2.0 INTRODUCTION
Pharmaceutical Formulation plant having tablet , capsule,liquid manufacturing facility, which is situated
________________________ India.
The facility was designed in the year ____________________ to meet the national, International,
The manufacturing facility is supported by Engineering, Ware house, Quality control and Quality Assurance
department. All these departments are covered under the relevant validation activities.
The Validation Master plan is a dynamic document which provides complete over-view of validation
program.
It describes the overall objective, intention approach for establishing performance adequacy of equipment,
utilities, processes and systems.
Do Not Sell My Personal Information
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
you consent to the use of ALL the cookies.
2.6 It identifies the scope of validation, applicable validation protocols-reports, procedures and frequency of
Cookie settings ACCEPT
validations.
https://pharmaguidances.com/validation-master-plan/ 4/37
8/24/2020 VALIDATION MASTER PLAN
3.1 The organisation is committed to the concept of validation and all Processes facilities, equipment’s,
Machines, Instruments, Control Systems, Utilities, and analytical methods are put through appropriate
qualification and validation cycles before being accepted for use. Performance Qualification shall be carried
out for all critical equipment’s used for manufacturing, Engineering and Quality control.
3.2 All systems are subject to ongoing validation to evaluate the impact of changes in process, systems,
Three Validation studies are carried out as per protocol prepared by nominated team members from various
departments.
3.4 For certain equipments/ Instruments, on case –by –case basis the manufacturers qualification documents
shall also be taken as inputs for qualification activities. This includes pre delivery inspection and FAT.
4.0 OBJECTIVE
Validation Master Plan is a document, which describes our company’s intentions and the methods which are
related with validation of the equipments, instruments, systems, utilities, facilities, materials, analytical
methods and processes.
Validation program is designed to demonstrate that the facility for the production up to final stage of
production of different dosage forms is capable of meeting the process parameters in a repeatable and
controllable manner.
Validation Master Plan ensure that validation activities are carried out as per respective protocols and after
completion will determine whether the equipment, system, process and methods,
Is capable
Do Not of consistently
Sell My Personal Informationproducing a product that is fit for use.
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
you consent to the use of ALL the cookies.
4.4 The critical utilities, equipment & process validation program are established in accordance with the
Cookie settings ACCEPT
methods and procedures maintained by the product requirements which are based on the currently available
https://pharmaguidances.com/validation-master-plan/ 5/37
8/24/2020 VALIDATION MASTER PLAN
product information and the Current Good Manufacturing practices, guidelines and other regulations.
4.6.1 The management to know and access what the validation programme involves and understand its
necessity.
4.6.2 The validation team members to understand their tasks and responsibilities.
4.6.3 To understand the company’s approach towards validation and the set up of organising validation
related activities.
5.0 SCOPE
5.1 The scope of this document is to describe the systems and methodology used to execute the various
phases of the validation program .
5.2 It applies to all critical equipments, instruments, procedures, utilities, facilities and other quality
supporting systems used for manufacturing, processing, testing, labelling and packaging which may affect the
1. Facilities
3. Utilities (e.g. HVAC, Water system, Pure steam and Compressed Air.)
5. Manufacturing processes
6. Cleaning processes
7. Analytical methods
6.1 Validation
Cookie settings Team
ACCEPTConstitution
https://pharmaguidances.com/validation-master-plan/ 6/37
8/24/2020 VALIDATION MASTER PLAN
6.1.1 The over all validation process is co-ordinated by a team, which is a working group comprising of
qualified personnel as required for the specific validation activities.
6.1.2 The validation team is made up of representatives from the following areas:
Production
Engineering
Quality control
Approving all validation protocols and report for each validation from respective functional department
heads.
Reviewing each protocols and reports content to assure compliance with current regulations and guidelines.
Verifying the adequacy of the tests used for the verification of the system as established by the validation
protocols.
Document control.
6.1.4 Other personnel will be utilised, as necessary, by the members of the validation team to assist the
assessment of the special equipment, system, utilities where their area of expertise will facilitate the
development & execution and assure the quality of the validation efforts.
Preparation
Cookie settings ofACCEPT
the batch records in collaboration with Quality assurance.
https://pharmaguidances.com/validation-master-plan/ 7/37
8/24/2020 VALIDATION MASTER PLAN
Transferring the processes to the production facility, in collaboration with Quality assurance.
