Bill Formats - Divisional Engineer's Office - Minneriya
Bill Formats - Divisional Engineer's Office - Minneriya
Bill Formats - Divisional Engineer's Office - Minneriya
BOQ
Item Times Length Width Depth /
Item Description / Sketch Unit Quantity Quantity
No. / No (m) (m) Height (m)
No.
Above measurements were jointly taken and agreed as correct & accurate
Name and signature of the Contractor Name and signature of the Technical Officer of the Divisional Engineer's office
NCPED 02
Advance Calculation
VAT -12%
No Details Net(LKR) Total(LKR)
(LKR)
1 Total Advance to be deducted
2 Advance deducted by this IPC
3 Advance to be recovered
Recommended by …………………………………………
Accountant (Signature)
Name - ………………………………………………..
Date - ………………………………
The quantities of the work executed and measured , recorded in the measurement sheets and the corresponding rates and amounts incorporated in this
Interim Payment Statement are provisional and subject to correction in subsequent payment certificates.
Recommended Approved
………………………………………………………….. …………………………………………………………
Chief Engineer (Buildings) Director (Buildings)
Date - ………………………… Date - …………………………
NCPED 03
Cumulative up to this
Item As Per BOQ Certified up to Previous Statement Statement for this Period
Description Statement Remarks
No.
Amount (Rs) Amount(Rs) Amount (Rs) Amount (Rs)
1 -
2 -
3 -
4 -
5 -
Grand Total 0.00 - - 0.00
NCPED Staff
Contractor
Technical officer Divisional Assistant Divisional Engineer
(a) All the measurements are jointly taken according to the method of (a) All the measurements are jointly taken according to the (a) Billing items are satisfied to the specifications of NCPED and the measurements are (a) I satisfied with quality and quantities of billing items and certify
measurement and measurements are correct. method of measurement and measurements are correct. correct. that the value of work done, according to the agreement is Rs.
………………………………....................................(before VAT)
and passed for the payment of
(b) I certify that items on this bill is accordance with the b)I certify that above amounts are correct according to the agreement. Rs.......................................................................................................
BOQ of the agreement. ............................................................................................................
(b) I certify that the all billing items are according to the agreement and (c) I certify that the quality of work is according to the (c)All the serviceable salvage materials were properly handed over to respective officer ............................................................................................................
confirms with the specifications and quantities are correct. specifications of buildings construction and maintenance ............................................................................................................
work adopted by the Provincial Buildings Department. .......... (in words) (before VAT) to the contractor.
(Rs...........................................................)
Date …………………………………………………….….
Draughtsman
Name and signature of the contractor / contractor's representative (a) Checked rates and arithmetic accuracy of the billing
items.
(b) I certify that they are correct according to the BOQ of Date .......................................................................... Date .............................................................................
the agreement
Date ...............................................................................
Date …………………………………………………….….
NCPED 04
NORTH CENTAL PROVINCE
SUMMARY OF INTERIM PAYMENT STATEMENT (FOR BOQ ITEMS) WORK DONE AS PER ORIGINAL CONTRACT ITEMS
- - - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
NCPED Staff
Contractor
Technical officer Divisional Assistant Divisional Engineer
(a) All the measurements are jointly taken according to the method of measurement and (a) All the measurements are jointly taken according to the (a) Billing items are satisfied to the specifications of NCPED (a) I satisfied with quality and quantities of billing items and
measurements are correct. method of measurement and measurements are correct. and the measurements are correct. certify that the value of work done, according to the
Variation Order is Rs.
………………………………....................................(before
(b) I certify that items on this bill is accordance with the b)I certify That the above amounts are correct according to VAT) and passed for the payment of
BOQ of the respective variation order. the respective variation order. Rs..............................................................................................
..................................................................................................
..................................................................................................
(b) I certify that the all billing items are according to the respective variation order and (c) I certify that the quality of work is according to the (c)All the serviceable salvage materials were properly
..................................................................................................
confirms with the specifications and quantities are correct. specifications of buildings construction and maintenance handed over to respective officer
................................................. (in words) (before VAT) to
work adopted by the Provincial Buildings Department.
the contractor.
…………………………………………….... (Rs...........................................................)
Date..........................
Name and signature of draughtsman
Date.......................... Date..........................
