Test Plan Sample: Softwaretesting and Quality Assurance Templates
Test Plan Sample: Softwaretesting and Quality Assurance Templates
151 comments
(Names of Preparers)
(Date)
TABLE OF CONTENTS
1.0 INTRODUCTION
3.0 SCOPE
12.0 Schedules
13.0 Significantly Impacted Departments (SIDs)
14.0 Dependencies
15.0 Risks/Assumptions
16.0 Tools
17.0 Approvals
1.0 INTRODUCTION
A brief summary of the product being tested. Outline all the functions at a high level.
2.1 Objectives
Describe the objectives supported by the Master Test Plan, eg., defining tasks and
responsibilities, vehicle for communication, document to be used as a service level
agreement, etc.
2.2 Tasks
List all tasks identified by this Test Plan, i.e., testing, post-testing, problem reporting, etc.
3.0 SCOPE
General
This section describes what is being tested, such as all the functions of a specific
product, its existing interfaces, integration of all functions.
Tactics
List here how you will accomplish the items that you have listed in the “Scope” section.
For example, if you have mentioned that you will be testing the existing interfaces, what
would be the procedures you would follow to notify the key people to represent their
respective areas, as well as allotting time in their schedule for assisting you in
accomplishing your activity?
Describe the overall approach to testing. For each major group of features or feature
combinations, specify the approach which will ensure that these feature groups are
adequately tested. Specify the major activities, techniques, and tools which are used to
test the designated groups of features.
The approach should be described in sufficient detail to permit identification of the major
testing tasks and estimation of the time required to do each one.
Definition:
Specify the minimum degree of comprehensiveness desired. Identify the techniques
which will be used to judge the comprehensiveness of the testing effort (for example,
determining which statements have been executed at least once). Specify any additional
completion criteria (for example, error frequency). The techniques to be used to trace
requirements should be specified.
Participants:
List the names of individuals/departments who would be responsible for Unit Testing.
Methodology:
Describe how unit testing will be conducted. Who will write the test scripts for the unit
testing, what would be the sequence of events of Unit Testing and how will the testing
activity take place?
Definition:
List what is your understanding of System and Integration Testing for your project.
Participants:
Who will be conducting System and Integration Testing on your project? List the
individuals that will be responsible for this activity.
Methodology:
Describe how System & Integration testing will be conducted. Who will write the test
scripts for the unit testing, what would be sequence of events of System & Integration
Testing, and how will the testing activity take place?
Definition:
List what is your understanding of Stress Testing for your project.
Legacy Code
Consulting on Legacy Code
Issues Testing, Refactoring, and
Rewrite
www.r7krecon.com
Participants:
Who will be conducting Stress Testing on your project? List the individuals that will be
responsible for this activity.
Methodology:
Describe how Performance & Stress testing will be conducted. Who will write the test
scripts for the testing, what would be sequence of events of Performance & Stress
Testing, and how will the testing activity take place?
Definition:
The purpose of acceptance test is to confirm that the system is ready for operational
use. During acceptance test, end-users (customers) of the system compare the system
to its initial requirements.
Participants:
Who will be responsible for User Acceptance Testing? List the individuals’ names and
responsibility.
Methodology:
Describe how the User Acceptance testing will be conducted. Who will write the test
scripts for the testing, what would be sequence of events of User Acceptance Testing,
and how will the testing activity take place?
Participants:
Methodology:
Methodology:
5.0 HARDWARE REQUIREMENTS
Computers
Modems
————
PMI ACP
(Agile) @
₹7500
Get soft copy of
session
recordings Hands-
on learning,mock Enrol now
tests,videos
Identify special test tools needed. Identify any other testing needs (for example,
publications or office space). Identify the source of all needs which are not currently
available to your group.
6.2 Workstation
7.0 TEST SCHEDULE
Include test milestones identified in the Software Project Schedule as well as all item
transmittal events.
Define any additional test milestones needed. Estimate the time required to do each
testing task. Specify the schedule for each testing task and test milestone. For each
testing resource (that is, facilities, tools, and staff), specify its periods of use.
Problem Reporting
Document the procedures to follow when an incident is encountered during the testing
process. If a standard form is going to be used, attach a blank copy as an “Appendix” to
the Test Plan. In the event you are using an automated incident logging system, write
those procedures in this section.
