Dimensional Report
Dimensional Report
Drawing No : PIE-01-A1-001-DARS
Note : Actual Dimensional ( see attachment )
Tolerance ± 2 mm
Prepared By Approved by
PT.Drajad Alam Raya Semesta PT. Pupuk Indonesia Energi
Date : Date :
DIMENSIONAL REPORT
Project : RENOVASI WAREHOUSE Report No : DR/PIE/2020/002 Page No : 01 of 01
Owner : PT. PUPUK INDONESIA ENERGI Work Name : Pekerjaan Struktur Baja
Kontraktor : PT.DRAJAD ALAM RAYA SEMESTA Job Order No : 5900000234
Used Of Measurment : : mm Measurment Tool : Meteran & Roll meter
Drawing No : PIE-01-A1-001-DARS
Note : Actual Dimensional ( see attachment )
Tolerance ± 2 mm
Prepared By Approved by
PT.Drajad Alam Raya Semesta PT. Pupuk Indonesia Energi
Date : Date :
DIMENSIONAL REPORT
Project : RENOVASI WAREHOUSE Report No : DR/PIE/2020/003 Page No : 01 of 01
Owner : PT. PUPUK INDONESIA ENERGI Work Name : Pekerjaan Struktur Baja
Kontraktor : PT.DRAJAD ALAM RAYA SEMESTA Job Order No : 5900000234
Used Of Measurment : : mm Measurment Tool : Meteran & Roll meter
Drawing No : PIE-01-A1-001-DARS
Note : Actual Dimensional ( see attachment )
Tolerance ± 2 mm
Prepared By Approved by
PT.Drajad Alam Raya Semesta PT. Pupuk Indonesia Energi
Date : Date :
DIMENSIONAL REPORT
Project : RENOVASI WAREHOUSE Report No : DR/PIE/2020/004 Page No : 01 of 01
Owner : PT. PUPUK INDONESIA ENERGI Work Name : Pekerjaan Struktur Baja
Kontraktor : PT.DRAJAD ALAM RAYA SEMESTA Job Order No : 5900000234
Used Of Measurment : : mm Measurment Tool : Meteran & Roll meter
Drawing No : PIE-01-A1-001-DARS
Note : Actual Dimensional ( see attachment )
Tolerance ± 2 mm
Prepared By Approved by
PT.Drajad Alam Raya Semesta PT. Pupuk Indonesia Energi
Date : Date :
DIMENSIONAL REPORT
Project : RENOVASI WAREHOUSE Report No : DR/PIE/2020/005 Page No : 01 of 01
Owner : PT. PUPUK INDONESIA ENERGI Work Name : Pekerjaan Struktur Baja
Kontraktor : PT.DRAJAD ALAM RAYA SEMESTA Job Order No : 5900000234
Used Of Measurment : : mm Measurment Tool : Meteran & Roll meter
Drawing No : PIE-01-A1-001-DARS
Note : Actual Dimensional ( see attachment )
Tolerance ± 2 mm
Prepared By Approved by
PT.Drajad Alam Raya Semesta PT. Pupuk Indonesia Energi
Date : Date :
DIMENSIONAL REPORT
Project : RENOVASI WAREHOUSE Report No : DR/PIE/2020/006 Page No : 01 of 01
Owner : PT. PUPUK INDONESIA ENERGI Work Name : Pekerjaan Struktur Baja
Kontraktor : PT.DRAJAD ALAM RAYA SEMESTA Job Order No : 5900000234
Used Of Measurment : : mm Measurment Tool : Meteran & Roll meter
Drawing No : PIE-01-A1-001-DARS
Note : Actual Dimensional ( see attachment )
Tolerance ± 2 mm
Prepared By Approved by
PT.Drajad Alam Raya Semesta PT. Pupuk Indonesia Energi
Date : Date :
DIMENSIONAL REPORT
Project : RENOVASI WAREHOUSE Report No : DR/PIE/2020/007 Page No : 01 of 01
Owner : PT. PUPUK INDONESIA ENERGI Work Name : Pekerjaan Struktur Baja
Kontraktor : PT.DRAJAD ALAM RAYA SEMESTA Job Order No : 5900000234
Used Of Measurment : : mm Measurment Tool : Meteran & Roll meter
Drawing No : PIE-01-A1-001-DARS
Note : Actual Dimensional ( see attachment )
