Dimensional Report

The document contains 4 dimensional reports measuring the actual dimensions of structural steel components for a warehouse renovation project against the design specifications. Each report finds the majority of measurements are within the allowed +/- 2mm tolerance, with some exceeding tolerance. An engineering company approved the acceptable measurements for the contractor.

Uploaded by

Sucipto Rahmat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
98 views13 pages

Dimensional Report

The document contains 4 dimensional reports measuring the actual dimensions of structural steel components for a warehouse renovation project against the design specifications. Each report finds the majority of measurements are within the allowed +/- 2mm tolerance, with some exceeding tolerance. An engineering company approved the acceptable measurements for the contractor.

Uploaded by

Sucipto Rahmat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 13

DIMENSIONAL REPORT

Project : RENOVASI WAREHOUSE Report No : DR/PIE/2020/001 Page No : 01 of 01


Owner : PT. PUPUK INDONESIA ENERGI Work Name : Pekerjaan Struktur Baja
Kontraktor : PT.DRAJAD ALAM RAYA SEMESTA Job Order No : 5900000234
Used Of Measurment : : mm Measurment Tool : Meteran & Roll meter

Drawing No : PIE-01-A1-001-DARS
Note : Actual Dimensional ( see attachment )
Tolerance ± 2 mm

MEASURED DIMENSION MEASURED DIMENSION


No REMARK No REMARK
MARK DESIGN ACTUAL DEV MARK DESIGN ACTUAL DEV
1 A 510 510 0 11 K 140 142 +2
2 B 350 349 -1 12 L 5362 5361 -1
3 C 210 211 +1 13 M 328 327 -1
4 D 55 55 0 14 N 1334.5 1335.5 +1
5 E 100 100 0 15 O 1334.5 1334.5 0
6 F 5 4 -1 16 P 1334.5 1333.5 -1
7 G 70 69 -1 17 Q 1334.5 1335.5 +1
8 H 70 70 0 18 R 145 146 +1
9 I 70 71 +1 19 S 250 250 0
10 J 70 70 0 20 T 250 249 -1

Judgement : Acceptable Un-Acceptable

Prepared By Approved by
PT.Drajad Alam Raya Semesta PT. Pupuk Indonesia Energi

Date : Date :
DIMENSIONAL REPORT
Project : RENOVASI WAREHOUSE Report No : DR/PIE/2020/002 Page No : 01 of 01
Owner : PT. PUPUK INDONESIA ENERGI Work Name : Pekerjaan Struktur Baja
Kontraktor : PT.DRAJAD ALAM RAYA SEMESTA Job Order No : 5900000234
Used Of Measurment : : mm Measurment Tool : Meteran & Roll meter

Drawing No : PIE-01-A1-001-DARS
Note : Actual Dimensional ( see attachment )
Tolerance ± 2 mm

MEASURED DIMENSION MEASURED DIMENSION


No REMARK No REMARK
MARK DESIGN ACTUAL DEV MARK DESIGN ACTUAL DEV
1 A 510 509 -1 11 K 140 140 0
2 B 350 351 +1 12 L 5362 5361 -1
3 C 210 210 0 13 M 328 328 0
4 D 55 55 0 14 N 1334.5 1333.5 -1
5 E 100 99 -1 15 O 1334.5 1334.5 0
6 F 5 6 +1 16 P 1334.5 1334.5 0
7 G 70 70 0 17 Q 1334.5 1334.5 0
8 H 70 69 -1 18 R 145 146 +1
9 I 70 69 -1 19 S 250 249 -1
10 J 70 71 +1 20 T 250 250 0

Judgement : Acceptable Un-Acceptable

Prepared By Approved by
PT.Drajad Alam Raya Semesta PT. Pupuk Indonesia Energi

Date : Date :
DIMENSIONAL REPORT
Project : RENOVASI WAREHOUSE Report No : DR/PIE/2020/003 Page No : 01 of 01
Owner : PT. PUPUK INDONESIA ENERGI Work Name : Pekerjaan Struktur Baja
Kontraktor : PT.DRAJAD ALAM RAYA SEMESTA Job Order No : 5900000234
Used Of Measurment : : mm Measurment Tool : Meteran & Roll meter

Drawing No : PIE-01-A1-001-DARS
Note : Actual Dimensional ( see attachment )
Tolerance ± 2 mm

