Highest Flood Level ((HFL)) = 635.021 m
Lowest Bed Level (LBL) = 632.150 m
Rugosity Co-efficient (N) = 0.040
Usingg Manning's
g Formula
Wetted
Relative Distance Offset Area(A) Perimetre
NSL (m)
Distance (m) (m) (m) (m²) (P)
(m)
-38.967 634.180 9.533
-29.434 635.326 1.815 0.00
-27.619 634.824 17.880 0.06 0.05 1.82
-9.740 634.662 9.740 0.22 2.47 17.88
0.000 634.212 3.198 0.67 4.32 9.75
3.198 631.549 1.984 3.33 6.40 4.16
5.182 630.659 3.191 4.22 7.49 2.17
8.373 631.549 1.979 3.33 12.05 3.31
10.352 632.949 4.102 1.93 5.21 2.42
14.454 633.756 2.890 1.13 6.27 4.18
17.344 634.235 10.615 0.65 2.56 2.93
27.959 634.354 14.947 0.53 6.23 10.62
42.906 635.524 0.00 3.94 14.96
HFL:339.100 638
636
634
632
630
-45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45
OD STATE, LOT-3
Bridge at Chainage km. : 135+694 (MNBR)
AT DOWNSTREAM FROM 168 MTR.
Wetted
Relative NSL Distance Offset Area(A) Perimetre
Distance (m) (m) (m) (m) (m²) (P)
(m)
-39.066 634.995 11.9865
-27.079 634.860 8.7782 0.00
-18.301 634.750 1.4023 0.01 0.05 8.78
-16.899 632.147 16.8989 2.61 1.84 2.96
0.000 629.392 6.9734 5.37 67.45 17.12
6.973 632.393 4.0782 2.37 26.98 7.59
11.052 633.584 2.5883 1.18 7.23 4.25
13.640 634.811 0.3283 0.00 1.52 2.84
13.968 635.387 3.2102
17.178 635.503
D I S C H A R G E C A L C U LA T I O N S
P = 0.6
f = 0.980
A = 1981 Hectare
L = 11.799 km
H = 30.000 m
tc = 4.600 hr
Io = 56 mm
DESIGN DISCHARGE (As per clause no. 6.2.1, IRC SP 13 2004) = 140.85 Cumec
SCOUR CALCULATION BY USING LACEY'S EQUATION
Chainage km. : 135+694 (MNBR)
FOR ABUTMENT
Maximum Depth of Scour for Abutment = 1.27 x dsm = 2.287 m
m
Grip length = 0.762
Maximum Scour Level for Abutment = 632.594 m
FOR PIER
Maximum Depth of Scour for Pier = 2.0 x dsm = 3.601 m
Grip length = 1.200 m
Maximum Scour Level for Pier = = 631.280 m
As p
per clause 106.8.2,, IRC : 5 - 2015,,
The minimum vertical clearance = 0.9 m
Height of bearing above the design highest flood level = 0.2 m
Pedestal height = 0.3 m
Bottom of Superstructure = 636.281 m
Depth of Superstructure = 2.000 m
Depth of wearing coat = 0.065 m
Hence,, the depth
p of superstructure
p includingg the wearingg coat = 2.065 m
Providing 20 m psc girder bridge without footpath = 2.065
Bridge Formation Level (FRL) = 638.346 m