Description Column SSM 6th SSM 7th Comments Edition Edition Drawing No. Qusu 3/0 Rcs 1A Site Excavation Earthworks (Provisional)

The document is an individual assignment detailing the excavation and foundation work for a construction project. It includes: 1) Excavation of the site and holes for foundations down to 2 meters deep. 2) Formwork and reinforcement for concrete column bases and foundations. 3) Placement of 10MPa blinding concrete at the bottom of excavated holes and 20MPa concrete in column bases. 4) 30MPa concrete poured in the columns. 5) Backfilling around foundations with excavated material after concrete has cured.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
118 views11 pages

Description Column SSM 6th SSM 7th Comments Edition Edition Drawing No. Qusu 3/0 Rcs 1A Site Excavation Earthworks (Provisional)

The document is an individual assignment detailing the excavation and foundation work for a construction project. It includes: 1) Excavation of the site and holes for foundations down to 2 meters deep. 2) Formwork and reinforcement for concrete column bases and foundations. 3) Placement of 10MPa blinding concrete at the bottom of excavated holes and 20MPa concrete in column bases. 4) 30MPa concrete poured in the columns. 5) Backfilling around foundations with excavated material after concrete has cured.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 11

INDIVIDUAL ASSIGNMENT BENTO SA STUDENT NUMBER: 216034686

SSM 6th SSM 7th


DESCRIPTION COLUMN COMMENTS
EDITION EDITION
DRAWING No. QUSU 3/0 RCS 1a

SITE EXCAVATION
EARTHWORKS ( PROVISIONAL)

CLEARANCE OF SITE

Clearance of site by the removal


of all debris, bushes, vegetation Clause 4 Clause 4
15.80 7.90 hedges, rubbish and trees not Page 6 Page 20
exceeding 200mm girth.

4900 3= 14700
300/2=150
1100-300=800
800/2=400
14700+150+150+400+400= 15800

EXCAVATION

1100*1100 mm
Column 1000
Base( pad) 450
Blinding layer 100
1550
1200*1200 mm
1000
500
100
1600

Excavation in picable material for Clause 6 Clause 7


holes not exceeding 2m deep. Page 6 Page 20

6 1.10 1.10 1.55 ( 1A,2A,3A,1D,2D,3D)

6 1.20 1.20 1.60 (1B,2B,3B,1C,2C,3C)

&

Backfiling to sides of foundation Clause14 Clause 14


with excavation material Page 8 Page 22
INDIVIDUAL ASSIGNMENT BENTO SA STUDENT NUMBER: 216034686

PAGE 1
SSM 6th SSM 7th
DESCRIPTION COMMENTS
EDITION EDITION

Excavation contin.

EO all excavations for Holes excav. in Clause 6 Clause 6


m3 S/R (Allow 10%) of total excavation Page 6 Page 20
volum

ROC
(1A,2A,3A,1D,2D,3D)

2/1100 2200
2/1100 2200
4400

(1B,2B,3B,1C,2C,3C)

2/1200 2400
2/1200 2400
4800

ROC

ROC to sides of excavation of Clause10 Clause 10


holes exceeding 1,5 m from NGL Page 7 Page 21

6 4.40 1.55 (A1,A2,A3,1D,2D,3D)


6 4.80 1.60
(1B,B,3B,1C,2C,3C)
INDIVIDUAL ASSIGNMENT BENTO SA STUDENT NUMBER: 216034686

PAGE 2
SSM 6th SSM 7th
DESCRIPTION COMMENTS
EDITION EDITION

WORKING SPACE

Back excavation of vertical sides


6 4.40 1.55 to excavation in picable material
for working space including back
filling in 150mm layers compacted Clause 11 Clause 11
6 4.80 1.60 to 95% MOD AASHTO density Page 7 Page 21
exceeding 1,5m deep and not
exceeding 3m deep for placing and
removing formwork to column
and bases 1 m away form
column and bases.

1.00 1.00 KEFFW Clause 12 Clause 14


ITEM Page 7 Page 22

CONCRETE, FORMWORK AND


REINFORCEMENT

FORMWORK TO BASES
500 450
100 ( A) 100 (B)
600 550

( 1A,2A,3A,1D,2D,3D) A

( 1B,2B3B,1C,2C,3C) B

Rough formwork to sides of bases of


foundation

NB: Formwork to bases include 100 Clause 12 Clause 10


mm thick concrete blinding Page 14 Page 32

6 4.40 0.55 A

6 4.80 0.50 B
INDIVIDUAL ASSIGNMENT BENTO SA STUDENT NUMBER: 216034686

PAGE 3
SSM 6th SSM 7th
DESCRIPTION COMMENTS
EDITION EDITION

Blinding
10 Mpa Mass concrete in blinding Clause 2 Clause 2
with 19mm stone to bottom of Page 13 Page 31
concrete bases
6 1.10 1.10 0.10 A

6 1.20 1.20 0.10 B

&

Ddt Clause14 Clause 14


Backfilling as before Page 8 Page 22

&

ADD
EO excavation for carting for carting Clause 9 Clause 9
away surplus material Page 7 Page 21

20 MPa reinforced concrete with Clause 2 Clause 2


19mm stone to column bases. Page 13 Page 31

6 1.10 1.10 0.45 A

6 1.20 1.20 0.50 B

&

Ddt Clause14 Clause 14


Backfilling A.B Page 8 Page 22

&

ADD Clause 9 Clause 9


EO excavation for carting away Page 7 Page 21
surplus material A.B
INDIVIDUAL ASSIGNMENT BENTO SA STUDENT NUMBER: 216034686

PAGE 4

SSM 6th SSM 7th


DESCRIPTION COMMENTS
EDITION EDITION

Formwork to columns

300

300

2/300 600
2/300 600
1200

12 1.20 1.00 Rough formwork to sides of columns clause 12 Clause10


Page 14 Page 32

30 Mpa reinforced concrete to Clause 2 Clause 2


columns in foundations Page 13 Page 31

&
12 0.30 0.30 1.00
Ddt Clause14 Clause 14
Bakfill A.B Page 8 Page 22

&

ADD Clause 9 Clause 9


EO for carting away surplus material Page 7 Page 21
A.B
INDIVIDUAL ASSIGNMENT BENTO SA STUDENT NUMBER: 216034686

PAGE 5
INDIVIDUAL ASSIGNMENT BENTO SA STUDENT NUMBER: 216034686
INDIVIDUAL ASSIGNMENT BENTO SA STUDENT NUMBER: 216034686
INDIVIDUAL ASSIGNMENT BENTO SA STUDENT NUMBER: 216034686
INDIVIDUAL ASSIGNMENT BENTO SA STUDENT NUMBER: 216034686
INDIVIDUAL ASSIGNMENT BENTO SA STUDENT NUMBER: 216034686