Providing all current and approved standard operating procedures to be used as part of manufacturing
process.
Providing personnel and materials as required for the execution of validation protocols, equipment trials and
process trials.
Executing DQ, IQ, OQ & PQ with validation team members as per validation protocols.
Operating & maintaining plant, facilities, equipment, support systems and the specific manufacturing
processes within its design limits.
2. Calculations
3. Instrument list
4. Maintenance requirements
8. Operational recommendations
Co-ordination of calibration activities for all critical instruments as defined by the validation team
Executing
Do Not Sell Mythe installation
Personal and
Information maintenance of production facilities and laboratories.
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
Training
you ofthe
consent to alluse
engineering personnel in technical, validation and GMP/ GEP aspects.
of ALL the cookies.
Download
Continue to download
Donwload Now
bb.archimegasuper.com
ﻓﺗﺢ
1 APPROVAL
2 INTRODUCTION
3 VALIDATION POLICY
4 OBJECTIVE
5 SCOPE
6 VALIDATION RESPONSIBILITIES
14 VALIDATION SCHEDULE
15 ANNEXURE
16 GLOSSARY
APPROVAL
The Validation Master Plan has been initiated, checked, approved and authorized for implementation by the
undersigned.
INITIATED BY
Download
Continue to download
Donwload Now
bb.archimegasuper.com
ﻓﺗﺢ
[Validation]
CHECKED BY
DESIGNATION
Do Not Sell My Personal Information NAME SIGNATURE DATE
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
you consent to the use of ALL the cookies.
Quality Control Head
Cookie settings ACCEPT
https://pharmaguidances.com/validation-master-plan/ 3/37
8/24/2020 VALIDATION MASTER PLAN
NOTE: Critical instruments are those which have direct impact on the product quality, i.e. Instruments which
Training of all Quality control personnel in technical, validation and GMP/ GLP aspects.
Preparing laboratory reports by collecting data and verified summaries of findings and conclusions.
Ensuring that the laboratory systems, instruments, devices and equipment to be used in the course of
Co-ordinating the preparation of the validation protocols for each Area, system, Facility, Utility, equipment,
Instrument.
Co-ordinating the process validation by monitoring, sampling, testing and challenging the specific
manufacturing processes.
Co-ordinating all change control approvals. Organising the changes required to approved protocols resulting
from specification changes or changes in operating parameters.
7.1.1 Pharmaceutical plant have provide manufacturing facility for different dosage forms as tablets,Liquid &
capsule.
Do Not Sell My Personal Information
The
We use plant
cookiesisonfunctionally divided
our website to give into
you the mostdifferent blocks viz.
relevant experience Change Rooms,
by remembering Administration,
your preferences Quality
and repeat visits. Assurance,
By clicking “Accept”,
you consent to the use of ALL the cookies.
Quality Control, Production, Service Floor, Warehouse, Utility, Engineering Workshop, Canteen and the
Cookie settings ACCEPT
https://pharmaguidances.com/validation-master-plan/ 9/37
8/24/2020 VALIDATION MASTER PLAN
Gate House. Quality Control Laboratory is contagious to production operations, whereas there exists an In-
The Production and supporting areas have been made in a cluster module with covered interconnecting
corridors and feasibility for modular expansion. The building is made of Reinforced Cement Concrete
(RCC), and designed such, that no beams or columns are visible in the manufacturing and testing areas.
The walls of the plant are constructed of brick and plastered to provide a hard smooth finish, with minimised
recesses. The Production, Quality Assurance, and the interconnecting corridors have quota stone and only
warehouse have hygienic Epoxy flooring.
The return air risers of the HVAC system are concealed within the wall to avoid recesses. The terminal
filters and lighting fixture are recess type, ceiling mounted. All the services to the manufacturing area are
provided from the first floor, (designated as the Service Floor) through Galvanised iron.
Sanitary type drains have been provided in the production and testing areas. Further, concealed drainage
line has supplied to effluent treatment plant. All drainage is treated to bring down the COD and BOD to
predetermined levels. This treated water is then used for gardening.
The Power Supply system features the facility to control voltage fluctuations and an automatic changeover
system from the state power supply to stand by power generation system in case of power failure.
