0% found this document useful (0 votes)
282 views1 page

Internal Surprise Safety Audit Report of

This is an internal safety audit report of an unnamed cost center. It lists several unsafe conditions observed with recommended corrective actions and target completion dates for the auditee to address. Signatures were provided by the auditee, auditor and project manager with rectification confirmation and date.

Uploaded by

Vikas Yamagar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
282 views1 page

Internal Surprise Safety Audit Report of

This is an internal safety audit report of an unnamed cost center. It lists several unsafe conditions observed with recommended corrective actions and target completion dates for the auditee to address. Signatures were provided by the auditee, auditor and project manager with rectification confirmation and date.

Uploaded by

Vikas Yamagar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

INTERNAL SURPRISE SAFETY AUDIT REPORT OF

Date:-
Cost Centre:- Auditee:- Auditor:-

Target date
Recommended Corrective action by
SI No. Unsafe Condition Observed the Auditee of Verification of corrective action Remarks
completion

Signature:-
Auditee:- Auditor:- P.M:-

Date:- Date:- Date:-


Rectification done on:-

You might also like