Coefficient
Coefficient
Coefficient
Description unit bags Cum Cum Cum Nos Nos Cum Nos Nos
Concrete Works
Note:
if the Min Cement content specified by Client is more than the aboven then Clients norms shall be adopted
Sand Consumtion are inclusive of bulkage
For Prestressed Concrete works, the Mac cement Content is limited to 10.6Bags per cum
For bored Cast insitu pile concrete, the following shall be adopted
RCC M20 400 Kgs
RCC M25 445 Kgs
RCC M30 495 Kgs
RCC M35 545 Kgs
MASONRY WORKS
BW CM 1:3 - Table Moulded Bricks Cum 2.34 0.300 450
BW CM 1:4 - Table Moulded Bricks Cum 1.74 0.300 450
BW CM 1:5 - Table Moulded Bricks Cum 1.42 0.300 450
BW CM 1:6 - Table Moulded Bricks Cum 1.25 0.280 450
Half BW CM 1:3 - Table Moulded Bricks Sqm 0.27 0.035 52
Aggregates C. Blocks Boulder Bond StonSize Stone
Cement Sand 40mm 20mm Bricks Holl / Soli
Half BW CM 1:4
Description
- Table Moulded Bricks Sqm
unit bags
0.21 Cum
0.035 Cum Cum Nos 52 Nos Cum Nos Nos
200mm tk Block Masonry in CM 1:3 Sqm 0.25 0.030 12.5
200mm tk Block Masonry in CM 1:4 Sqm 0.20 0.030 12.5
200mm tk Block Masonry in CM 1:5 Sqm 0.15 0.030 12.5
150mm tk Block Masonry in CM 1:3 Sqm 0.20 0.022 12.5
150mm tk Block Masonry in CM 1:4 Sqm 0.14 0.022 12.5
150mm tk Block Masonry in CM 1:5 Sqm 0.12 0.022 12.5
100mm tk Block Masonry in CM 1:3 Sqm 0.13 0.015 12.5
100mm tk Block Masonry in CM 1:4 Sqm 0.10 0.015 12.5
RR Masonry in CM 1:6 Cum 1.65 0.350 1.3 9
SS Masonry in CM 1:6 Cum 1.50 0.320 15 90
SS Masonry in CM 1:5 Cum 1.98 0.350 15 90
PLASTERING WORKS
12mm tk CM 1:3 Sqm 0.15 0.015
12mm tk CM 1:4 Sqm 0.11 0.015
12mm tk CM 1:5 Sqm 0.09 0.015
12mm tk CM 1:6 Sqm 0.07 0.015
15mm tk CM 1:3 Sqm 0.18 0.018
15mm tk CM 1:4 Sqm 0.13 0.018
15mm tk CM 1:5 Sqm 0.11 0.018
15mm tk CM 1:6 Sqm 0.09 0.018
20mm tk CM 1:3 Sqm 0.23 0.03
20mm tk CM 1:4 Sqm 0.18 0.03
20mm tk CM 1:5 Sqm 0.14 0.03
20mm tk CM 1:6 Sqm 0.11 0.03
18mm tk in 2 coats (12mm tk in CM 1:5 Sqm 0.13 0.03
& 6mm tk in CM 1:6)
18mm tk in 2 coats (12mm tk in CM 1:5
& 6mm tk in CM 1:3) Sqm 0.18 0.03
6mm tk Ceiling Plastering in CM 1:3 Sqm 0.07 0.01
6mm tk Ceiling Plastering in CM 1:4 Sqm 0.05 0.01
Where Plaster is to be finished with a floating coat of neat cement, take 2.2kg per sqm extra cement
Consolidated Construction Consortium Ltd
Labor Productivity Standards
PAINTE PLUMB
DESCRIP UNIT UNSKILL_I MASON CARPENTER FITTER UNSKILL_II R HELPER ER
Excavation cum 0.763 0.000 0.000 0.000 0.000 0.000 0.000 0.000
###
Sand Filling cum 2.393 0.000 0.000 0.000 0.000 0.000 0.000 0.000
###
Pcc in Foundation cum 1.978 0.283 0.000 0.000 0.000 0.000 0.000 0.000
###
Footing cum 5.015 0.396 1.956 0.800 2.878 0.000 0.000 0.000