7.1.9 The building is surrounded on all sides by a fire hydrant loop, maintained at high pressure.
7.2 Description of Products: As per attached Annexure (Make and attached Product list here)
7.3 Description of Process ow:As per attached Annexure (Make and attached list here)
7.4 List of equipments: As per attached Annexure (Make and attached list here)
Phase III – Execution of Validation protocols, tests laid down in Validation Protocols and data collection.
Phase IV – Preparation of Validation Report, Compilation of data collected during Validation, review,
recommendations and Approval of Validation Report. Document shall be kept under custody of the Quality
Assurance.
8.1.2 The Validation Master Plan (VMP) shall be prepared by the Validation Executive.
8.1.3 The document shall be checked by the heads of all Functional area.
The document shall be approved by the Quality Assurance Manager and General Manager. The document
shall be Authorised by Vice President .
8.1.4 There shall be separate Protocols for DQ, IQ, OQ, PQ (where ever applicable), Environment Control,
Analytical method validation, Facility, Utility, Process Validation, and Cleaning Validation etc. All the protocols
shall be numbered as per SOP for the numbering of protocols and reports.
8.1.5 The Protocols shall consist of the Objective, scope, responsibilities,procedures for conducting the tests
for Validation. The results observed during the validation studies, summary, conclusion and final approval
the Validation Protocols. Concerned HOD and HOD’s of the Production, Engineering shall approve. Quality
Assurance Manager & General Manager shall finally authorize the validation protocols.
8.1.7 The Approved Master copies of protocol shall be kept in the custody of the Quality Assurance Manager.
During execution of validation protocol, validation report shall be prepared as per protocol and attached the
After the execution of the protocols, a validation task report shall be reviewed, summarise, concluded and
Do Not Sell My Personal Information
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
recommendations made by the team carrying out the validation activity and approved by the involved team
you consent to the use of ALL the cookies.
members.
Cookie settings ACCEPT
https://pharmaguidances.com/validation-master-plan/ 11/37
8/24/2020 VALIDATION MASTER PLAN
The system shall designed to assure that all validation documentation shall prepare accordingly validation
policies establish by a validation team, which shall responsible for the co-ordinating the validation program
This system shall design to manage all documents generated during the validation process, including that
from the change control program. The system will include a numbering system to identify each protocol and
an index to list of all approved protocols. It assures that all documentation shall properly stored and controlled
This system shall assure that all requirements outlined in the approved validation protocol are met and thus
system shall considered to valid. To comply with these requirements this system shall establishes the
procedures to be followed for co-ordination of the validation tasks through the validation team. This system
shall also provides assurance that the information collected is timely, correct and is properly reviewed and
9.1 De nition:
9.1.1 ‘The collection and evaluation of data, beginning at the process development stage and continuing
through the production phase, which ensures that the facility, equipment, manufacturing process, control
systems, utilities including personnel and materials are capable of achieving the intended results on a
consistent and continuing basis and thus is capable of consistently producing a product that meets the
9.1.2 Validation is an documented evidence which can confirm predetermined critical parameters.
Do Not Sell My Personal Information
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
you consent to the use of ALL the cookies.
9.2 Validation Types:
Cookie settings ACCEPT
https://pharmaguidances.com/validation-master-plan/ 12/37
8/24/2020 VALIDATION MASTER PLAN
1. Facility validation:
Dimension of area:
Height (Meter), Length (Meter), Width(Meter), Area (M2 / Ft2) Volume (M3/Ft3 ).
Area Details:
Walls:
Wall to floor, wall to false ceiling, Wall to return air riser, Wall to door frame.
Type, Dimension (W X H meter), No of doors, Location, Painting, No and type of door closer, No and type of
Windows:
Drainage:
Electrical work:
Wiring type, no. of light fittings and type arrangement for emergency light. No. of telephone points, no. of
computer points, no. of Power sockets, no. of single phase sockets & type, no. of three phase sockets &
type, no. of lighting switch box & type Illumination level in Lux.
Indication box, Size, Location Indication, pressure Indication, temperature Indication, humidity and Door
status.
Other facilities:
Fly killer, Air curtain, PVC strip door, SS corner angle, SS fenders, Fan Safety, Pass box.
Vendor Qualification shall be carried out for all vendors of Raw and Packing Materials, to ensure that the
Vendor evaluation shall be done on the basis of questionnaire, pre-shipment samples, machine trials and/or
a vendor audit .
