The document is an RFI summary sheet from a construction project to develop a section of NH-31 highway in West Bengal, India. It contains 16 RFI entries related to structural works like retaining walls, bridges, and drainage structures as well as highway works like embankment compaction testing, sub-base and base course laying. The RFIs are requesting inspection for tasks like concrete pouring, reinforcement installation, and layer compaction between September 1-2, 2020 for works between chainages 551-563 km.

Uploaded by

tanveer
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
68 views1 page

Drain Drain Drain Drain Retaining Wall

The document is an RFI summary sheet from a construction project to develop a section of NH-31 highway in West Bengal, India. It contains 16 RFI entries related to structural works like retaining walls, bridges, and drainage structures as well as highway works like embankment compaction testing, sub-base and base course laying. The RFIs are requesting inspection for tasks like concrete pouring, reinforcement installation, and layer compaction between September 1-2, 2020 for works between chainages 551-563 km.

Uploaded by

tanveer
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

RFI SUMMARY SHEET

Name of the Project :- Development of NH-31 to 4 lane configuration from km 551.360 to km 563.260 (Ghoshpukur to Bihar More, Bagdogra) in Darjeeling District,West Bengal under EPC Mode''
RFI SUMMARY DATE :
Submission Chainage Chainage Proposed Proposed
Sl No. RFI No. Side Description of Work Submitted By Status
Date (Km) (Km) Inspection Inspection
Reinforcement and shuttering checking
9151 TIPPLGRDJV/NH-31/STR/ 9187 1-Sep-20 561+240 561+260 20.00 LHS STRUCTURE DRAIN Reinf. Of wall MR. ARINDAM SINHA 2-Sep-20 10:00
of Wall of side Drain
9152 TIPPLGRDJV/NH-31/STR/ 9188 1-Sep-20 561+240 561+260 20.00 LHS Concreting of Wall of Side Drain STRUCTURE DRAIN Concreting of wall MR. ARINDAM SINHA 2-Sep-20 10:00
Reinforcement and shuttering checking
9153 TIPPLGRDJV/NH-31/STR/ 9189 1-Sep-20 561+340 561+370 30.00 LHS STRUCTURE DRAIN Reinf. Of wall MR. ARINDAM SINHA 2-Sep-20 10:00
of Wall of side Drain
9154 TIPPLGRDJV/NH-31/STR/ 9190 1-Sep-20 561+340 561+370 30.00 LHS Concreting of Wall of Side Drain STRUCTURE DRAIN Concreting of wall MR. ARINDAM SINHA 2-Sep-20 10:00

Reinforcement and shuttering checking


9155 TIPPLGRDJV/NH-31/STR/ 9191 1-Sep-20 559+949 559+959 10.00 RHS STRUCTURE RETAINING WALL Reinf. Of ret wall 3rd lift MR. ARINDAM SINHA 2-Sep-20 10:00
ofwall 3rd lift of retaining wall

Concreting of ret. Wall


9156 TIPPLGRDJV/NH-31/STR/ 9192 1-Sep-20 559+949 559+959 10.00 RHS Concreting of retaining wall 3rd lift STRUCTURE RETAINING WALL MR. ARINDAM SINHA 2-Sep-20 10:00
3rd lift
Shuttering Checking of Leveling Pad of
9157 TIPPLGRDJV/NH-31/STR/ 9193 1-Sep-20 554+070 554+117 46.87 LHS STRUCTURE RE WALL Shuttering checking MR. ARINDAM SINHA 2-Sep-20 10:00
RE Wall Towards Bihar More End.

Concreting of Leveling Pad of RE Wall Concreting of Leveling


9158 TIPPLGRDJV/NH-31/STR/ 9194 1-Sep-20 554+070 554+117 46.87 LHS STRUCTURE RE WALL MR. ARINDAM SINHA 2-Sep-20 10:00
Towards Bihar More end pad
Concreting of PSC Girder-2 of MCW Concreting Of PSC
9158 TIPPLGRDJV/NH-31/STR/ 9195 1-Sep-20 553+850 MCW LHS STRUCTURE MINOR BRIDGE MR. ARINDAM SINHA 2-Sep-20 10:00
Bridge. Girder-2
Girder Launching and Bearing Fixing
9158 TIPPLGRDJV/NH-31/STR/ 9196 1-Sep-20 559+982 MCW RHS STRUCTURE MINOR BRIDGE Launching Girder-1 MR. ARINDAM SINHA 2-Sep-20 10:00
of Girder No.-1
9159 TIPPLGRDJV/NH-31/HW/ 9197 1-Sep-20 553+720 553+810 90.00 RHS GSB Laying HIGHWAY GSB GSB Laying Mr. Manik Shaikh 2-Sep-20 10:00

FDD testing and level checking GSB


9160 TIPPLGRDJV/NH-31/HW/ 9198 1-Sep-20 553+720 553+810 90.00 RHS HIGHWAY GSB GSB Top Mr. Manik Shaikh 2-Sep-20 10:00
top Layer of Main Carriageway

9161 TIPPLGRDJV/NH-31/HW/ 9199 1-Sep-20 553+681 553+681 0.60 RHS Filter Media 20th Layer HIGHWAY SERVICE ROAD 20th Layer Mr. Manik Shaikh 2-Sep-20 10:00
WMM 2nd Layer Laying of Service
9162 TIPPLGRDJV/NH-31/HW/ 9200 1-Sep-20 553+670 553+681 10.60 RHS HIGHWAY SERVICE ROAD Laying 2nd Mr. Manik Shaikh 2-Sep-20 10:00
Road
FDD testing and level checking of
9163 TIPPLGRDJV/NH-31/HW/ 9201 1-Sep-20 553+670 553+681 10.60 RHS WMM top Layer of Service Road HIGHWAY SERVICE ROAD WMM Top Mr. Manik Shaikh 2-Sep-20 10:00
Bridge
FDD Testing on Embankment 13th
9164 TIPPLGRDJV/NH-31/HW/ 9202 1-Sep-20 553+870 554+000 130.00 LHS HIGHWAY SERVICE ROAD EMB 13th Mr. Manik Shaikh 2-Sep-20 10:00
Layer
FDD Testing on Embankment 13th
9165 TIPPLGRDJV/NH-31/HW/ 9203 1-Sep-20 559+950 559+970 20.00 LHS HIGHWAY EMBANKMENT EMB 13th Mr. Manik Shaikh 2-Sep-20 10:00
Layer
FDD Testing on Embankment 13th
9166 TIPPLGRDJV/NH-31/HW/ 9204 1-Sep-20 560+000 560+050 50.00 LHS HIGHWAY EMBANKMENT EMB 13th Mr. Manik Shaikh 2-Sep-20 10:00
Layer
FDD Testing on Embankment 13th
9167 TIPPLGRDJV/NH-31/HW/ 9205 1-Sep-20 560+000 560+050 50.00 RHS HIGHWAY EMBANKMENT EMB 13th Mr. Manik Shaikh 2-Sep-20 10:00
Layer
9168 TIPPLGRDJV/NH-31/HW/ 9206 1-Sep-20 562+340 562+360 20.00 LHS FDDTesting on Subgrade 1st Layer HIGHWAY SERVICE ROAD SG 1st Mr. Manik Shaikh 2-Sep-20 10:00
9169 TIPPLGRDJV/NH-31/HW/ 9207 1-Sep-20 562+320 562+550 230.00 LHS Median kerb Laying HIGHWAY MEDIAN Kerb Laying Mr. Manik Shaikh 2-Sep-20 10:00