NCPED 06
NCP PROVINCIAL ENGINEER'S DEPARTMENT
INTERIM PAYMENT STATEMENT - VARIATIONS (EXCEEDING BOQ QUANTITY AND NEW RATES)
Certified up to Previous
As per the Approved Variation Order Statement
Statement for this Period Cumulative up to this Statement
V.O. Pay Item No /
Item No Description Remarks
NO. Spec No
Unit Qty. Rate (Rs) Amount (Rs) Qty. Amount (Rs) Qty. Amount (Rs) Qty. Amount (Rs)
(a) All the measurements are jointly taken according to the (a) All the measurements are jointly taken according to the method of (a) Billing items are satisfied to the specifications of NCPED (a) I satisfied with quality and quantities of billing
method of measurement and measurements are correct. measurement and measurements are correct. and the measurements are correct. items and certify that the value of work done,
according to the Variation Order is Rs.
………………………………................................
(b) I certify that items on this bill is accordance with the BOQ of the b)I certify That the above amounts are correct according to ....(before VAT) and passed for the payment of
the respective variation order. Rs............................................................................
respective variation order.
................................................................................
................................................................................
(b) I certify that the all billing items are according to the (c) I certify that the quality of work is according to the specifications of (c)All the serviceable salvage materials were properly handed ................................................................................
respective variation order and confirms with the specifications buildings construction and maintenance work adopted by the Provincial over to respective officer ................................................................................
and quantities are correct. Buildings Department. ......................................... (in words) (before
VAT) to the contractor.
(Rs...........................................................)
Name and signature of the technical officer
……………………………………………....
Date..........................
Draughtsman Name and Signature of the Divisional Assistant
Name and signature of the contractor / contractor's (a) Checked rates and arithmetic accuracy of the billing items.
representative
(b) I certify that they are correct according to the BOQ of the
respective variation order Date..........................
Signature of divisional Engineer
NCPED 06
Certified up to Previous
As per the Approved Variation Order Statement
Statement for this Period Cumulative up to this Statement
V.O. Pay Item No /
Item No Description Remarks
NO. Spec No
Unit Qty. Rate (Rs) Amount (Rs) Qty. Amount (Rs) Qty. Amount (Rs) Qty. Amount (Rs)
Certified up to Previous
As per the Approved Variation Order Statement
Statement for this Period Cumulative up to this Statement
V.O. Pay Item No /
Item No Description Remarks
NO. Spec No
Unit Qty. Rate (Rs) Amount (Rs) Qty. Amount (Rs) Qty. Amount (Rs) Qty. Amount (Rs)
NCPED 06
Certified up to Previous
As per the Approved Variation Order Statement
Statement for this Period Cumulative up to this Statement
V.O. Pay Item No /
Item No Description Remarks
NO. Spec No
Unit Qty. Rate (Rs) Amount (Rs) Qty. Amount (Rs) Qty. Amount (Rs) Qty. Amount (Rs)
NCPED 07
INTERIM PAYMENT STATEMENT - VARIATIONS (NEW BOQ QUANTITY AND NEW RATES)
D.E.Division :- Minneriya Contract No :.......................
Name of the Job :- Statement No:...................................
Name of the Contractor :-
Period :- : From…………............... To…...................………... Date of Submission:........................... Sheet No : …….. Of …….
Certified up to Previous Cumulative up to this
As per the Approved Variation Order Statement for this Period
Statement Statement
V.O. Item Pay/
Description Remarks
NO. No spec Amount Amount Amount
Unit Qty. Rate (Rs) Qty. Qty. Amount (Rs) Qty.
item (Rs) (Rs) (Rs)
no.
Extra work
........................................... Signature of
…………………………………..…
(b) I certify that they are correct according to the divisional Engineer
BOQ of the respective variation order Date..........................
Date.......................... Date..........................
NCPED 08
-
- -
Sub - Total - - - -
Deduction - Less Discount if any-
Sub - Total after Deduction
Other Entitlement - Value of Additional - Work /Variation /
B
Claims
- - -
Sub - Total - - - -
C Price Fluctuation
Sub - Total
D Gross Valuation of the Works D=A+B+C - - 0.00 0.00
11. Calculation of Advance Repayment / Retention
E Addition - -
Advance Payment ( ……...of Contract Price without Provisional Sum)
Releasing Retention Money
F Deductions
Retention (10% of Interim Payment Certificate)
(Limit of Retention Money 5% of Contract Price)
Sub - Total
G Total Payment Before VAT G = D + E -F
H 15% VAT Payment
I Total Payment Including VAT
Certified by …………………………………………
Divisional Engineer
Name - ………………………………………………..
