RA7920 Presentation Part 2 Guidelines and Procedures
RA7920 Presentation Part 2 Guidelines and Procedures
PHILIPPINES INC.
• 1.) EACH AND EVERY MEMBERS OF IIEE TO HELP THEIR COMPANY TO COMPLY
WITH SECTION 33.
1/3
2/3
3/3
GUIDELINES AND PROCEDURES OF THE INFORMATION CAMPAIGN OF RA7920 SEC.33
• I. COMPOSITION OF INSPECTION TEAM
• A.) Metro Manila
• Three (3) National Officers and/ or Former National President or any combination thereof.
• Anyone of the team members can be designated as a team leader.
• B) Regions
• The Regional Governor shall act as a team leader with the incumbent Chapter Presidents
• and/ or Immediate Former Chapter Presidents or any combination thereof shall be
• designated members.
• C) Appointment Process
• Regional Governors to submit/recommend to Board of Governors for endorsement to the BEE their identifies
jurisdiction or area of responsibilities and qualified assistance/inspection team. Upon approval of endorsement,
• the BEE shall issue appointment letters to the Regional Assistance/Inspection Team.
• D.) List of Establishment ( Additional Proposed Recommendation By The Committee )
• Identified list of establishments should be attached along with the list of inspection team being
• recommended/submitted by the Regional Governors and copy furnish to the committee for monitoring purpose.
• Note:
• A. The designated inspection team should only expedite their function upon received of the appointment letters.
• B.The Inspection team - has a (1) one year term.
• Source: PRBEE Resolution No. 12 Series of 2000 / BEE Guidelines For IIEE
continue..
• INSPECTION PROCEDURE
• 1.) REQUIRED VISITATION LETTER ( see sample )
• 2.) To wear official IIEE Regional/Chapter uniforms
• 3.) Observe company's rule and regulation.
• 4.) Explain the importance of the law, the procedures for application of electrical compliance
and leave them the copy of Letter from BEE Chairman, 3 Nos of BEE forms ie. BEE-SID-01
• BEE-SID-03 AND BEE- SID 04. ( See sample)
• 5) Fill up the inspection report and let the company's representative to sign it and leave 1 copy
for them. Technical or audit inspection is not required.( Report should be emailed to
[email protected] for monitoring purpose)
• 6) Have a group picture with them for documentation purpose and submit to the committee.
• Note:
Avoid entering or inspecting company's facilities ie. substation, power room etc. as our
main objective is to assist and help them to comply and not to police.
INITIATIVE DRIVE OF IIEE MEMBERS TO HELP THEIR
COMPANY COMPLIED WITH SEC. 33
• 1. Google search of BEE Forms
• A. Type PRC BEE Forms
• B. Click “ Dear Madam/Sir - PRC (Letter from BEE Chairman) see slide 29,30
• with downloadable forms as follows: BEE-SID-01( Checklist ), BEE-SID-03 ( Information
• Sheet ) and BEE-SID-04 ( Affidavit of electrical practitioner) see slide 24,25,26
• C. Review the flow chart of compliance application. see slide 23
• D. Contact the respective chapter president for the issuance of
• chapter's endorsement/recommendation letter.
• 2.) The companys initiative in the application of compliance can go directly to PRC Website or visit
the nearest PRC Regional Offices. (Baguio Ciy, Legaspi City, Lucena City, Cagayan De Oro City,
Tacloban City, Cebu City, Davao City, IloIlo City)..Google search PRC Regional Office
• RECOGNITION WILL BE PRESENTED TO IIEE
MEMBERS WHO HELPED THEIR COMPANY COMPLY
WITH SEC 33.
• 1. DPWH
• 2. DILG
• 3. PEZA
• 6. NATIONWIDE INFORMATION DRIVE ie. social media, printed information.
7. INSTITUTIONAL.
DATABASE STATUS OF EE PRACTITIONERS
AS OF 2ND QUARTER OF 2020:
PEE 6,966
REE 65,992
RME 31,676
ITEM TYPE OF INDUSTRY TOTAL Partially extracted from
IIEE Data Base.
