Learn Insta Cost: A Software For Estimating Project Cost & Tender SOQ Instantly
Learn Insta Cost: A Software For Estimating Project Cost & Tender SOQ Instantly
By :
Y.A. Agboatwala &
Fatima.Y. Agboatwala
1802, Jamuna Amrut,
219, Patel Estate, S.V.Road,
Jogeshwari(W), Mumbai - 400102
Phone: 09820792254 , (022) 26783525
Url: www.supercivilcd.com,
www.agboatwala.com
Email : [email protected],
[email protected],
[email protected]
1
LEARN INSTA COST
IN 8 EASY STEPS
A Software for Estimating Project Cost Instantly
2
LEARN INSTA COST STEPS BY STEP
Please take Print Out of Every Step, including this page before commencing
Learn. Take a Yellow Marker Pen and Mark the Learning Process while
Proceeding further. This is Essential for Learning. A Working example is also
given on our web site. Down load the Working Example. Again Practice Software
using working example.
The software calculates the Project Cost instantly, by manipulating quantities of
building items of various standard modules. These modules are displayed under
Build Project option.
Insta Cost software is just a rational way of getting the Project Cost based on
item quantities rather then by Thumb Rule or Ball Park figures.
In order to get Instant Cost, a user has to just create a Project File, Add Modules
as required in the Project and Click the Summary option to get Cost and various
material Consumptions.
More the number of Modules selected, greater will be the cost accuracy of
project.
RC OFFICE BUILDING
PLATFORM IN STEEL
SINGLE STOREY SHED WITH RC COLUMNS BRICK WALLS AND TRUSSED ROOF
STORAGE SHED 7.0 M HIGH WITH RC COLUMNS & TRUSSED ROOF WITH
GANTRY
CONTROL ROOM
STEEL BUNKER
RC BUNKER
CEMENT SILO
CONVEYOR GANTRY
4
RC CULVERT AT ROAD CROSSING
PAVING
BRICK DRAIN
BITUMINOUS ROAD
SEPTIC TANK
SOAK PIT
INSPECTION CHAMBER
MANHOLE
MS LADDER
ROAD BERM
PLINTH PROTECTION
5
A User has to give the module parameters in specific unit.
Total Building built-up Area shall be in M2.
Tanks shall be in M3 Capacity.
Silos / Bunkers shall be in TONS of capacity.
Compound walls shall be in M.
Towers shall be in Numbers and so on ....
6
LEARN INSTA COST STEPS BY STEP
STEP NO. 1 : New Project (File) Creation
When Program starts, the above Menu Bar is displayed. Click the
" Create New Project Option ".
Go to " 000_Insta_Cost " folder & give a file name to your project. I have given " Example "
as the name of my new project file. Click the save button. Following project window will open.
7
Enter the values of relevant parameters. Note the separate exclusive parameters
for Multi-Storey building with Lift. The Lift, Seismic Design Impact and extra for Raft / Piles
costs will be added to basic Multi-Storey building cost.
All other costs will be added to overall basic project cost.
8
Enter the Rates of various building items. There are 58 nos. of items.
The " Prev ", " Next ", " Last ", " 1 st ", & " Go to Rec " Buttons are for displaying / Focusing
the cursor on Previous, Next, First or required Record Number respectively.
The " Print " Button is for printing of values from the Table, or to Create PDF File.
Use laser OR Inkjet Printer.
A free PDF Creator software is included in CD, Users may run this software to
install PDF creation facility.
Now click the " Read Me " button, following salient feature under this option will be displayed.
10
LEARN INSTA COST STEPS BY STEP
STEP NO. 2 :
EDIT PROJECT
The Edit Project Option is available to Edit the various Parameters of already created Project
File.
Now select " Example " File & Press Open Button.
11
LEARN INSTA COST STEPS BY STEP
STEP NO. 3 : BUILD PROJECT
Select the " Example " File, following window will appear.
12
Enter the Quantities of Various structures / Items of works included in your project. Wherever
the quantities are not present, program will assume absence of that Structure / Items of
works.
