifier including quantities and costs for various construction elements. It includes estimates for earthwork excavation, plain cement concrete, reinforced cement concrete, and shuttering. The total estimated quantities are 957.7342 cubic meters of earthwork excavation, 121.8808 cubic meters of plain cement concrete, 558.5802 cubic meters of reinforced cement concrete. It also provides areas for shuttering of various elements of the clarifier.

Uploaded by

epe civil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 3

ESTIMATE FOR PRIMARY CLARIFIER

Sl.
Description No. L B D Qty. Remarks Rate per Amount
No.
1 Earthwork Excavation

a Main Wall Footing 1 p/4x38.25)^2 2.2 2526.709 cum 34+2*0.3+2*0.725+2*0.1+2*1


NGL -3.8-1.5-0.1
1 p/4x30.35)^2 2.2 -1590.78 cum 34-2*0.725-2*0.1-2*1

b Central Feed Well Footing 1 p/4x4.95)^2 1.05 20.19619 cum 2.75+0.1+0.1+1+1=4.95


1.05=3.4-0.35-1.6-0.3-0.1

c Sludge Collection Pit portion at centre 1 p/4x(6.4)^2 0.05 1.60768 cum 1.2+0.25+0.25+1+1+0.35+0.35+1+1
3.8-3.4-0.35
Total Earthwork excavation on clayey soil considering 3.8m as NGL 957.7342 cum

2 Plain cement concrete 1:4:8 (One cement,


four sand and eight HBG metal) using 40 mm
size hard broken stone for jelly for foundation
etc. complete complying with standard
specifications.

a Main Wall Footing 1 p/4x36.25)^2 0.1 103.1539 cum 34+2*0.3+2*0.725+2*0.1

1 p/4x32.35)^2 0.1 -82.152 cum 34-2*0.725-2*0.1

b Central Feed Well Footing 1 p/4x2.95)^2 0.1 0.683146 cum 2.95=2.75+0.1+0.1

C Grade Slab at 5.85m Lvl., 1 p/4x34)^2 0.1 90.746 cum


1 p/4x4.4)^2 0.1 -1.51976 cum 4.4=(1.2+0.25+0.25+1+1+0.35+0.35)

Grade Slab Central Collection Pit at 5.85m Lvl., 1 p/4x4.4)^2 0.1 1.51976 cum 4.4=1.2+0.25+0.25+1+1+0.35+0.35
1 p/4x1.9)^2 0.1 -0.28339 cum 1.9=1.2+0.35+0.35

Grade Slab Central Collection Pit at 5.85m Lvl., 1 0.7044845 13.816 9.733158 cum 4.4=1.2+0.25+0.25+1+1+0.35+0.35
(Triangular Portion)

Total Plain cement concrete Confirming 1:4:8 ratio 121.8808 cum


Sl.
Description No. L B D Qty. Remarks Rate per Amount
No.
3 Reinforced Cement Concrete confirming
M35 grade
a Main Wall Footing 1 p/4x36.05)^2 0.3 306.0564 cum 36.05

1 p/4x32.55)^2 0.3 -249.513 cum 32.55

b Central Feed Well Footing 1 p/4x2.75)^2 0.3 1.780969 cum 2.75=2.75

C Grade Slab at 5.85m Lvl., 1 p/4x34)^2 0.2 181.492 cum


1 p/4x4.4)^2 0.2 -3.03952 cum 4.4=(1.2+0.25+0.25+1+1+0.35+0.35)

Grade Slab Central Collection Pit at 5.85m Lvl., 1 p/4x4.4)^2 0.35 5.31916 cum 4.4=1.2+0.25+0.25+1+1+0.35+0.35
1 p/4x1.9)^2 0.35 -0.99185 cum 1.9=1.2+0.35+0.35

Grade Slab Central Collection Pit at 5.85m Lvl., 1 p/4x4.4)^2 1.07 16.26143 cum 4.4=1.2+0.25+0.25+1+1+0.35+0.35
1 p/4x3.7)^2 1.07 -3.03222 cum 3.7=1.2+0.25+0.25+1+1

d Wall (9.85 to 1.80) 1 p/4x34.6)^2 8.05 7565.153 cum


1 p/4x34)^2 8.05 -7305.05 cum
Deduction 1000mm inlet Pipe 1 p/4x1.2)^2 0.3 -0.33912 cum

e Launder Wall 1 p/4x32.5)^2 0.9 746.2406 cum 32.5=34-0.75-0.75


p/4x32.1)^2 0.9 -727.985 cum 32.1=34-0.75-0.75-0.2-0.2

f Launder Base Slab 1 p/4x34)^2 0.2 181.492 cum 34


p/4x32.5)^2 0.2 -165.831 cum 32.5=34-0.75-0.75

g Central Feed Well (3.48-1.60) 1 p/4x1.90)^2 1.88 5.327638 cum 1.9=1.2+0.35+0.35


p/4x1.20)^2 1.88 -2.12515 cum 1.2

h Central Feed Well (9.85-3.48) 1 p/4x1.70)^2 6.37 14.4513 cum 1.7=1.2+0.25+0.25


p/4x1.20)^2 6.37 -7.20065 cum 1.2

Deduction 1000mm inlet Pipe 1 p/4x1.2)^2 0.3 -0.33912 cum

Deduction 1000mm inlet Pipe 6 0.35 1.2 0.25 -0.2826 cum

i Equipment Slab 1 p/4x1.70)^2 0.325 0.737311 cum 1.7=1.2+0.25+0.25

Total Reinforced Cement Concrete confirming M35 grade 558.5802 cum


Sl.
Description No. L B D Qty. Remarks Rate per Amount
No.

4 Shuttering

a Main Wall Footing 1 2*3.14*x36.25/2 0.1 11.3825 Sqm 2*3.14*36.25/2

1 2*3.14x32.35/2 0.1 10.1579 Sqm 2*3.14*32.35/2

b Central Feed Well Footing 1 2*3.14*2.95 0.1 1.8526 Sqm 2.95=2.75+0.1+0.1

c Main Wall Footing 1 2*3.14*x36.25/2 0.3 34.1475 Sqm 2*3.14*36.25/2

1 2*3.14x32.35/2 0.3 30.4737 Sqm 2*3.14*32.35/2

d Central Feed Well Footing 1 2*3.14*2.95 0.3 5.5578 Sqm 2.95=2.75+0.1+0.1

e Wall (9.85 to 1.80) 1 2*3.14*x34.6/2 8.05 874.5842 Sqm


1 2*3.14*x34/2 8.05 859.418 Sqm
Deduction 1000mm inlet Pipe 1 p/4x1.2)^2 1 -1.1304 Sqm