Change Requests
Document the process of modifications to the software. Identify who will sign off on the
changes and what would be the criteria for including the changes to the current product.
If the changes will affect existing programs, these modules need to be identified.
Identify all software features and combinations of software features that will be tested.
Identify all features and significant combinations of features which will not be tested and
the reasons.
Specify the staff members who are involved in the test project and what their roles are
going to be (for example, Mary Brown (User) compile Test Cases for Acceptance
Testing). Identify groups responsible for managing, designing, preparing, executing, and
resolving the test activities as well as related issues. Also identify groups responsible for
providing the test environment. These groups may include developers, testers, operations
staff, testing services, etc.
12.0 SCHEDULES
Major Deliverables
Identify the deliverable documents. You can list the following documents:
– Test Plan
– Test Cases
– Test Incident Reports
– Test Summary Reports
14.0 DEPENDENCIES
15.0 RISKS/ASSUMPTIONS
Identify the high-risk assumptions of the test plan. Specify contingency plans for each
(for example, delay in delivery of test items might require increased night shift scheduling
to meet the delivery date).
16.0 TOOLS
List the Automation tools you are going to use. List also the Bug tracking tool here.
17.0 APPROVALS
Specify the names and titles of all persons who must approve this plan. Provide space
for the signatures and dates.
1.
2.
3.
4.
Do not forget to Subscribe to get latest testing Updates. Click here to Get Updates By
Email
——————————
Recommended:
Click to Get Low Cost Software Testing Templates:
For personal or organization use. 50 Word + 27 Excel templates Includes Test Plan, Logs,
Forms, Reports, Test Case, Script, Report.
Visit above page and search for “Software Testing” link to get these templates.
Like
Share
Tweet
151
Ads by Google
How Does Test Planning Differ for Manual and Automation Projects?
How to Prepare Test Plan and Write Test Cases for ERP Application –
ERP Testing Part-2
Categories: Software Testing Templates, Test Plan Template, Testing Tips and resources
151 responses
Sameer Mandve
July 31
Thanks….
I was in one of group those demanded sample Test Plan. so thanks a lot for agin.
Reply
manjunath
August 22
thanks
I gain idea about the basic test plan requirements. can you please provide me any basic
application or system test plan example which is implemented in software companies, so
that we get clear idea about the test plan ?
Reply
Dhananjay
August 29
I found this site very useful, You are doing a great job for new commerce.
Reply
manjunath
September 3
thanks
i found the test plan which is very easy and understandable…
can you please provide me bug tracking report format , so that i get how to submit bug to
developer
Reply
anjana
September 4
hi,
i am planning to do software testing course from long back.but i am still in confusion which
institute will be the best in bangalore. and which institute is giving placement assistance?
can i do both manual and automation? what is the difference? pls let me know which will not
involve programming. i dont want to get into programming.pls let me know which will suit
me. or shall i concentrate only in one course.either manual or automation. thanks.
Reply
sricharan
September 4
Reply
reddy
September 10
Reply
Ahmed Mahmood
September 10
Reply
Vijay
September 11
@ anjana – If you don’t want to go for Programming language then its useless to think about
Automation testing. So you have only one option of Manual testing which may restrict your
career.
@ sricharan – Diff. In short- Test strategy describes the overall testing approach i.e how to
test? Test strategy comes under test plan.
Test plan defines Scope, approach and what to test?
@ reddy – traceability matrix is used to map the user requirements with the deliverables. We
can use traceability matrix for mapping user level requirements to functional requirements
and also for verifying system specifications. You can use a simple excel sheet having two
columns of requirement and traceability to maintain traceability matrix.
Reply
Ahmed Mahmood
September 11
Kindly gimme some help documents through whichi start automation testing, as i have good
backgroung of programming languages
Reply
kavitha
September 28
can anyone please explain me about the traceability matrix template. .i want the format of
ttm template
Reply
kavitha
September 28
Reply
Yasoda
October 14
Hi
Still this is more usefull than the other ones but it’s great if you all can provide us template in
dco or excel format.