Remember to put the Correct quantity in Multi-storey building option, as you have indicated
during the Project Creation stage else error will be generated.
Refer Std. Module Details option before selecting and Entering Quantities of that Module.
User shall use maximum no. of Modules present in the given Project.
More the available Modules used, better will be the accuracy of estimate.
Quantities of Items calculated will depend upon the no. of modules selected.
14
LEARN INSTA COST STEPS BY STEP
STEP NO. 4 : ABSTRACT SHEET
Note Summary Option shall be used only after " Build Project " option.
15
Abstract Sheet displays Quantities, Rate and Cost of various building items. Total Basic Cost is
also displayed. The Items with 0.00 quantities reflect modules, not used while developing
project.
By clicking " QTY = 0 " button these items can be deleted.
Abstract Sheet reflects the summary of total Quantities of Std. Items Used in the Project.
The Quantities have been worked out from our Default Modules.
If a User wants to change the Rates of items he can use Edit Project Option.
Note that items having 0.00 amount do not have any quantities associated with them.
16
LEARN INSTA COST STEPS BY STEP
STEP NO. 5 : Edit Settings
Click the " Files " option in the MENU bar. The following window will open.
17
This is the most interesting feature of software.
When Cost of a Section is > Mentioned limit a Flag Like ### will be Displayed in its Report.
When Cost of a Section is < Mentioned limit a Flag Like $$$ will be Displayed in its Report.
When Cost of an Item is > Mentioned limit a Flag Like ### will be Displayed in its Report.
When Cost of an Item is < Mentioned limit a Flag Like $$$ will be Displayed in its Report.
Cost of Selected Sections are Increased by Mentioned limit & Total Costs
will be Displayed for All bidders.
Cost of Selected Sections are Decreased by Mentioned limit & Total Costs
will be Displayed for All bidders.
The accuracy of Standard Rate calculation is the Key to deciding above factors.
More accurate the Standard Rate, the Lesser shall be the Value of flags.
A Rate lower than say 25 % of Standard Rate will call for closer look at Bidders Rate.
Sometimes contractors quote a value less than the basic price of Materials by mistake
or ignorance. Such Rates shall be brought to the notice of Contractor, else contractor
may runaway leaving the work half done. There is nothing like free lunch.
A user may Use our SUPER RATE ANALYSIS software to identify such rates.
Sometimes smart contractors quote lesser rate for a particular item, assuming that
the quantities of such items will increase during construction and quote very high
rate for lesser quantity items. Hence Options for Selected Increase or Decrease
of Sectional Cost is given to identify such Bidders.
Read Me button will display salient feature of this option.
Summary Option displays the Selected Settings. Click Summary Option.
Following Graphics is displayed.
18
LEARN INSTA COST STEPS BY STEP
STEP NO. 6 : Bidder's Rating + Parameters
Click the " Files " option in the MENU bar. The following window will open.
Click Bidders Rating + Parameters Option. Select File Name (Example_1) and then Select
Bidder no. 1 : Build Tech.
Following Graphics is displayed.
19
Bidder's Parameter Ratings are basically subjective in nature. In order to reduce pure
subjectivity, we have added various other parameters to make it somewhat objective.
Total Rating Marks given to a shall not > 100.0.
A Healthy Financial Parameters reflect Financial Capability & Competence of its
Top Management.
Basic Labor & Material rates at site reflects Contractors understanding of Site Conditions. A
extremely high or Low rate may indicate that contractor has not visited the site & got
acquainted with its conditions. Basic Labor & Material Rates are also helpful in Rate Analysis &
in deciding Day Works (extra item) Rates.
Equipment Schedule, Supervisory & Labor Strength at site Reflects resourcefulness &
Commitment of contractor to Schedule as well as to QA / QC. The average labor strength at
site shall be collaborated with the Bar Chart of project produced by the Contractor.
Refer our QTY software.
Read Me button will display salient feature of this option.
20
LEARN INSTA COST STEPS BY STEP
STEP NO. 7 : Reports - Part 1
Click the " Reports " option in the MENU bar. The following window will open.