Date - ………………………………
NCPED 09
NCP PROVINCIAL ENGINEER'S DEPARTMENT
VALUATION OF MATERIAL AT SITE
Clause No. of the Conditions of Contract : 10.1b of Section 3 ( Conditions of Contract of minor contracts) / 42.5 of Section 3 ( Conditions
of Contract-procurement of works)
IPC No.
Name of Contract
D.E.Division Minneriya
Contract No.
Statement No.
PAYMENT FOR THIS PERIOD - CARRIED FORWARD TO SUMMARY (NCPED 08 & NCPED 03) -
Name and Signature of the Name and Signature of the Name and Signature of the
Contractor Technical Officer (NCPED) Divisional Assistant (NCPED)
NCPED 10A
NCP PROVINCIAL ENGINEER'S DEPARTMENT
PRICE ADJUSTMENT (For Contract up to Rs.10 Million)
As per clause 47.1(a) of section 3 (Conditions of contract)
3 Cumulative value of work done + 80% of Material at site in previous IPC (Rs) - A
4 Value of work done + 80% of Material at site in current IPC (Rs) - B (Rs)
5 Value of Non Adjustable Item in Previous IPC (Rs) - C
6 Value of Non Adjustable Item in Current IPC (Rs) -D
7 The month relevant to current composite Index ITC
8 Base composite Index IBT
9 Current composite Index ITC
10 V=(B-A) (Rs)
11 Vna=(D-C) (Rs)
12 Price Adjustment F=0869*(V-Vna)*(ITC-ITB) / ITB (Rs)
13 Vat (12%) for Price Adjustment F (Rs)
14 Price Adjustment With VAT for the IPC No. (Rs)
Declaration by the contractor :- I certify that the calculations are done according to the conditions given under
SIMPLEFIED ICTAD FORMULA method, also the used data are correct.
We certify that the calculations are done according to the conditions given under SIMPLEFIED ICTAD FORMULA
method, also the used data are correct. The amount is within the allocation. Recommended for paying the amount ,
calculated as above.
ICTAD FORMULA
F= 0.966 (V-Vna) X ∑ Px (Ixc - Ixb)
100 Ixb
all inputs
Vna 2=
0.966 (V-Vna)
=
100
NCPED 10B
Price Adjustment sheet for the IPC No………………
(Ixc- Px (Ixc-
SI No. Description Px Ixb Ixc
Ixb)/Ixb Ixb)/Ixb
Px (Ixc - Ixb)
Sum of
Ixb
0.966 (V-Vna) x Sum of Px (Ixc - Ixb)
= -
100 Ixb
Price adjustment for IPC No……………………………………………..is Rs………………………
Declaration by the contractor :- I certify that the calculations are done according to the conditions given under
SIMPLEFIED ICTAD FORMULA method, also the used data are correct.
………………………………………………………………..
We certify that the calculations are done according to the conditions given under ICTAD FORMULA method,
also the used data are correct. The amount is within the allocation. Recommended for paying the amount ,
calculated as above.
Checked By
I certify that the following documents of above contract were checked and accordingly for the payment.
To be Initialed by
C.M.A.
1 The bill was certified by the Divisional Engineer : Yes
2 The measurement sheets were signed and dated by both Contractor
: Yes
and T.O. of the NCPED
3 T.O. and D.A. have recommended the bill : Yes
4 All the documents were signed and dated by the Contractor : Yes
5 The bill was checked and signed by the relevant officers : Yes
6 Whether the date stamp on the bill : Yes
7 Yes / Not
Variation Orders were approved by the relevant Authority :
applicable
8 Quality assurance report is attached : Yes
9 Yes /Not
Completion Certificate / Maintenance Certificate is attached :
applicable
10 Yes /Not
Extension of time approved :
applicable
11 Yes /Not
Liquidated damages were deducted :
applicable
12 Payment Voucher : Yes
12.1 The payment receiver is correct according to the agreement : Yes
12.2 Expenditure head is according to the allocation letter : Yes
12.3 Discription of the payment is according to the agreement and :
Yes
payment number is correct
12.4 Relevant File number was indicated : Yes
12.5 Initialed the officers, who prepaired and checked the voucher : Yes
12.6 Payment summery was attached with the voucher : Yes
12.7 Signed the officers who have recommended , approved and certified :
Yes
the voucher
……………………………………………… …………………
Name & Signature of Chief Management Assistant Date
NCPED 12
NCP PROVINCIAL ENGINEERING DEPARTMENT
……………………………… ………………….