Control
1.Cookie system
settings
validation:
ACCEPT
https://pharmaguidances.com/validation-master-plan/ 14/37
8/24/2020 VALIDATION MASTER PLAN
The objective of the computer system validation is to demonstrate that the computer system performs
v Quali cation (DQ/ IQ/ OQ/ PQ) of Computer Hardware and software:
To control the equipment/ instrument/ system, computer hardware and software systems used as a part of
equipment or instrument or system must be validated. Design qualification, Installation qualification and
instrument/ system.
To expedite the process of validation, the computer system validation shall be done as a part of equipment/
The following are the contents for computer hardware and software validation:
Control panel
Power supplies
CPU
Processor
Capacity
Disk type
Ports
Monitor
Manufacturer
Model
Type
Size
Software
Password control
Input devices
RAM
CDROM
2. Computer Hardware
Manufacturer
Model No.
Serial No.
Communication processor
Printers
Do Not Sell My Personal Information
Screens
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
you consent to the use of ALL the cookies.
Floppy disk drives
Cookie settings ACCEPT
Hard disk drives
https://pharmaguidances.com/validation-master-plan/ 16/37
8/24/2020 VALIDATION MASTER PLAN
Temperature
Humidity
Electromagnetic field
Calibration – List of all calibrated instruments for the computer control systems and make this list as a part
of validation document.
Electrical – Verification of the control system and/ or control wiring has been installed as per manufacturer’s
drawing and specifications and confirm correct identification of wires or air control lines in the control panel
3. Computer Software
Software
Verification whether the controller operates as a stand alone device or as part of a distributed system. If the
controller operates as part of a distributed system, verify that the program is written to prevent unauthorised
Verification that the following phases of software life cycle have taken place ,
Requirements
Design phase
Performance phase
Logic
Do Not Sellflow diagram
My Personal Information
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
you Operating
consent to themanual
use of ALL the cookies.
4. Controlled devices:
Verification that the controlled devices for the system as per approved drawings, specifications and
authorised change orders.
Verification that all the controlled devices have been installed and tagged as per ,
Manufacturer
Model
Location
Description
Function
Calibration date
ID number
Verification that all the wiring done as per specifications. Execution of point to point verification between the
control panel. Confirm the correct identification of wires and / or air control lines.
Evaluate the controlled functions for their potential effect on the quality strength, purity and safety of the
final product.
2. Design Qualification
3. Installation Qualification
4. Operational Qualification
5. Performance Qualification
Cookie
1.0 settings
Introduction ACCEPT
https://pharmaguidances.com/validation-master-plan/ 18/37
8/24/2020 VALIDATION MASTER PLAN
2.0 Overview
3.1 Capacity
3.2 Specifications
3.4 Environment
3.5 Maintenance
4.2Development
4.3Testing
4.4 Delivery
4.5 Support
5.0 Glossary
6.0 References
7.0 Approval
Installation
2.Cookie settings Quali cation (IQ)
ACCEPT
https://pharmaguidances.com/validation-master-plan/ 19/37
8/24/2020 VALIDATION MASTER PLAN
Installation Qualification is documented check that all key aspects of the installation adhere to appropriate
codes, approved design intentions and that manufacturer’s recommendations are suitably considered.
To qualify, the specifications of the new equipment received, must match with the URS . Any exceptions to
the original Purchase order or Functional specification shall be documented and justified. Attribute
inspection of the equipment/ Instrument/ System shall be carried out, documented and proper installation
shall be verified.
All modifications in existing equipments shall be properly documented through a change control procedure.
It may not be possible to inspect and verify every feature associated with a piece of equipment. In such
cases, a
Approval
Objective
Scope
Responsibility
Procedure
Re-qualification criteria
Abbreviations
Reference
1. OQ demonstrates that the equipment/ Instrument/ System can operate throughout it’s dynamic range of
operation, within limits and tolerances as per specified in the operating manual or instructions.
This demonstration of equipment’s basic operation shall involve all control parameters of the equipment.
OQ shall be carried out for equipment/ Instrument/ System that will be used routinely in manufacturing,
Objective
Scope
Responsibility
Procedure
Re-qualification criteria
Abbreviations
Reference
All critical equipment / Instrument/ System are qualified for performance verification.
The study shall involve the challenging of the system to simulated worst case situations, and establishment
of operating variables.
