Competency Awareness & Training Procedure
Competency Awareness & Training Procedure
TRAINING PROCEDURE
1.0 PURPOSE:
To establish and maintain procedure for training, awareness and competence at BCG
2.0 SCOPE:
This procedure covers for personnel whose work or task affect quality of product / service and environment
and as well as OH&S.
3.0 RESPONSIBILITY:
The MR shall be responsible for specific in-house training programme and the Project Managers shall be
responsible for on-job training.
PM Project Manager
HR Human Resource.
MR Management Representative
OJT On Job Training
TNI Training Need Identification
5.0 PROCEDURE:
5.1.1 Based on the Organization Chart, the MR and as well as the HR head ensures that Competency
Requirement is determined for various roles across functions / department and levels.
5.1.3 The MR also ensures that the roles, responsibilities, authority and accountabilities (where necessary)
are documented and agreed in Job Descriptions BCG/TM/FRM -09/13for various roles across the
organization.
5.2.1 The MR and PM ensures that gaps with the Competency required for the designated role is identified
and documented in the Training Plan BCG/TM/FRM -10/13.
5.2.2 The Training needs pertaining to the QHSE Management System shall be identified as
At the start of implementation of QHSE Management System.
Annually, at the time of employees performance appraisal.
At the time of joining of new employees.
Introduction of Process/ Activity, which has Significant Impact on HSE.
Page 1 of 3
Doc Name: COMPETENCY AWARENESS AND
TRAINING PROCEDURE
5.2.3 Training Plan is prepared by the MR & HR Head once every year in Jan and updated as need arises.
5.2.4 MR shall identify the areas for awareness training and personnel to be trained based on the
responsibility, ability, literacy and risk as per the following table.
Sr.
Area/ Topic Personnel to be Trained
No.
5.2.4 The Trainings (including OTJ) are recorded in the Training & Evaluation Record
BCG/TM/FRM -11/13
5.3.1 Post completion of the Training the respective PM evaluates the effectiveness of the Training or other
actions taken either in the following manner;
Page 2 of 3
Doc Name: COMPETENCY AWARENESS AND
TRAINING PROCEDURE
Evaluation results-
(a) On scale of 1-5
1- No improvement noticed, 2- Understood Basic, 3- Able to Apply in his Area of Work - to some
extent, 4- Able to apply to a large extent in his work & 5- Apart from point 4- is able to influence others
as well.
(b)Direct qualifiable remarks from his superiors.
(c )- Based on the Test Marks scored during the Training / Workshop
5.3.2 These details are documented in Training & Evaluation Record BCG/TM/FRM -11/13
within a maximum of 4 months from the date of completion of Training / action taken by the respective PM
and conveyed to the concerned personnel and the MR.
6.0 RECORDS
BCG/TM/FRM -09/13 1
BCG/TM/FRM -11/13 2
7.2.7.3.4.4.2 BCG/TM/PRO-05/13
BCG/TM/FRM -11/13 3
Page 3 of 3