MEASURED DIMENSION MEASURED DIMENSION


No REMARK No REMARK
MARK DESIGN ACTUAL DEV MARK DESIGN ACTUAL DEV
1 A 3575 3575 0 10 J 360 359 -1
2 B 145 144 -1 11 K 70 70 0
3 C 200 201 +1 12 L 70 70 0
4 D 200 202 +2 13 M 70 70 0
5 E 145 145 0 14 N 70 70 0
6 F 360 359 -1 15 O 55 54 -1
7 G 350 350 0 16 P 100 101 +1
8 H 210 210 0 17 Q 55 54 -1
9 I 175 176 +1 18 R 325 324 -1
19 S 80 80 0

Judgement : Acceptable Un-Acceptable

Prepared By Approved by
PT.Drajad Alam Raya Semesta PT. Pupuk Indonesia Energi

Date : Date :
DIMENSIONAL REPORT
Project : RENOVASI WAREHOUSE Report No : DR/PIE/2020/004 Page No : 01 of 01
Owner : PT. PUPUK INDONESIA ENERGI Work Name : Pekerjaan Struktur Baja
Kontraktor : PT.DRAJAD ALAM RAYA SEMESTA Job Order No : 5900000234
Used Of Measurment : : mm Measurment Tool : Meteran & Roll meter

Drawing No : PIE-01-A1-001-DARS
Note : Actual Dimensional ( see attachment )
Tolerance ± 2 mm

MEASURED DIMENSION MEASURED DIMENSION


No REMARK No REMARK
MARK DESIGN ACTUAL DEV MARK DESIGN ACTUAL DEV
1 A 3575 3576 +1 10 J 360 360 0
2 B 145 145 0 11 K 70 69 -1
3 C 200 201 +1 12 L 70 71 +1
4 D 200 202 +2 13 M 70 71 +1
5 E 145 144 -1 14 N 70 70 0
6 F 360 361 +1 15 O 55 54 -1
7 G 350 349 -1 16 P 100 100 0
8 H 210 210 0 17 Q 55 56 +1
9 I 175 175 0 18 R 325 324 -1
19 S 80 79 -1

Judgement : Acceptable Un-Acceptable

Prepared By Approved by
PT.Drajad Alam Raya Semesta PT. Pupuk Indonesia Energi

Date : Date :
DIMENSIONAL REPORT
Project : RENOVASI WAREHOUSE Report No : DR/PIE/2020/005 Page No : 01 of 01
Owner : PT. PUPUK INDONESIA ENERGI Work Name : Pekerjaan Struktur Baja
Kontraktor : PT.DRAJAD ALAM RAYA SEMESTA Job Order No : 5900000234
Used Of Measurment : : mm Measurment Tool : Meteran & Roll meter

Drawing No : PIE-01-A1-001-DARS
Note : Actual Dimensional ( see attachment )
Tolerance ± 2 mm

MEASURED DIMENSION MEASURED DIMENSION


No REMARK No REMARK
MARK DESIGN ACTUAL DEV MARK DESIGN ACTUAL DEV
1 A 3575 3575 0 10 J 360 359 -1
2 B 145 144 -1 11 K 70 71 +1
3 C 200 201 +1 12 L 70 70 0
4 D 200 199 -1 13 M 70 71 +1
5 E 145 146 +1 14 N 70 69 -1
6 F 360 361 +1 15 O 55 54 -1
7 G 350 349 -1 16 P 100 101 +1
8 H 210 210 0 17 Q 55 55 0
9 I 175 174 -1 18 R 325 324 -1
19 S 80 80 0

Judgement : Acceptable Un-Acceptable

Prepared By Approved by
PT.Drajad Alam Raya Semesta PT. Pupuk Indonesia Energi

Date : Date :
DIMENSIONAL REPORT
Project : RENOVASI WAREHOUSE Report No : DR/PIE/2020/006 Page No : 01 of 01
Owner : PT. PUPUK INDONESIA ENERGI Work Name : Pekerjaan Struktur Baja
Kontraktor : PT.DRAJAD ALAM RAYA SEMESTA Job Order No : 5900000234
Used Of Measurment : : mm Measurment Tool : Meteran & Roll meter

Drawing No : PIE-01-A1-001-DARS
Note : Actual Dimensional ( see attachment )
Tolerance ± 2 mm