###
Columns in foundation cum 3.532 0.791 4.753 1.766 6.932 0.000 0.000 0.000
###
Brickwork in foundn cum 2.825 1.271 0.000 0.000 0.000 0.000 0.000 0.000
###
Plinth beam cum 4.344 0.300 0.399 0.200 0.607 0.000 0.000 0.000
###
Sand floor cum 0.083 0.000 0.000 0.000 0.000 0.000 0.000 0.000
###
Pcc in floor cum 1.607 0.109 0.000 0.000 0.000 0.000 0.000 0.000
###
Columns in GF cum 3.532 0.791 4.753 1.766 6.932 0.000 0.000 0.000
###
Slab in Ground Floor cum 2.165 0.110 0.985 0.066 0.763 0.000 0.000 0.000
###
Beam in Ground Floor cum 0.576 0.110 0.985 0.066 0.763 0.000 0.000 0.000
###
Brickwork in GF cum 2.825 1.271 0.000 0.000 0.000 0.000 0.000 0.000
###
Brickwork in GF sqm 0.198 0.089 0.000 0.000 0.000 0.000 0.000 0.000
###
Loft in GF sqm 0.103 0.026 0.017 0.017 0.035 ###
Columns in I Floor cum 4.061 0.795 4.768 1.766 1.766 0.000 0.000 0.000
###
Slab in First Floor cum 0.752 0.120 1.130 0.075 1.377 0.000 0.000 0.000
###
Beam in First Floor cum 0.752 0.120 1.130 0.075 1.377 0.000 0.000 0.000
###
BW 9" in First Floor cum 2.825 1.271 0.000 0.000 0.000 0.000 0.000 0.000
###
BW 4.5" in First Flr sqm 0.198 0.089 0.000 0.000 0.000 0.000 0.000 0.000
###
Loft in First Floor sqm 1.113 0.279 0.185 1.851 0.377 0.000 0.000 0.000
###
Columns in SF cum 4.556 0.791 4.768 1.914 7.310 0.000 0.000 0.000
###
Slab in SF cum 0.848 1.201 1.165 0.105 1.533 0.000 0.000 0.000
###
Beam in SF cum 0.872 1.201 1.165 0.105 1.533 0.000 0.000 0.000
###
BW 9" in SF cum 2.995 1.349 0.000 0.000 0.000 0.000 0.000 0.000
###
BW 4.5" in SF sqm 0.198 0.089 0.000 0.000 0.000 0.000 0.000 0.000
###
Loft in SF sqm 1.114 0.280 0.093 0.093 0.377 0.000 0.000 0.000
###
Column in TF cum 4.556 0.915 0.607 0.607 1.236 0.000 0.000 0.000
###
Slab in TF cum 0.872 1.201 1.165 0.105 1.709 0.000 0.000 0.000
###
Beam in TF cum 0.872 1.201 1.165 0.104 1.709 0.000 0.000 0.000
###
BW 9" in TF cum 3.002 1.377 0.000 0.000 0.000 0.000 0.000 0.000
###
BW 4.5" in TF sqm 0.198 0.089 0.000 0.000 0.000 0.000 0.000 0.000
###
Loft in TF sqm 1.114 2.799 0.093 0.093 0.377 0.000 0.000 0.000
###
Columns in HR cum 8.370 0.498 2.507 2.507 4.979 0.000 0.000 0.000
###
Slab in HR cum 8.310 2.507 2.507 1.243 5.615 0.000 0.000 0.000
###
BW in 9" in HR cum 5.156 2.190 0.000 0.000 0.000 0.000 0.000 0.000
###
Door Frames sqm 1.164 0.928 6.964 0.000 6.964 0.000 0.000 0.000
###
Ceiling plastering sqm 0.236 0.107 0.000 0.000 0.000 0.000 0.000 0.000
###
Internal Plastering sqm 0.187 0.081 0.000 0.000 0.000 0.000 0.000 0.000
###
Mosaic Flooring sqm 1.442 0.226 0.000 0.000 0.000 0.000 0.000 0.000
###
Mosaic Skirting rm 0.367 0.349 0.000 0.000 0.000 0.000 0.000 0.000
###
External Plastering sqm 0.157 0.070 0.000 0.000 0.000 0.000 0.000 0.000