There are 8 Report options & all are having different flavor.
A user can print the Report directly or Copy the Text & Paste it to any Word Editor,
whenever the Button is displayed.
Click " Sectional + Total Standard Cost ".
Sectional Cost & Total Standard Tender Cost will be displayed after Example_1 File is Selected.
Following Report is a Part Display.
21
22
If a user clicks " Sectional + Total Cost : Bidder ", Individual Sectional & Total Cost of Selected
Bidder will be displayed. Basically this Option is for Bidder, to whom the Client has Exported
the Tender File for Adding Item Rates. Bidder can find out the Tender Cost after adding Rates
to all Items bearing quantities.
If a user clicks " Sectional + Total Cost : ALL " Option, Individual Sectional & Total Cost of All
Bidders along with Standard Costs will be displayed. Part Report is Displayed as under.
If a user clicks " Item Cost : ALL ", Option, Individual Item Cost of Selected Bidder along with
Standard Item Cost will be displayed.
If a user clicks " Item Cost > and < : Flag " Option, Individual Item Cost of Selected Bidder
along with Standard Item Costs will be displayed as per Flag Indicated in " Settings " Option.
Part Report is Displayed as under.
23
STEP NO. 7 IS OVER.
24
LEARN INSTA COST STEPS BY STEP
STEP NO. 8 : Reports - Part 2
Click the " Reports " option in the MENU bar. The following window will open.
There are 8 Report options & all are having different flavor.
A user can print the Report directly or Copy the Text & Paste it to any Word Editor,
whenever the Button is displayed.
Click " Sec. Cost : Sorting A/D Order + Flag ".
Standard Sectional & Total Cost along with all Bidder's Sectional & Total Cost will be Displayed
after Example_1 File is Selected. The Flag shown is as per Settings Option.
Click Column Headers to Sort Sectional Cost & Total Cost in Ascending or Descending Order.
Following Report is a Part Display.
25
If a user clicks " Increase / Decrease : Sec Cost " Option, Sectional & Total Cost of All Bidders
as well as Standard Costs will Increase or Decrease as indicated in settings.
Part Report is Displayed as under.
26
The Last Reporting Display is for " Rating + Parameter " Option.
Part Report is Displayed as under.
27
Click Utilities Option. Following Widow Opens up. This option is for Copying & Deleting of Bid
Analysis Files. Indicate Source & Destination File for Copying & Indicate only Source File for
Deleting all Bid Analysis Files. In Order to view properties of a File, Browse for the file name by clicking on
"Source" button. Click on "Get Properties of Source" button
28
OTHER SOFTWARES:
SUPER RATE ANALYSIS - Rate Analysis Of 1299 Nos. Of Civil Engineering Items
S S F - Analysis, Design, Estimation & Costing of Steel Buildings, revised as per IS 800 : 2007
ROAD ESTIMATE - Quantity Estimation & Cost, Project Control For Road
ELECTRIC COST - Costing, Project Control & MDS For Electrical Projects
HVAC COST - Costing, Project Control & Design For HVAC Engineers
BUILDERS BILL - A Database Management Software for Billing of Lump sum Contracts
RAFT FOUNDATION - Analysis, Design, Estimation, Costing & Drawing of RCC Raft Foundation
COMPOSITE - A Software for Analysis, Design, Costing & Drawing of Composite Floor Buildings
DESIGN & DRAWING CONTROL - A DBM Software for Control of Design & Drawing Manhours.
FLAT SLAB - A Software for Analysis, Design, Estimation, Costing & Drawings of Flat Slabs
FLAT RAFT - A Software for Analysis, Design, Estimation, Costing & Drawings of Rigid RCC Flat Rafts
OPTIMIZE_BAR - A Software for Optimization of Reinforcements from Existing Bar Bending Schedule
OPTIMIZE_STEEL - A Software for Optimization of Steel Sections from Existing Fabrication Drawing
AutoQty - A Software for Automatic Quantity & Cost Estimation from AutoCAD Drawings
29