Thank you
Reply
Srinivas Paraasaram
October 22
Hi,
Can any one forward sample test plans and test reports for Safety critical project
Thanks in advance
Reply
Jaskaran
October 22
Reply
jagadeeshan
November 21
Can any one explain me the contents of Traceability matrix and its Templates?
Reply
Deepesh
December 12
Is there a specific format of Traceability Matrix. Should tester made it by Use Cases or SRS?
Reply
Pavani
December 12
Hi
I am pavani and have recently joined as tester. Presently I am testing a web based
application where in I am assigned to do Funcional testing., I have some questions like
Reply
Venky
December 24
Hi Kavitha,
Static Testing: Testing the application without running the application. Nothing but testing
the Documents like Business Requirement Specification, Functional Specifications and other
testing documents whether the mentioned requirements and functionalities are complete or
not. Ex: Testing the documents Test Case document for checking whether it covers the full
functional flow of the applications or not.
Dynamic Testing: Testing the application by running it currently. Ex: Testing the applications
whether it meets all the functionalities mentioned in the Functional Specifications by running
the Test Cases which are generated against the Requirements of the client.
Reply
kavitha
December 24
Hi Venky,
thank you for your reply. . .
may i know the differnce between test strategy and test plan. . does test strategy comes
within test plan?
Reply
vani
December 25
hi
i want to know the real time test case model plz send any one
Reply
ch krupakarreddy
December 26
Reply
ch krupakarreddy
December 26
Reply
ch krupakarreddy
December 26
i want to know the real time test case model plz send any one
Reply
tulasiram
December 26
what is trm . could u plese define this . how it should use in test plan?
Reply
Shibani
January 5
I am not from s/w dev background; i am basically from quality assurance; can i get involved
in software testing? what are the pre requisites .
Reply
Shibani
January 5
salim
January 24
If any experience people can teach me qtp tools and how to write a testplan in realtime
project(i will pay you 4000rs)for you guys contact [email protected] mobile 9840295153
Reply
salim
January 24
hi shibini
Reply
mina
January 29
send me updates
Reply
hansal
February 6
Hi
I AM HANSAL. LOOKING FOR A JOB IN TELECOM SOFTWARE TESTING FIELD. SO CAN
ANYBODY GIVE ME SOME WEBSITES WHERE I CAN GET SOME GOOD PROJECTS .PLEASE
HELP ME . I NEED SOME PROJECT DETAIL OF GSM,UMTS .
Reply
hansal
February 6
[email protected]
THIS IS MY MAIL ID
Reply
Sujatha
February 6
Hi,Can anybody pls let me know “what is the actual need for test strategy when there is test
Plan?”Why is test plan needed?
Reply
sethuraman
February 7
Same time, can u give a weblink to take a model online exams in software testing.
Reply
Ashish
March 13
Thanks Vijay,
It was a lot of help in the Test plan topic.
Good work, keep it up.
-Ashish
Reply
Nagesh
March 19
Hi Vijay,
I like the web-site very much. It is very useful.
What I understand is that different interpretations are given by different professional :
E.g :
Test Strategy & Test Plan
Test Strategy may be a higher level document where in it may contain various Test Plans
(Strategy may include plans for integration testing, system testing, user acceptance testing,
etc)
When I go through articles under static testing the entire life cycle activities such as various
reviews, audits, etc are covered.
I get confused. Is there any standard where in specific definitions are given so as remove
ambiguity.
Regards
Nagesh
Reply
garima
March 20
Can anyone help me regarding switching the software comapny.I want to know if anyone has
experince in Junit and manual testing after 2 yrs of experience in software industry,is his
knowledge enough to switch or need to gain more and then switch.
Reply
Tapan
March 28
Can anyone help me out with the templates for load testing, capacity planning and volume
testing…??
Reply
santosh
April 2
Hi,
Test Plan : It contains all (like Introduction, scope, s/w req. h/w req, ,…etc…).
But it is not necessary that all should be followed in TEST STRATEGY for any of the new
project, where we can modify according to the Client or Project requirements.
Reply
Harpreet Kalra
April 11
Hi,
Reply
george
April 11
@Harpreet Kalra,
Please Provide your Email id i will send you the template and i’m in need of an appreciation.