###
Doors Making sqm 0.000 0.000 7.933 0.000 6.340 0.000 0.000 0.000
###
Doors/Window Fixing sqm 3.714 2.476 2.476 0.000 2.476 0.000 0.000 0.000
###
Windows sqm 0.000 0.000 7.933 0.000 6.340 0.000 0.000 0.000
###
Internal Painting sqm 0.000 0.000 0.000 0.000 0.000 0.016 0.070 0.000
###
Brick Parapet sqm 0.807 0.283 0.000 0.000 0.000 0.000 0.000 0.000
###
Kitchen Tables sqm 0.492 0.165 0.000 0.000 0.000 0.000 0.000 0.000
###
Kitchen Tiling sqm 0.538 0.323 0.000 0.000 0.000 0.000 0.000 0.000
###
Consolidated Construction Consortium Ltd
Labor Productivity Standards
PAINTE PLUMB
DESCRIP UNIT UNSKILL_I MASON CARPENTER FITTER UNSKILL_II R HELPER ER
Toilet tiling sqm 0.538 0.323 0.000 0.000 0.000 0.000 0.000 0.000
###
External Painting sqm 0.000 0.000 0.000 0.000 0.000 0.027 0.080 0.000
###
Painting Door/ Wind sqm 0.000 0.000 0.000 0.000 0.000 0.022 0.086 0.000
###
DPC rm 0.052 0.052 0.000 0.000 0.000 0.000 0.000 0.000
###
Plinth Protection sqm 1.137 0.391 0.000 0.000 0.000 0.000 0.000 0.000
###
Weathering course cum 0.915 2.285 0.000 0.000 0.000 0.000 0.000 0.000
###
Rain water pipes rm 0.000 0.000 0.000 0.000 0.000 0.000 0.092 0.041
###
Staircase cum 6.342 1.493 1.120 0.746 3.730 0.000 0.000 0.000
###
Ribbed Floor GF cum 8.750 0.620 3.500 3.500 5.500 0.000 0.000 0.000
###
Ribbed Floor FF cum 8.900 0.740 3.850 3.850 5.750 0.000 0.000 0.000
###
Ribbed Floor SF cum 9.000 0.740 5.850 5.850 8.800 0.000 0.000 0.000
###
Excavation Hard soil cum 0.445 0.000 0.000 0.000 0.000 0.000 0.000 0.000
###
Excavation -Trenches cum 0.367 0.000 0.000 0.000 0.000 0.000 0.000 0.000
###
Filling Ex. Earth cum 0.236 0.000 0.000 0.000 0.000 0.000 0.000 0.000
###
Wall Concrete cum 2.200 0.150 1.668 1.250 2.000 0.000 0.000 0.000
###
Pre Cast RC Slab cum 2.100 0.156 2.050 1.050 1.200 0.000 0.000 0.000
###
Marble Flooring sqm 1.300 1.420 0.000 0.000 0.000 0.000 0.000 0.000
###
Granite Flooring sqm 0.880 0.550 0.000 0.000 0.000 0.000 0.000 0.000
###
Rikivin flooring sqm 0.050 0.050 ###
Grano flooring sqm 0.225 0.135 0.000 0.000 0.000 0.000 0.000 0.000
###
Granite cladding sqm 2.175 0.700 0.000 0.000 0.000 0.000 0.000 0.000
###
Wooden flooring sqm 0.175 0.000 0.350 0.000 0.000 0.000 0.000 0.000
###
472.5898 500
555.5556
0.891
86.78732
0.109 41014.8
0.0218
31.392 31.392
0.62784 0.62784
0.002116
0.816192 0.002592
0.97943 0.000476
0.224672
0.044934
64.70554
Cement 1.29
9 22.86 Sand 0.22
4.5 11.43
3 7.62
2.733333
3.658537
32.8
1.093333 2.733333
12
50000
9.912206 142
30
72.46377 650
102 170
237.6812 113
19.80676 127
3.658537
59.42029 160 70
4 80
1.219512
385.8025
1
Cum 5
Kg
Bag
Cum
2.5 125000
175 24850
650 19500
105 17850
80 9040
125 15875
212115