Approval
Objective
Scope
Responsibility
Procedure
Acceptance criteria
Re-qualification criteria
Abbreviations
Reference
NOTE: All equipment, Instrument and system shall have required separate qualification protocol and report.
1. Process validation:
Do Not Sell My Personal Information
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
you consent to
Process the use of ALL
validation the cookies.
is established documented evidence which provides a high degree of assurance that a
Cookie settings
specific process will
ACCEPT consistently produce a product , meeting its predetermined specifications and quality
https://pharmaguidances.com/validation-master-plan/ 21/37
8/24/2020 VALIDATION MASTER PLAN
characteristics.
If a new product is duplicasy of the existing product then its validation shall be bracketed with the existing
product.
The purpose of process validation is to demonstrate the reliability and reproducibility of manufacturing
process, within established parameters and to assure batch uniformity and integrity of drug products. A
process validation program shall establish a documented evidence of three full-scale production batches.
The validation protocol shall be a written document that defines and gives the detail of critical steps of
manufacturing process. It shall state, how the validation program will be conducted and lists acceptance
The process validation batches shall be taken for packing after completion of 30 days hold time study for the
initial batches manufactured, Provided the product meets the Finished product / release specification/ upon re
analysis.
Prospective validation
Concurrent validation
Retrospective validation
Revalidation
1. Prospective validation:
Prospective Validation shall be carried out on the small scale or R & D batches during development stage.
These validations were carried out to identify the processing steps, equipment settings and process timings,
which can prove to be critical in overall impact of product quality. All these steps, equipment setting and
process timing are evaluated to finalise the setting parameter. Limits of all critical parameters shall put
tentatively.
This draft form of study can lead towards the finalisation of Batch Manufacturing Record / Batch Packing
4. Calibration of equipment
7. Sampling plan
2. Concurrent validation:
1. This validation comprises of determination and evaluation of process parameters applicable from scale up
Process validation for establishing the predetermined limits of all critical parameters by conducting three
Validation carried out during routine production or products manufacturing for sale.
The tests are finalised based on evaluation of the results of these batches. These batches were monitored
Matrix approach can be applied to process validation. The matrix approach means that a plan to conduct
process validation on different strength of same product, manufactured by the same process and similar
type of equipment. e.g. validation on one strength (preferably smallest) as a representative amongst the
multiple strength of the same product. This approach should be in accordance with cGMP and should
Note: The batches will not be dispatched unless and until the analysis of the validation sample is completed.
3. Retrospective validation:
Historical trending of all critical parameters obtained from analytical results and / or IPQC results observed
after testing of physical, chemical and microbiological parameters of product manufactured by same
process. To ensure that all the parameters shall be in the limit and in uniform range.
Do Not Sell My Personal Information
Retrospective
We validation
use cookies on our shall
website to give youdone yearly
the most ofexperience
relevant productsbyor batches your
remembering manufactured inrepeat
preferences and previous year.
visits. By clicking “Accept”,
you consent to the use of ALL the cookies.
Minimum first 20 batches shall consider for retrospective validation. If less than 20 batches were
manufactured in one year then batches of previous years were consider for trending.
4. Revalidation:
Periodic revalidation: This type of revalidation shall be done on periodic basis as per specified frequency.
Revalidation after any change : All validated equipment, systems, processes, products etc. shall be
continuously monitored for any change, to be considered for revalidation of the same.
2) Change of site /location of the equipment / instrument / System from qualified existing place to other place.
3) Any major modification in the existing equipment / instrument /System since purchase which can have an
Manufacturing Process:
A change in the validated manufacturing process that has an effect on the quality and efficacy of the finished
2) Raw Materials
3) Equipment
4) Batch Size
1. Cleaning validation:
Do Not Sell My Personal Information
De nition:
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
you consent to the use of ALL the cookies.
· Validation of the process by which the equipments are cleaned is called as cleaning validation.
Cookie settings ACCEPT
Objective:
https://pharmaguidances.com/validation-master-plan/ 24/37
8/24/2020 VALIDATION MASTER PLAN
Cleaning validation is an important mechanism to protect the pharmaceutical products from cross
cleaning agent, micro-organisms or any foreign particle as borne particles, dust, raw materials etc.
This should be performed to provide a documented evidence that the procedure being followed for cleaning
of equipment and accessories is effective and removes residues of previous batch / product up to a
predetermined acceptance level, using a well defined protocol and acceptance criteria.