Reply
v.srinivasarao
April 11
Reply
Harpreet Kalra
April 11
Hi, My email Id is [email protected]
Please send me different type of template to do TPA if you have different. Or If you can also
send me the templates to have the High Level Estimations of Tsting…
I really Appreciate.
Thanks,
Harpreet
Reply
kiran
April 17
Testing metrics templates and description for all types of metrics collected
Reply
santosh
April 18
Hi Sujatha,
Test Plan : It contains all (like Introduction, scope, s/w req. h/w req, ,…etc…).
But it is not necessary that all should be followed in TEST STRATEGY for any of the new
project, where we can modify according to the Client or Project requirements.
Reply
Suresh Balakrishnan
June 2
Hi Sujatha,
This is suresh working as a Test Engineer i think better you visit following Sites these are
most helpful for you http://www.stickyminds.com, http://www.qastreet.com,
http://www.sqa-guide.com, http://www.testinggeek.com.
Thanks,
Suresh Balakrishnan.
Reply
sh
June 18
I don’t know how to write scope for integration testing Besides, I somehow mix the objectives
with acceptance criteria. Could anyone clear me about those please?
Thanks in Advance
Reply
Prajakta
June 20
I have done my B.Sc.(Chemistry). & also done my software testing diploma in SQTL. I am
fresher & wants jobs in testing.
But please request to my all friends dont join SQTL.
Because they dont have any placement. Don’t join SQTL.
Don’t join SQTL.
Reply
durai
September 23
Reply
Arun Vijayaraghavan
October 16
Test Plan and Test strategy documents are extremely important in any project. Both
documents are usually frozen at the beginning of the test engagement, but do under constant
changes and revisions. We can call both documents to be live documents.
Test plan is a document that contains list of activities that would be a part of testing the
application (AUT). A test plan contains the following details:
Test Strategy – Test Strategy is a document that talks about how the testing is to be carried
out across each phase. Take for example, in Unit testing phase test strategy would define
entry and exit criteria along with ways and means of how the module would be unit tested.
Test Strategy would vary from phases to phase since same strategy cannot be followed for
two phases keeping in mind no two phases of testing are similar.
So, eventually Test Plan is a parent document the contain test strategy as a child document.
The perception of test plan and test strategy would vary from organization to organization
and even project to project.
Regards,
Arun
http://www.focustesting.com
Reply
Nagaraju
November 17
Reply
CharlieW
December 13
Hi Deepesh
At my company we have worked with various customers, some of whom use traceability
matrices, and I don’t think there is any standard format. Some populate tables by hand in MS
Word specifications containing requirement tags for example.
We prefer to auto-generate a requirements traceability matrix using an in-house tool
(www.pixref.com), and there are other tools on the market. Our tool trawls through the
specification and implementation files searching for requirement tags, and automatically
lists which match and which do not.
Cheers
Reply
Karthik
December 17
Guys,
Does anybody have a Project Classification documents… i.e. project falls on which category,
it’s small or medium project…. etc.
Thanks in advance!
Karthik
Reply
Vaiju
December 27
Reply
Vaiju
December 27
Reply
Rama Subramanian
January 4
Hi
I wish to know about Master Test Plan (Strategic Test Plan) and how is it different from the
normal test-plan that is made for each level 1) unit testing 2) Integration Testing 3) System
Testing and 4) Acceptance Testing?
Is Strategic/ Master Test Plan ever made in Practical Testing Environment? Why is Master
Test Plan necessary? How is it different from Actual Test Plan? What are the different Criteria
that go into the making of Master Test Plan? Who is involved in Making a Master Test Plan?
How many Years of work-expereince in required before a Test-Engineer starts designing a
Master Test Plan? Kindly email me the reply to
email id : [email protected]
Reply
Rama Subramanian
January 5
Hi!
Can anybody in the forum tell the difference between Strategic Test Plan and ordinary test
Plan? Kindly explain what is the Master or Strategic Test Plan means?
Reply
Anuradha
January 9
Can any one provide me a real time sample of a test plan? Thanks In advance
Reply
Mani
March 2
Hi
Anyone tell a test case for registration page to createa user for osa.com
Reply
santosh
March 2
Hi Anuradha,
Wht you see is what the testplan contains. Still if you feel that you are not satisfied with that ,
then i would def provide you the real time testplan.