MEASURED DIMENSION MEASURED DIMENSION


No REMARK No REMARK
MARK DESIGN ACTUAL DEV MARK DESIGN ACTUAL DEV
1 A 125 124 -1 16 P 60 60 0
2 B 70 69 -1 17 Q 80 81 +1
3 C 55 55 0 18 R 50 50 0
4 D 175 173 -2 19 S 1110 1111 +1
5 E 27.5 27.5 0 20 T 125 125 0
6 F 60 62 +2 21 U 60 60 0
7 G 60 61 +1 22 V 80 81 +1
8 H 27.5 29.5 +2 23 W 60 60 0
9 I 87.5 87.5 0 24 X 15 15 0
10 J 325 326 +1 25 Y 30 31 +1
11 K 125 125 0 26 Z 60 60 0
12 L 30 31 +1 27 A1 40 41 +1
13 M 35 35 0 28 B1 60 60 0
14 N 60 58 -2 29 C1 60 60 0
15 O 190 190 0 30 D1 40 41 +1

Judgement : Acceptable Un-Acceptable

Prepared By Approved by
PT.Drajad Alam Raya Semesta PT. Pupuk Indonesia Energi

Date : Date :
DIMENSIONAL REPORT
Project : RENOVASI WAREHOUSE Report No : DR/PIE/2020/007 Page No : 01 of 01
Owner : PT. PUPUK INDONESIA ENERGI Work Name : Pekerjaan Struktur Baja
Kontraktor : PT.DRAJAD ALAM RAYA SEMESTA Job Order No : 5900000234
Used Of Measurment : : mm Measurment Tool : Meteran & Roll meter

Drawing No : PIE-01-A1-001-DARS
Note : Actual Dimensional ( see attachment )
Tolerance ± 2 mm

MEASURED DIMENSION MEASURED DIMENSION


No REMARK No REMARK
MARK DESIGN ACTUAL DEV MARK DESIGN ACTUAL DEV
1 A 125 125 0 16 P 60 59 -1
2 B 70 69 -1 17 Q 80 81 +1
3 C 55 55 0 18 R 50 50 0
4 D 175 177 +2 19 S 1110 1109 -1
5 E 27.5 27.5 0 20 T 125 125 0
6 F 60 62 +2 21 U 60 58 -2
7 G 60 61 +1 22 V 80 81 +1
8 H 27.5 29.5 +2 23 W 60 60 0
9 I 87.5 87.5 0 24 X 15 14 -1
10 J 325 325 0 25 Y 30 31 +1
11 K 125 126 +1 26 Z 60 60 0
12 L 30 31 +1 27 A1 40 41 +1
13 M 35 35 0 28 B1 60 60 0
14 N 60 62 +2 29 C1 60 59 -1
15 O 190 192 +2 30 D1 40 40 0

Judgement : Acceptable Un-Acceptable

Prepared By Approved by
PT.Drajad Alam Raya Semesta PT. Pupuk Indonesia Energi

Date : Date :
DIMENSIONAL REPORT
Project : RENOVASI WAREHOUSE Report No : DR/PIE/2020/008 Page No : 01 of 01
Owner : PT. PUPUK INDONESIA ENERGI Work Name : Pekerjaan Struktur Baja
Kontraktor : PT.DRAJAD ALAM RAYA SEMESTA Job Order No : 5900000234
Used Of Measurment : : mm Measurment Tool : Meteran & Roll meter

Drawing No : PIE-01-A1-001-DARS
Note : Actual Dimensional ( see attachment )
Tolerance ± 2 mm

MEASURED DIMENSION MEASURED DIMENSION


No REMARK No REMARK
MARK DESIGN ACTUAL DEV MARK DESIGN ACTUAL DEV
1 A 125 124 -1 16 P 60 59 -1
2 B 70 70 0 17 Q 80 81 +1
3 C 55 55 0 18 R 50 50 0
4 D 175 175 0 19 S 1110 1112 +2
5 E 27.5 27.5 0 20 T 125 125 0
6 F 60 59 -1 21 U 60 60 0
7 G 60 61 +1 22 V 80 80 0
8 H 27.5 28.5 +1 23 W 60 59 -1
9 I 87.5 86.5 -1 24 X 15 15 0
10 J 325 325 0 25 Y 30 31 +1
11 K 125 124 -1 26 Z 60 58 -2
12 L 30 31 +1 27 A1 40 39 -1
13 M 35 35 0 28 B1 60 60 0
14 N 60 60 0 29 C1 60 60 0
15 O 190 189 -1 30 D1 40 39 -1