For equipments which are not product specific, cleaning procedure for such equipment should be able to
Procedure:
There are two methods employed for sampling during cleaning validation. These are Rinse and Swab
method. Rinse method will be applicable when swabs are not practically possible.
Cleaning procedures for products and processes, which are very similar are do not need to be individually
validated. Representative of similar range can be selected to justify the validation programme, which
A single validation study under consideration of the “worst case” can be carried out on the basis of the
maximum strength, potency, solubility and LD50. The cleaning validation can be evaluated,
This “worst case” term can also be referred as “bracketing”. And such approach is called as matrix approach.
Three cleaning validations exercise shall be performed and shown to be successful in order to prove that
The documentation of cleaning validation shall include validation protocol, cleaning procedures,
sampling plans, surface area calculations, testing procedures and executed record of the cleaning event, a
record of the sampling and testing events and a validation report which contains clear conclusions against
Do Not Sell My Personal Information
acceptance criteria.
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
you consent to the use of ALL the cookies.
This validation shall covers sanitation, microbiology as well as removal of external agents like detergents,
using sampling techniques capable of detecting and measuring to very low levels wherever applicable.
There are two criteria’s for the cleaning validation, one is dose criteria and second is 10 PPM criteria.
Validated analytical methods used for cleaning validation shall have sensitivity to detect residues or
contaminant of previous product . The detection limit for each analytical method should be sufficiently
1. The product contact surface area for each equipment shall be calculated by theoretically breaking down the
equipment in to basic geometric shapes [cylindrical, cubical, cone, rectangle etc.] and then apply to relevant
area calculation formulae.
2. Amount of contaminant, mix from previous product to next product, depend on the common surface area of
Responsibility:
Quality Assurance:
Production:
1. Utilities Validation:
1.Do
HVAC system
Not Sell My Personal Information
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
2.you
Water system
consent to the use of ALL the cookies.
3.Cookie
Pure settings
steam generator
ACCEPT
https://pharmaguidances.com/validation-master-plan/ 26/37
8/24/2020 VALIDATION MASTER PLAN
1. HVAC system:-
Air Handling Unit system, ventilation system, and evaporating system are the part of HVAC system which is
Total ____ number of independent air handling units, _____ number of ventilation systems with supply and
exhaust duct have been provided in the facility. Each critical operational area has a dedicated air-handling
unit (AHU) and has temperature and humidity controls. Each room is provided with terminally filtered air, as
per the requirement of operation, to be carried out in the room. Total ___ number of evaporating units in
The core corridors are provided with controlled environment. Pressure balancing of each room has been
done to avoid any cross contamination, by any ingress of air / drug product from adjacent areas.
There is provision to automatically control and record temperature and percentage relative humidity &
monitor and record the pressure differential across Rooms, by means of a computer interface.
This system is qualified initially, monitored at regular intervals and revalidated once in a year in oral dosage
form area.
Initially Temperature control test, Humidity control test, Air velocity & number of air changes test, Differential
Pressure Control test, Air borne Particle Count test, Microbial count test, Air flow direction test shall be
Limits for each test shall mentioned in the validation protocol as acceptance criteria.
2. Water system:-
Water system is one of the utility which have directly or indirectly impact on products. There are mainly
New water system shall be established and use for regular purpose after one year validation study includes
For qualifying the DM water system & purified water system, Chemical and Microbiological Test shall be
Temperature, PH, Conductivity, Colour, Total hardness, Total dissolved solids, Turbidity, Alkalinity and
presence of ions or minerals, Microbial counts, pyrogens and endotoxins. Test method for each tests shall
Location of sampling points shall be done as per specified in Validation protocol or as per SOP.
Frequency for all above mentioned tests shall be mentioned in the individual validation protocol.
Validation of water system shall divide in to three different phases as follows. Frequency of sampling,
number of samples taken and no. of sampling locations are reduces from phase I level to next phase
level.
Phase – I –
Phase – II –
Phase – III –
1. Raw water circulation and its storage shall be requalified if microbial load is if,more than 500 CFU / ml and
2. Demineralised water circulation and its storage shall be qualified if microbial load is if, more than 100 CFU /
3. Purified water circulation and its storage shall be qualified if microbial load is if,more than 10 CFU / ml and
4. For acceptance criteria of chemical and microbiological tests of purified water,USP – 41 [NF – 36] shall be
refer.
system.