Thanks,
Santosh Palvai
anybody can reach me @ [email protected]
Reply
sivakumar kakarla
March 2
Reply
saurabh
March 13
Can any one provide me a real time sample of a test plan? Thanks
saurabh
Reply
Memory Leeuw
April 7
Can somebody please recommend a site where I can get a sample of a test case or send me
a sample of at test case. Thanks Memory
Reply
Vitboy
May 4
I don’t know if copying chunks of text out of a well known standard is plaigarism, but at least
citing it as a reference may make you look a little more legit.
Best of luck.
Reply
Vitboy
May 4
Reply
leena
June 4
Thank you very much for sample test plan.
It is very helpful.
Reply
sundar
June 20
Hi friends,
I am doing manual testing and performing load test by using jmeter test tool. can u tell me
how to prepare the performance- load test report..
with regards
sundar
Reply
Prabhakaran
July 23
can anyone explain what is test design doc & test plan.
how it differs.
Reply
ramu
August 4
hello!
Reply
Sam
September 8
———————–
3 Principal Test Documents
———————–
1. Test Policy (Organisation Level)
Reply
keerthi
September 11
Reply
Sinde sugatri
October 2
Reply
Vishal
November 17
Thanks in advance.
Vishal
Reply
siva
November 19
hi vishal
1)Test plan should be started immediately after the requirements are available. It should be
flexible enough so that if the requirements gets changed, then the plan should also be
changed accordingly
2)a)Scheduling is based on the project deadlines.
b)Resource estimation is based on the project size. In general QA resources are half the
development team size. Also you need to prepare Staffing matrix which can give you idea of
how many resources are required for a particular module. For example, if there are 3 modules
in a project then you can hire 3 persons, one for each module. Similarly you can also
categorize by type of testing.
Reply
selvan
November 20
Guys
Can you please send me the template to do estimation using Test Point ANalysis. Harpeet or
George, I see you both discussing on this as well.
Thanks
Selvan
Reply
selvan
November 20
Guys
Can you please send me the template to do estimation using Test Point ANalysis to
[email protected]. Harpeet or George, I see you both discussing on this as well.
Thanks
Selvan
Reply
anandhan
November 28
1) What is diff b/n unit testing and white box testing(WBT) and it have any related link and
WB tester can test the unit testing and voice versa?.
2)how can test acceptance testing without alpha and beta testing(that is end user)
Reply
Viswa
January 13
Hi Anadhan,
1. Unit testing is usually done by developers where they will be testing every function
point/unit which they are developing before it is being integrated to other application. White
box testing can be conducted by a developer or a tester, white box testing is conducted with
the motive of identifying/pointing a defect/bug exactly where inside the code.
2. Alpha testing is usually called first phase of testing, where it will be tested within the
project team like unit testing, FVT (functional verification testing), system testing. Beta
testing is the one executed along with the end user, usually called User Acceptance Testing
or Certification testing. It cannot be executed without the end user.
Reply
harshad
January 26
plz anyone send me a some example of test cases ,so i can get what the exact idea of it?
Reply
Jaipal Reddy
February 4
Hi all i am looking for Agile Testing Process and Agile Test Plan Templates.
Reply
Nisha
February 16
hi,
i am planning to do software testing course from long back.but i am still in confusion which
institute will be the best in bangalore. and which institute is giving placement assistance?
can i do both manual and automation? what is the difference? pls let me know which will not
involve programming. i dont want to get into programming.pls let me know which will suit
me. or shall i concentrate only in one course.either manual or automation. thanks.
Reply
renuka
March 3
hi
am doing final mca project for testing managment so i need for test plan fields formats .
Reply
Rachna
March 17
Hi,
Its duration,fees,how to apply,which website provide online training for the same.
Reply
Siva
March 17
Hi Rachna
Beginner certificate in Testing would be ISTQB. Once you finish this, you can try for CSTE or
CSQA
Thanks
Siva
Reply
soumen pandit
March 25
hi,
i an mca 2ng years student
I want to know that Test planning for project name Medicine stock system
Reply
Rupali
March 26
Please explain me the diff. between Function testing & Functinality testing
Thanks,
Rupali
Reply
Somu
April 5
Hi friends,
I advised to freshers like me… this is pretty site for learning Testing…
I thank to who establish this site.