Name & Signature of the Contractor Date
09. Recommendation of Technical Officer and Divisional Assistant ( Comments for each reasons) :
…………………………………………………………………………………………………………………………………………….
…………………………………………………………………………………………………………………………………………….
…………………………………………………………………………………………………………………………………………….
………………………………………………………………………………………………….. ………………………………………………………………
Signature & Name of the Divisional Signature & Name of the Technical Officer
Assistant
Date :……………………. Date :…………………….
Page 22 of 36
NCPED 12
10 Divisional Engineer's Recommendation / Approval :
…………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………
………………………………………………………………….
Signature & Name of the Divisional Date :……………………………….
Engineer
…………………………………………………………………………………………………
Director (Buildings) Date :……………………………….
12 Approved
…………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………
Deputy Chief Secretary (Engineering Services) Date :……………………………….
***When recommending EOT ,relevant officer's shall personally satisfy with the justification given, &
extension of time should be strictly in accordance with the conditions of contract.
Page 23 of 36
NCPED 12
Page 24 of 36
NCPED 13
If the aggregate amount of the variation (due to quantity changes and extra works orders issued), is
exceeding the contingency provision (which should be 10% maximum) the Head of the Department the shall
obtain the approval from the Client before issuing such variation orders. Head of the Department may use
the following format.
Amount (Rs.)
3 Percentage of Contingencies Provided in the TEC
%
Amount (Rs.)
Aggregate Variations (Including Changes in
4 % from the original
Quantities) to-date
Contract Price
5 What is/are the Reason/s for the current variation/s? (Tick below as one or both as appropriate)
Amount (Rs.)
5.1 EXCESS
5.2
Sub Total -
Note:- This variation is based on the rates in the agreement B.O.Q. Accordingly contractor is entitled for
price escalation.
Page 25 of 36
NCPED 13
(Amount in
word) ...................................................................................................................................................................
.....................................................................................................................................................................
Checked by :-
..........................................
Divisional Engineer
...........................................
Date
Approved by :-
....................................................................................
..............................................
Date
Copy to:-
1
2
3
Page 26 of 36
NCPED 14
WEATHER REPORT
1 2 1 2 1 2 1 2 1 2
3 3 3 3 3
23 23 23 23 23
6 6 6 6 6
20 8 20 8 20 8 20 8 20 8
18 10 18 10 18 10 18 10 18 10
17 12 17 17
17 12 12 12 17 12
1 2 1 2 1 2 1 2 1 2
3 3 3 3 3
23 23 23 23 23
6 6 6 6 6
20 8 20 8 20 8 20 8 20 8
18 10 18 10 18 10 18 10 18 10
17 12 17 17 17 17
12 12 12 12
1 2 1 2 1 2 1 2 1 2
3 3 3 3 3
23 23 23 23 23
6 6 6 6 6
20 8 20 8 20 8 20 8 20 8
18 10 18 10 18 10 18 10 18 10
17 12 17 17
17 12 12 12 17 12
1 2 1 2 1 2 1 2 1 2
3 3 3 3 3
23 23 23 23 23
6 6 6 6 6
20 8 20 8 20 8 20 8 20 8
18 10 18 10 18 10 18 10 18 10
17 12 17 17
17 12 12 12 17 12
22
1 2
3
23
6
20 8
18 10
17 12
1 2 1 2 1 2 1 2
3 3 3 3
23 23 23 23
6 6 6 6
20 8 20 8 20 8 20 8
18 10 18 10 18 10 18 10
17 12 17 17
12 12 17 12
1 2 1 2 1 2 1 2 1 2
3 3 3 3 3
23 23 23 23 23
6 6 6 6 6
20 8 20 8 20 8 20 8 20 8
18 10 18 10 18 10 18 10 18 10
17 12 17 17
17 12 12 12 17 12
1 2
3 Heavy Rain
23
6
Normal Rain
20 8
Name and Signature of Contractors Representative Name and Signature of Technical officer
NCPED 15A
NCP PROVINCIAL ENGINEER'S DEPARTMENT
……………………………………
Name and Signature of the Technical Officer Date - ………………
………………………………….