Judgement : Acceptable Un-Acceptable

Prepared By Approved by
PT.Drajad Alam Raya Semesta PT. Pupuk Indonesia Energi

Date : Date :
DIMENSIONAL REPORT
Project : RENOVASI WAREHOUSE Report No : DR/PIE/2020/009 Page No : 01 of 01
Owner : PT. PUPUK INDONESIA ENERGI Work Name : Pekerjaan Struktur Baja
Kontraktor : PT.DRAJAD ALAM RAYA SEMESTA Job Order No : 5900000234
Used Of Measurment : : mm Measurment Tool : Meteran & Roll meter

Drawing No : PIE-01-A1-001-DARS
Note : Actual Dimensional ( see attachment )
Tolerance ± 2 mm

MEASURED DIMENSION MEASURED DIMENSION


No REMARK No REMARK
MARK DESIGN ACTUAL DEV MARK DESIGN ACTUAL DEV
1 A 125 124 -1 16 P 60 60 0
2 B 70 70 0 17 Q 80 81 +1
3 C 55 55 0 18 R 50 49 -1
4 D 175 174 -1 19 S 1110 1112 +2
5 E 27.5 28.5 +1 20 T 125 125 0
6 F 60 60 0 21 U 60 59 -1
7 G 60 61 +1 22 V 80 80 0
8 H 27.5 27.5 0 23 W 60 60 0
9 I 87.5 86.5 -1 24 X 15 15 0
10 J 325 324 -1 25 Y 30 31 +1
11 K 125 126 1 26 Z 60 60 0
12 L 30 31 +1 27 A1 40 39 -1
13 M 35 35 0 28 B1 60 60 0
14 N 60 59 -1 29 C1 60 60 0
15 O 190 190 0 30 D1 40 41 +1

Judgement : Acceptable Un-Acceptable

Prepared By Approved by
PT.Drajad Alam Raya Semesta PT. Pupuk Indonesia Energi

Date : Date :
DIMENSIONAL REPORT
Project : RENOVASI WAREHOUSE Report No : DR/PIE/2020/010 Page No : 01 of 01
Owner : PT. PUPUK INDONESIA ENERGI Work Name : Pekerjaan Struktur Baja
Kontraktor : PT.DRAJAD ALAM RAYA SEMESTA Job Order No : 5900000234
Used Of Measurment : : mm Measurment Tool : Meteran & Roll meter

Drawing No : PIE-01-A1-001-DARS
Note : Actual Dimensional ( see attachment )
Tolerance ± 2 mm

MEASURED DIMENSION MEASURED DIMENSION


No REMARK No REMARK
MARK DESIGN ACTUAL DEV MARK DESIGN ACTUAL DEV
1 A 125 125 0 16 P 60 59 -1
2 B 70 69 -1 17 Q 80 81 +1
3 C 55 55 0 18 R 50 50 0
4 D 175 176 +1 19 S 1110 1111 +1
5 E 27.5 27.5 0 20 T 125 125 0
6 F 60 62 +2 21 U 60 62 +2
7 G 60 61 +1 22 V 80 81 +1
8 H 27.5 29.5 +2 23 W 60 60 0
9 I 87.5 87.5 0 24 X 15 17 +2
10 J 325 326 +1 25 Y 30 31 +1
11 K 125 125 0 26 Z 60 60 0
12 L 30 31 +1 27 A1 40 41 +1
13 M 35 35 0 28 B1 60 60 0
14 N 60 58 -2 29 C1 60 62 +2
15 O 190 190 0 30 D1 40 41 +1

Judgement : Acceptable Un-Acceptable

Prepared By Approved by
PT.Drajad Alam Raya Semesta PT. Pupuk Indonesia Energi

Date : Date :
DIMENSIONAL REPORT
Project : RENOVASI WAREHOUSE Report No : DR/PIE/2020/011 Page No : 01 of 01
Owner : PT. PUPUK INDONESIA ENERGI Work Name : Pekerjaan Struktur Baja
Kontraktor : PT.DRAJAD ALAM RAYA SEMESTA Job Order No : 5900000234
Used Of Measurment : : mm Measurment Tool : Meteran & Roll meter

Drawing No : PIE-01-A1-001-DARS
Note : Actual Dimensional ( see attachment )
Tolerance ± 2 mm

