0% found this document useful (0 votes)
52 views9 pages

Chapter III2

The document describes the system development life cycle (SDLC) process for developing an automated tabulation system. It outlines the 5 phases of SDLC: planning, analysis, design, implementation, and maintenance. In the planning phase, the project is identified and a development team is assembled. In analysis, current systems are studied and user requirements are determined. In design, required software is acquired and system details are developed. In implementation, the program is developed, installed, tested, and users are trained. In maintenance, the system performance is monitored and errors/enhancements are identified.

Uploaded by

ivy mae flores
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views9 pages

Chapter III2

The document describes the system development life cycle (SDLC) process for developing an automated tabulation system. It outlines the 5 phases of SDLC: planning, analysis, design, implementation, and maintenance. In the planning phase, the project is identified and a development team is assembled. In analysis, current systems are studied and user requirements are determined. In design, required software is acquired and system details are developed. In implementation, the program is developed, installed, tested, and users are trained. In maintenance, the system performance is monitored and errors/enhancements are identified.

Uploaded by

ivy mae flores
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 9

Gantt chart

Task November December January February March


Name W W W W W W W W W W W W W W W W W W W W
K K K K K K K K K K K K K K K K K K K K
1 2 3 4 1 2 3 4
1 2 3 4 1 2 3 4 1 2 3 4
Planning
Phase
Identify
the
project
Developm
ent Team
Develop
project
charter
Analysis
Phase
Conduct
Prelimin
ary
Investig
ation
Study
Current
system
Determin
e user
requirem
ents
Recommen
ded
Solution
Design
Phase
Acquire
the
hardware
and
software
required
Develop
the
details
of
system
Implemen
tation
phase
Develop
the
program
Install
the
system
Test the
system
Train
users
Maintena
nce
Phase
Conduct
System
Identify
error
and
enhancem
ent
Monitor
System
performa
nce

Table 1: Gantt Chart


Conceptual Paradigm

INPUT PROCESS OUTPUT

- Insert the - Compute the


- Show the
candidate score points
results of
information of the
the winner
- Insert judge contestant.
- Automated
information - Total Points
Tabulation
- Select - Generate
System
Candidate points
- Select highest to
Criteria lowest
Chapter 4

Design and Methodology

In this study shows the System Development Life Cycle

(SDLC), to discuss the process to expand and build a system with

a sequence of steps or function that can be determine as a system

life cycle model. It can be specify as a collection of formula,

proficiency, device and documentation, which make it easier to

arise and implement a new information system. There are usually

five stages in this cycle: planning that used to obtain for

approval project, initiate, assess, feasibility, plan, schedule,

analysis that helps to understand the processing needs, design

that describe solution system based on requirement and analysis

decision, implementation that construct, test, train users,

install new function in system, and maintenance that keep system

healthy and improve.


System Development Life Cycle (SDLC)

Planning

Analysis

Design

Implementation

Maintenance

Figure 4. System Development Life Cycle (SDLC)


4.1 PLANNING

The planning stage is obtain for approval projects,

initiate, assess, feasibility, plan and schedule.

4.1.1 Identify the project

We identify the uses, function of the system and

for those who use the system.

4.1.2 Development team

We have a programmer that creates the system and

the others are focussing on thw documentation

4.1.3 Develop project charter

The team develop the documentation of the system

by chapter and we are in the same place while making it.

4.2 ANALYSIS
In the analysis phase understand the processing needs.

4.2.1 Conduct preliminary investigation

4.2.2 Study current system

We make a system that is more useful than the

other system.

4.2.3 Determine user requirements


We ask for requirements of the system to make it

more useful and easily to manage by the tabulator

4.2.4 Recommend solutions

In this we appply more ways to solve problems that

we encounter

4.3 DESIGN

Design solution system based on requirements and analysis

Decision.

4.3.1 Acquire the software required

You need is browser to open it and you have to use

windows os.

4.3.2 Develop the details of the system

The system we develop is user friendly

4.4 IMPLEMENATION

Construct, test, train users, install new function in

System.

4.4.1 Develop the program


We develop the system carefully and we add the

user requirements

4.4.2 Install the system

4.4.3 Test the system

We the are testing the system repeatedly to

identify the errors

4.4.4train the users

The system needs to introduce to user so we can

train them

4.5 MAINTENANCE

Keep the system healthy and improve

4.5.1 Conduct system

4.5.2 Identify error and enhancement

We identify the error and we try to solve it

4.5.3 Monitor system performance

The system is not perfect but we try to improve it


DATA FLOW DIAGRAM (DFD)

JUDGE ADMIN

Candidate scores Log-in Credential

Score Submission Account Log-in

Item details
Store details

MY_DB

Candidates score

Submission Notification

View Score

VIEWER/ADMIN

You might also like