Name and Signature of the Divisional Assistant Date - ………………
…………………………..…………
………………………..……………
……………………………..……...
…………………………..…………
In reference to the Contractor’s letter no. ………………….. and dated on …………….. as per the Clause No.7.1 in
Condition of Contract for minor contracts / Clause no.55.1 of procurement of works, this is to certify that the Contractor
has completed the work under this Contract on ……………
(In a case of substantially completions justify that decision and provide list of outstanding work to be attended by the
Contractor and when these work are to be completed)
The date of completion as per the original Contract was …………………………. and as per the approved extensions
amended date of completion is …………………………….
Accordingly, the Contractor is not liable for delay damages for a period of ………….. days as per the Clause No. 49/6.4
in Condition of Contract.
The Defect Liability Period is from …………………. to …………………… as per Clause No.35.1/8.1 in Condition of
Contract.
Attachments:
1. A copy of letter/letters of request by the Contractor.
2. A list of outstanding work in the case of substantial completion
3. A summary of completed work with a set of as-build drawings
NCPED 16
Dear Sir,
I personally state that the below detailed contract was well-completed according to the BOQ and
Specifications of the agreement and you are kindly requested to make arrangements to pay the first half /
second half / full amount of the retention (As per Clause 10.5/10.6 of Condition of Contract)
Further, I oblige to rectify any defects which arise due to construction failure or failures of this contract
within the defect liability period.
I personally inspected the site and all the defects have been rectified by the contractor. Therefore I
recommend paying of First Half / Second Half / Full Amount of the Retention as per the Clause 10.5/10.6 of
Condition of Contract
………………………………………………..
Date :- ……………………………….. Name & Signature of Divisional Assistant
I recommend paying of First Half / Second Half / Full Amount of the Retention in order to the Clause
10.5/10.6 of Condition of Contract). And all defects were rectified by the contractor according to the BOQs.
Amount of this payment is Rs ………………………………………………..
…………………………………………….
Date :- ……………………………………….. Name & Signature of Divisional Engineer
Approved.
…………………………………………….
Date :- …………………………………… Name & Signature of Director
NCPED 17
CONTRACT REGISTER
Details of Bonds
Performance Bond Advance Bond Other
Bond No.
Date
Name of the Issuing Agency
Amount(Rs.)
Expire Date
Bond Extended Date
NCPED 18A
PROVINCIAL ENGINEER'S DEPARTMENT
Divisional Engineer’s Office – Minneriya
PACKAGE No :-
3
Sub total 1 -
4 Allow for Physical Contingencies 10% -
5 Price Excalation 5% -
Sub total 2 -
6 Allow for VAT (Sub total 2) 15% -
7 Allow for Administrative Charges (Sub total 2) 5% -
8 Quality Control Process (Sub total 1) 1% -
Sub total 3 -
Grand Total (Rs.)(Sub total 2+Sub total 3) -
Date
Checked by
Recommended by
Approved by
NCPED 18B
PROVINCIAL ENGINEER'S DEPARTMENT
Divisional Engineer’s Office – Minneriya
PACKAGE No :-
3
Sub Total -
6 Allow for VAT (Sub total) 15% Err:520
Grand Total Err:520
………………………………………………….
Signature / Rubber Stamp
Witness :
1 …………………………………………………………………………………..
2 …………………………………………………………………………………..
PRDD 19
IPC No.
Name of Contract
D.E.Division
Contract No.
Statement No.
RATE
ITEM NO DESCRIPTION UNIT QTY. AMOUNT (Rs.)
(Rs.)
PAYMENT FOR THIS PERIOD - CARRIED FORWARD TO SUMMARY (PRDD21 & PRDD13) -
Name and Signature of the Contractor Name and Signature Name and
of the Technical Signature of the
Officer (PRDD) Senior Technical
Officer (PRDD)
ජේෂ්ඨ කාර්මික නිලධාරිගේ නිර්දේශය
රුපි: ............................... ක් වටිනා චෙක්රෝලක් නිකුත් කිරීම නිර්දේශ කරමි.
..................................
දිනය :- ................................. ජේෂ්ඨ කාර්මික නිලධාරි
.................................
දිනය :- ................................. ප්රාදේශීය ඉංජිනේරු
නිකුත් කිරීම
චෙක්රෝලක් අංකය :-
මුද්රිත අංකය :-
චෙක්රෝලක් වටිනාකම :-