Tolerance ± 2 mm
Prepared By Approved by
PT.Drajad Alam Raya Semesta PT. Pupuk Indonesia Energi
Date : Date :
DIMENSIONAL REPORT
Project : RENOVASI WAREHOUSE Report No : DR/PIE/2020/008 Page No : 01 of 01
Owner : PT. PUPUK INDONESIA ENERGI Work Name : Pekerjaan Struktur Baja
Kontraktor : PT.DRAJAD ALAM RAYA SEMESTA Job Order No : 5900000234
Used Of Measurment : : mm Measurment Tool : Meteran & Roll meter
Drawing No : PIE-01-A1-001-DARS
Note : Actual Dimensional ( see attachment )
Tolerance ± 2 mm
Prepared By Approved by
PT.Drajad Alam Raya Semesta PT. Pupuk Indonesia Energi
Date : Date :
DIMENSIONAL REPORT
Project : RENOVASI WAREHOUSE Report No : DR/PIE/2020/009 Page No : 01 of 01
Owner : PT. PUPUK INDONESIA ENERGI Work Name : Pekerjaan Struktur Baja
Kontraktor : PT.DRAJAD ALAM RAYA SEMESTA Job Order No : 5900000234
Used Of Measurment : : mm Measurment Tool : Meteran & Roll meter
Drawing No : PIE-01-A1-001-DARS
Note : Actual Dimensional ( see attachment )
Tolerance ± 2 mm
Prepared By Approved by
PT.Drajad Alam Raya Semesta PT. Pupuk Indonesia Energi
Date : Date :
DIMENSIONAL REPORT
Project : RENOVASI WAREHOUSE Report No : DR/PIE/2020/010 Page No : 01 of 01
Owner : PT. PUPUK INDONESIA ENERGI Work Name : Pekerjaan Struktur Baja
Kontraktor : PT.DRAJAD ALAM RAYA SEMESTA Job Order No : 5900000234
Used Of Measurment : : mm Measurment Tool : Meteran & Roll meter
Drawing No : PIE-01-A1-001-DARS
Note : Actual Dimensional ( see attachment )
Tolerance ± 2 mm
Prepared By Approved by
PT.Drajad Alam Raya Semesta PT. Pupuk Indonesia Energi
Date : Date :
DIMENSIONAL REPORT
Project : RENOVASI WAREHOUSE Report No : DR/PIE/2020/011 Page No : 01 of 01
Owner : PT. PUPUK INDONESIA ENERGI Work Name : Pekerjaan Struktur Baja
Kontraktor : PT.DRAJAD ALAM RAYA SEMESTA Job Order No : 5900000234
Used Of Measurment : : mm Measurment Tool : Meteran & Roll meter
Drawing No : PIE-01-A1-001-DARS
Note : Actual Dimensional ( see attachment )
Tolerance ± 2 mm
Prepared By Approved by
PT.Drajad Alam Raya Semesta PT. Pupuk Indonesia Energi
Date : Date :
DIMENSIONAL REPORT
Project : RENOVASI WAREHOUSE Report No : DR/PIE/2020/012 Page No : 01 of 01
Owner : PT. PUPUK INDONESIA ENERGI Work Name : Pekerjaan Struktur Baja
Kontraktor : PT.DRAJAD ALAM RAYA SEMESTA Job Order No : 5900000234
Used Of Measurment : : mm Measurment Tool : Meteran & Roll meter
Drawing No : PIE-01-A1-001-DARS
Note : Actual Dimensional ( see attachment )
Tolerance ± 2 mm
Prepared By Approved by
PT.Drajad Alam Raya Semesta PT. Pupuk Indonesia Energi
Date : Date :
DIMENSIONAL REPORT
Project : RENOVASI WAREHOUSE Report No : DR/PIE/2020/013 Page No : 01 of 01
Owner : PT. PUPUK INDONESIA ENERGI Work Name : Pekerjaan Struktur Baja
Kontraktor : PT.DRAJAD ALAM RAYA SEMESTA Job Order No : 5900000234
Used Of Measurment : : mm Measurment Tool : Meteran & Roll meter
Drawing No : PIE-01-A1-001-DARS
Note : Actual Dimensional ( see attachment )
Tolerance ± 2 mm
Prepared By Approved by
PT.Drajad Alam Raya Semesta PT. Pupuk Indonesia Energi
Date : Date :