Cookie It shall
settings be periodically
ACCEPT revalidate or verified once in a year on the basis of monthly, weekly or daily
https://pharmaguidances.com/validation-master-plan/ 28/37
8/24/2020 VALIDATION MASTER PLAN
Pure steam is one of the utility which have directly or indirectly impact on the quality of the product.
Conductivity, PH, Total organic carbon, Bacterial endotoxin and Microbial count test of pure steam
Sampling locations of pure steam shall be carried out from pure steam generator as per specified in the
validation protocol.
Data of chemical and microbiological analysis of all months shall be reviewed and trend shall be prepared
for year.
Based on the trend data of the year summary report shall be prepared and shall be approved at unit levels.
Limits or Acceptance criteria for each tests shall defined in the validation protocol.
Pure steam generator shall be revalidate if there is any major change, replacement or modification in
existing system. It shall be periodically revalidate or verified once in a year on the basis of monthly, weekly
Compressed air system is one of the utility which have directly or indirectly impact on the quality of the
product.
Sampling locations shall be mentioned in the validation protocol. Sampling method of Compressed Air shall
Following test shall conduct to qualify compressed air system. Limits or Acceptance criteria for each tests
5. Particulate matter such as fibres and metal particles should be NMT 100 particles of 0.5 mper cubic feet of
air.
Frequency of different tests of different frequency should be specify in to the validation protocol.
Data of chemical and microbiological analysis collected monthly or quarterly shall be reviewed and trend
Based on the trend data of the year summary report shall be prepared and shall be approved at unit levels.
Compressed Air System shall be revalidate if there is any major change, replacement or modification in
existing system. It shall be periodically revalidate or verified once in a year on the basis of monthly and
Note: During validation program of above described utilities some tests were conducted by external party and
10.1 The specific acceptance criteria for the experimentation results, during validation, shall be defined in
detail in the respective validation protocol. Recognised national or international standards shall be cited for
reference.
11.1 Risk: It is defined as the combination of like hood and consequences of specified hazardous event
Do Not Sell My Personal Information
occurring.
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
you consent to the use of ALL the cookies.
11.2 Hazards: It is defined as the source or situation with potential for harm in terms human injury or ill health,
11.3 Any aspect of the operation that can affect the quality attributes i.e. Identity, purity,strength, safety of the
product directly or indirectly, obviously that can affect the health of customer, that’s why, assessment of
11.4 This shall be based on the comprehensive understanding of the product, process,system and
components. Where possible this assessment of impact shall be defined in the user requirement specification
New project
Impact assessment : The risk is identified and categorized in to impact and no impact.
impact system
qualification.
11.8 Risk categorization, validation priorities, schedule preparation, depth of validation including timelines
shall be determined by the functional team members from the production, QA, QC and Engineering.
11.9 When a new product is introduced in to the existing system, the risk is assessed by using matrix vs.
does form which is evaluated in the product development plan for the process validation and cleaning
validation.
11.10 Impact assessment: The applicability of any thing of the following criteria was taken as an indication
that the system has direct impact or indirect impact on the product. Systems such provides Utility which has
direct contact with the product are compressed air, purified water, Pure stem and HVAC system
Area — Y — —
HVAC System Y — —
Compressed air Y — —
Potable water N Y —
Pure steam Y Y —
available at individual
Cookie settings ACCEPT site.
https://pharmaguidances.com/validation-master-plan/ 32/37
8/24/2020 VALIDATION MASTER PLAN
Any changes or modifications to the validation protocol, test reporting formats and other related documents
must be approved by the validation team prior to becoming effective through a ‘Change Control’ system.
approved by following ‘Change control system’. A supplement to be attached to the revised protocol to reflect
the approved changes as it may be deleted part or additional part in the validation protocol.
14.1 The Validation for equipment, instruments, systems and processes which requires to be periodically
revalidated at defined frequency as per individual validation protocol within ± 1 month of the due date.
16.0 GLOSSARY
1. Acceptance criteria:
The product, equipment, and /or process specifications and limits, such as acceptable quality level and
unacceptable quality level, that is necessary for making a decision to accept or reject.
Calibration:
2.Do Not Sell My Personal Information
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
you consent to the use of ALL the cookies.