Regards,
Somanthan R.
Reply
Somu
April 5
@ Rupali,
There is no difference between Functional and functionality testing. They are having same
meaning To Test the functionality of the system.
Reply
divya
April 7
hi guys
can any one tel how to report a defect in qc wen there is no test case id…..
Reply
[email protected]
April 8
hi divya,
Reply
divya
April 9
hi venket,
thanx 4 ur reply , but how vil the defect be fix….. tis was asked in interview……
Reply
Decent
April 30
It is really very useful. Please keep the things like that up!
Reply
Ritu
June 20
Hi..Am testing a web application.In tat application OS has been upgraded.So i need TEST
STRATEGY & TEST Plan for OS upgrade.kindly send me yaar.
My id is [email protected]
Reply
satya
June 23
hi how to plan write the test cases in iam workig on mannual testing how can i start the test
process iam new in testing please
Reply
ethi
June 24
hi,
i am planning to do software testing course from long back.but i am still confusion to see
lots of test…what will be the best for me.just i want get a job any how , can i do both manual
and automation? what is the difference? or shall i concentrate testing course.plz szst me
what will ve to do to find the testing job.
thanks
Reply
Viswanathan D
June 24
Hi Satya, Go through requirements and understand the changes in the application. Download
a simple test plan template and put your scope and test strategy in that test plan. For
preparing test cases, understand the flow of the application and bring in to your imagination
for different kind scenarios how application works, and start your test cases putting those
scenarios in to as test cases. Let us know any one of here if you need any clarification.
Writing test case is an art, build that skill within you and I am sure you will enjoy writing test
cases.
Thanks,
Viswanathan D
[email protected]
Reply
Viswanathan D
June 24
Hi Divya,
When you come across a defect and if it does not have a test case, then you need to update
your test case accordingly through following change test case process. A defect need to
have test cases, please tell this answer in your next interview.
Thanks,
Viswanathan D
[email protected]
Reply
breisa
July 16
Wow! Thank you so much, this will be very helpful for my very first thesis. :3
Reply
Viswanathan D
July 19
Viswanathan D
[email protected]
Reply
balasubramanian
July 20
Why we should prepare system & integration test plan
Reply
balasubramanian
July 20
Reply
Viswanathan D
July 20
First, System test plan is prepared to make our self ready to prepare the entire system which
is being developed from the scratch. System test plan is prepared only if the application or
product is completely new. And the application or product need to undergo all type of testing
like Functional, Performance, Load, Certification, UAT etc.
Second, Integration test plan is prepared if a product or application being developed by
several team or several developers and if one complete module output is going to be as a
input for another module, then this Integration Test Plan will be useful to plan accordingly. So
when two systems being integrated the possibilities of issues are like software compatibility,
input variable map etc. So these needs to be tested completed when its integrated. Hope its
clear now.
D. Viswanathan
[email protected]
Reply
balasubramanian.k
July 21
Thanks for guiding me. My another query is under which circumstances do we prepare unit
,integration & system test plan
Reply
balasubramanian
July 21
Reply
D. Viswanathan
July 21
“Unit Testing”
Unit Testing is usually done by developers, they don’t prepare exact test plan for Unit Testing.
They will write high level test cases where the scope of the testing will be limited to within
their module or functionality undergone changes. Unit Testing/White Box Testing is also
done by experienced Test Engineers who has knowledge on coding in the respective
platform. Unit Testing executed by testers are mostly to show the defect where exactly in the
code it is affected.
Reply
Bhushan
August 10
HI
Please send me some real time example of test cases
on my email
[email protected]
thanks
Reply
sivakumarbabu.kakarla
October 10
please provide the details of testing jobs in GIS product based commpanies
Reply
sivakumarbabu.kakarla
October 10
Please provide the details of Product support jobs in ESRI India Ltd ASAP.
Reply
Chandan
October 16
HI
Please send me some real time example of test cases & test data on my email.