MEASURED DIMENSION MEASURED DIMENSION


No REMARK No REMARK
MARK DESIGN ACTUAL DEV MARK DESIGN ACTUAL DEV
1 A 125 125 0 16 P 60 59 -1
2 B 70 72 +2 17 Q 80 81 +1
3 C 55 55 0 18 R 50 50 0
4 D 175 176 +1 19 S 1110 1109 -1
5 E 27.5 27.5 0 20 T 125 124 -1
6 F 60 62 +2 21 U 60 58 -2
7 G 60 61 +1 22 V 80 81 +1
8 H 27.5 29.5 +2 23 W 60 60 0
9 I 87.5 87.5 0 24 X 15 14 -1
10 J 325 324 -1 25 Y 30 30 0
11 K 125 126 +1 26 Z 60 60 0
12 L 30 31 +1 27 A1 40 40 0
13 M 35 35 0 28 B1 60 60 0
14 N 60 59 -1 29 C1 60 59 -1
15 O 190 190 0 30 D1 40 40 0

Judgement : Acceptable Un-Acceptable

Prepared By Approved by
PT.Drajad Alam Raya Semesta PT. Pupuk Indonesia Energi

Date : Date :
DIMENSIONAL REPORT
Project : RENOVASI WAREHOUSE Report No : DR/PIE/2020/012 Page No : 01 of 01
Owner : PT. PUPUK INDONESIA ENERGI Work Name : Pekerjaan Struktur Baja
Kontraktor : PT.DRAJAD ALAM RAYA SEMESTA Job Order No : 5900000234
Used Of Measurment : : mm Measurment Tool : Meteran & Roll meter

Drawing No : PIE-01-A1-001-DARS
Note : Actual Dimensional ( see attachment )
Tolerance ± 2 mm

MEASURED DIMENSION MEASURED DIMENSION


No REMARK No REMARK
MARK DESIGN ACTUAL DEV MARK DESIGN ACTUAL DEV
1 A 125 125 0 16 P 60 60 0
2 B 70 69 -1 17 Q 80 81 +1
3 C 55 54 -1 18 R 50 50 0
4 D 175 176 +1 19 S 1110 1109 -1
5 E 27.5 26.5 -1 20 T 125 125 0
6 F 60 60 0 21 U 60 59 -1
7 G 60 60 0 22 V 80 80 0
8 H 27.5 28.5 +1 23 W 60 61 +1
9 I 87.5 86.5 -1 24 X 15 15 0
10 J 325 324 -1 25 Y 30 29 -1
11 K 125 125 0 26 Z 60 58 -2
12 L 30 31 +1 27 A1 40 39 -1
13 M 35 35 0 28 B1 60 60 0
14 N 60 61 +1 29 C1 60 59 -1
15 O 190 190 0 30 D1 40 39 -1

Judgement : Acceptable Un-Acceptable

Prepared By Approved by
PT.Drajad Alam Raya Semesta PT. Pupuk Indonesia Energi

Date : Date :
DIMENSIONAL REPORT
Project : RENOVASI WAREHOUSE Report No : DR/PIE/2020/013 Page No : 01 of 01
Owner : PT. PUPUK INDONESIA ENERGI Work Name : Pekerjaan Struktur Baja
Kontraktor : PT.DRAJAD ALAM RAYA SEMESTA Job Order No : 5900000234
Used Of Measurment : : mm Measurment Tool : Meteran & Roll meter

Drawing No : PIE-01-A1-001-DARS
Note : Actual Dimensional ( see attachment )
Tolerance ± 2 mm

MEASURED DIMENSION MEASURED DIMENSION


No REMARK No REMARK
MARK DESIGN ACTUAL DEV MARK DESIGN ACTUAL DEV
1 A 125 124 -1 16 P 60 61 +1
2 B 70 70 0 17 Q 80 80 0
3 C 55 56 +1 18 R 50 49 -1
4 D 175 174 -1 19 S 1110 1110 0
5 E 27.5 26.5 -1 20 T 125 125 0
6 F 60 60 0 21 U 60 59 -1
7 G 60 60 0 22 V 80 80 0
8 H 27.5 27.5 0 23 W 60 59 -1
9 I 87.5 87.5 0 24 X 15 15 0
10 J 325 324 -1 25 Y 30 31 +1
11 K 125 126 1 26 Z 60 60 0
12 L 30 31 +1 27 A1 40 39 -1
13 M 35 34 -1 28 B1 60 60 0
14 N 60 61 +1 29 C1 60 59 -1
15 O 190 189 -1 30 D1 40 40 0

Judgement : Acceptable Un-Acceptable

Prepared By Approved by
PT.Drajad Alam Raya Semesta PT. Pupuk Indonesia Energi

Date : Date :