Demonstrating that a measuring device produces results within specified limits of those produced by a
Cookie settings ACCEPT
reference standard device over an appropriate range of measurements. This process results in corrections
https://pharmaguidances.com/validation-master-plan/ 33/37
8/24/2020 VALIDATION MASTER PLAN
3. Change control:
A formal system by which qualified representatives of appropriate discipline reviewed proposed or actual
changes that might affect a validated status. The intent is to determine the need for action that would ensure
4. Certi cation:
revalidation has been performed appropriately and that the results are acceptable.
A study that serves to measure variables or parameters , critical to the satisfactory operation of a piece of
equipment or plant and to assure their operation within monitored and controlled limits. Examples of variables
6. Limit of detection:
The lowest amount of analyse in a sample which can be detected but not quantitiated as an exact value. The
7. Limit of Quantitation:
The lowest amount of analyse in a sample which can be quantitatively determined with defined precision and
accuracy under the stated experimental condition. The limit of detection is mostly a parameter of the limit
test.
8. Inspection:
Documented verification that all key aspects of the installation adhere to appropriate codes and approved
Do Not Sell My Personal Information
design intentions and that manufacturer’s recommendations are suitably considered.
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
you consent to the use of ALL the cookies.
Documented verification that the system or subsystem performs as intended throughout all anticipated
operating ranges.
Documented verification that the equipment performs as intended for the process,as specified by operating
ranges .
To optimise the process for maximum efficiency while maintaining quality standards.
Establishing documented evidence that a process does what it purports to do. It is an documented verification
that the integrated system functions as intended in its normal operating environment. The term performance
The criteria assigned before undertaking testing to allow evaluation of test results to demonstrates
15. Protocol:
A document that gives a direction or guideline for any process as what , where, when, who, why and how to
do.
All values of a given control parameter that fall between proven high and low worst case conditions.
The performance of tests to determine if a component of a manufacturing process possesses the attributes
Quality
18.Do assurance:
Not Sell My Personal Information
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
you consent to the use of ALL the cookies.
The activity of providing , to all concerned , the evidence needed to establish confidence that the quality
Cookie settings ACCEPT
function is being performed adequately .
https://pharmaguidances.com/validation-master-plan/ 35/37
8/24/2020 VALIDATION MASTER PLAN
The regulatory process through which industry measures actual quality performance , compares it with
The entire collection of activities from which industry achieves fitness for use, no matter where these activities
are performed .
21. Revalidation:
Repetition for verification of the validation and qualification process or a specific portion of it.
A condition in which all operating variables that can affect performance remain within such ranges that the
A formal monitoring system by which qualified representatives of appropriate disciplines review proposed or
actual changes that might affect validated status and cause corrective action to be taken that will ensure that
A scientific report of the results derived from executing a validation protocol A brief summary of
conclusions from a specific task conclusions report, usually indicating validation success and designating
proven acceptable ranges that have resulted. The conclusions are formally approved .
A document providing information on the company’s validation activities. It should be define details of and
time scales for the validation works to be performed. Responsibilities relating to the plan should be stated.
Do Not Sell My Personal Information
27.We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
Worst case:
you consent to the use of ALL the cookies.
A condition or set of conditions encompassing upper and lower processing limits and circumstances within
standard operating procedure, which pose the greatest chance of product or process failure when compared
to ideal conditions. Such conditions do not necessarily induce product or process failure.
Part of an equipment which can affect the quality of product directly is known as critical part.
Pharmaceutical Guidanace
Mr. Shiv Kumar is the Author and founder of pharmaceutical guidance, he is a pharmaceutical Professional from India having more than 14 years of
rich experience in pharmaceutical field.
During his career, he work in quality assurance department with multinational company’s i.e Zydus Cadila Ltd, Unichem Laboratories Ltd, Indoco
remedies Ltd, Panacea Biotec Ltd, Nectar life Science Ltd. During his experience, he face may regulatory Audit i.e. USFDA, MHRA, ANVISA, MCC,
TGA, EU –GMP, WHO –Geneva, ISO 9001-2008 and many ROW Regularities Audit i.e.Uganda,Kenya, Tanzania, Zimbabwe. He is currently leading
a regulatory pharmaceutical company as a head Quality. You can join him by Email, Facebook, Google+, Twitter and YouTube