Reply
Yuvarani
October 16
Please send me some real time example of functionality test cases for field level testcases
Reply
thiyagarajan
November 9
Reply
Mahesh
December 13
Reply
Gemson
January 17
Reply
Sam
January 17
I need the entire details about this QA test specially fees and certificate details also
qualifications!
mail me to:
[email protected]
(Reply me here)
Reply
Hanna
January 17
Reply
Peniel
January 17
Reply
Jeni
March 17
Hi,
I want to know how to get a job in s/w testing. I have 5+ years of s/w deveopment experience
and after that I took a 6 year break from IT to handle family responsibilities. Now I want to
comeback in IT field but not in the development. I feel testing/quality area would be little less
consuming than mainstream development. Correct me if I am wrong.
Can anybody send me details about testing job, some reading material and courses which
can help getting a job in today’s demanding job mkt.
thanks
Reply
sharuk
March 31
Reply
Hareesh Kumar
April 13
Hi,
Thanks a lot for the detailed test plan template.
I would like to know the test strategy how to apply.
And test estimation techniques.
-Hareesh
Reply
negar
May 16
hi,would you please suggest me some basic techniques for preparing an idea of test plan for
car manufacturing?
thanks alot
negar
Reply
preethi
June 8
I am complted mca 2010 fresher.I am complted course testing.how to get a job..plz tel me
Reply
naresh QA
August 28
preethi just put 6 month live project Experience in Testing recognized Training center or take
One year fake Experience
No problem ……….
Reply
Reply
Sharuz
September 4
Hiii,
First of all thanks…:), i found this site is very useful… Please send me some real time example
of test cases & test data on my email..
Reply
rinku
October 16
Reply
pallavi patil
December 2
Reply
Janki
December 6
@ Pallavi
Reply
kiran
January 27
I got the test plan ,how to create test plan and who are resposible for it
Thanks a lot for your information
Reply
anju
February 10
Reply
wushaa
February 23
hey this is great the guide is clear and well explained thanks for this, this could help
amateurs like me
Reply
soulami
April 3
Is it possible to have unit,integration and system all the three in the same document?
Reply
soulami
April 3
Reply
Thanks
Reply
Saket
August 18
But what I want to know who work on Test Plan means Who make it. I am sure this is a work
of QA Lead so my question is that WHETHER THE TEST PLAN CONTAINS THE NAME OF QC
EXECUTIVE MEANS WHICH SOFTWARE TESTER WILL DO WHAT?
Reply
Saket
August 18
Reply
rida
September 17
what is the format of writting the test plan for conversion/migration testing?
Thanks
Reply
Aman Agrawal
October 9
Sir i am new in this field, so i just want to know from where should i start learning software
testing.
Please help me.
Best Regards,
Aman Agrawal
Reply
Shiva
October 21
Plz Remove this advertisement in to the study material it some time irritating me
Reply
dara prameela
May 27
hi…please can u explain the diff btn module testplan and system testplan
Reply
dara prameela
May 27
Reply
PRUDHVI
June 15
Hi every one
it is very importent for me….
can plz tell me QA process and provide me QA templates.
Reply
kumlama
July 5
Hey there! I simply would like to give you a huge thumbs up for your excellent info you’ve got
right here on this post. I am coming back to your web site for more soon.
Reply
Joseph
July 15
Hi Vijay, if possible, can you send me a sample test plan( written on an existing
website/application)?
Reply
praca w szkocji
September 5
Reply
subramanikrishnan
October 10
Hi am i interesting in s/w testing field doing now manual testing and future which testing
useful and weather information sharing for me..
Reply
Priya
October 22
Hi,
Please can any one of u tel how to apply for ISTQB certification? Is there any course given for
that?Where is it?
Please give me details about ISTQB because i dont ve any idea. Please.
Regards,
Priya
Reply
jazzy
December 13
Reply
Joed S. Myname
February 21
Hey guys, anyone can help me? i’m struggling with my system documentation please
send me an realtime testing documentation of a sales and inventory system
i will look after to that please help me
Reply
Manikandan
June 26
Reply
Ashok
October 22
Hi Guys,
Anyone can help me? i need E Commerce based test plan document. If any one having
please send me. this is my email id “[email protected]”
Reply
Ashok
February 17
Anyone can help me? i need E Commerce based test plan document. If any one having
please send me. this is my email id “[email protected]”
Reply
Leave a Reply
Name*
E-Mail*
Website
Publish
Back to top
Mobile Desktop