1 POWER PLANT 184
2 POWER DISTRIBUTION COMPANY 27 Note:
3 COMMERCIAL/ INDUSTRIAL 172 Please update your
membership status at
4 DESIGN AND PROJECT MANAGEMENT 13,128 IIEE Portal./ Webpage
5 OPERATION AND MAINTENANCE 4,969
6 FACILITIES MANAGEMENT 221
7 GOVERNMENT SECTOR 20
8 SHIPPING INDUSTRY 60
9 MINING 12
10 AIRCRAFT MAINTENACE 11
11 OIL AND GAS 81
12 TELECOM 14
1333 SALESAND MARKETING 14
14 ELECTRO-MECHANICAL 192
15 CONSTRUCTION 5,829
Extracted from the current availabe
data of the PHILIPPINE STATISTIC
AUTHORITY
ESTABLISHMENTS COVERED BY REGIONS - ( Philippines statistic Authority )
Extracted from BEE Application Process
BEE-SID-01( Requirements Checklist For
Issuance Of Certificate Of Compliance)
BEE-SID-03 (Information Sheet)
BEE-SID-04 ( Affidavit Form)
INSPECTION REPORT FORMAT
(Under review by BEE)
Proposed visitation letter format to
be used by IIEE Chapter
( Under review by BEE )
LETTER FORM BEE CHAIRMAN
AN APPEAL TO OFFICERS OF THE LAW
PURSUANT TO SECTION 39 ART. IV OF RA 7920
• TO STRICTLY ENFORCE THE SECTION 33 OF RA 7920, THE OFFICERS OF
THE LAW ie. NATIONAL GOVERNMENT, CITY OR MUNICIPAL
GOVERNMENT SHALL IMPLEMENT THE PROVISIONS OF THIS LAW BY
REQUIRING ALL BUSINESS ESTABLISHMENT AS PRE REQUISITE OR
MANDATORY REQUIREMENT FOR THE RENEWAL OF BUSINESS PERMIT
AND THIS ISFOR THE PROTECTION/SAFETY OF LIVES AND PROPERTIES.
• NOTE;
• 1) Electrical Compliance Certificate, Issued by PRC-BEE - If the connected
KVA Load is above 50 KVA ( see slide 33)
• 2) Certificate of Annual Electrical Inspection, Certified by licensed electrical
practitioner. - If the connected KVA load is 50KVA or less.
• ( see slide 34 )
SAMPLE : CERTIFICATE OF ELECTRICAL COMPLIANCE ( 3 Years Validity )
Pursuant to Paragraph 3,Art. IV Sec. 33 of RA 7920
• ESTABLISHMENT VISITATION OF
• IIEE OFFICERS FOR THE
INFORMATION DRIVE CAMPAIGN AND
RECOGNITION
MEETING WITH DPWH DIRECTORS AT MAIN OFFICE - INFORMATION DRIVE OF RA7920
RA7920 SEC. 33 SEMINAR WITH OBO/MUNICIPAL ENGINEERS
PACME- LAGUNA CHAPTER
January to August 2018 Activities
RA 7920 INFORMATION CAMPAIGN WITH THE OFFICIALS OF CITY OF CABUYAO THROUGH THE
EFFORT OF IIEE NATIONAL OFFICERS LED BY PRES ROD PICOLERA AND SLR TEAM
INFORMATION DRIVE 0F RA 7920 AT PEZA LAGUNA
VISITATION OBO/ CITY ENGINEERS OFFICE - RA7920 INFO DRIVE ( CITY OF STA ROSA )
CHAPTER ESTABLISHMENT VISITATION - ELECTRICAL COMPLIANCE
FACTORY VISITATION - YAZAKI TORRES & YAKULT PHILS. CALAMBA CITY
FACTORY VISITATION - RA7920 INFO DRIVE ( RFM CANLUBANG)
COMMERCIAL EST. VISITATION - RA7920 INFO DRIVE (SM CALAMBA)
HOSPITAL VISITATIONV- RA7920 INFO DRIVE (COMMUNITY HOSPITAL SPC )
HOSPITAL VISITATION - RA7920 INFO DRIVE, SPC MEDICAL CENTER
ELECTRICAL COMPLIANCE CERTIFICATE RECEIVED BY TOYOTA SAN PABLO LAGUNA
FROM PRC/BEE WITH THE SUPPORT OF ENGR. JESS POLINAG OF IIEE SLC
ELECTRICAL COMPLIANCE CERTIFICATE RECEIVED BY SM SAN PABLO
WITH THE SUPPORT OF ENGR. JENNY FIDELI - ENGINEERING HEAD
RECOGNITION OF CITY MAYOR OF SAN PABLO, HON. LORETO S. AMANTE FOR STRICTLY ENFORCE THE
SEC. 33 ( PERSONNEL REQUIRED) THROUGH CITY ORDINANCE WITH THE EFFORT OF IIEE SOUTHERN
LAGUNA CHAPTER ,BY REQUIRING ALL BUSINESS ESTABLISHMENTS TO HAVE A COMPLIANCE
CERTIFICATE AND ANNUAL ELECTRICAL INSPECTION CERTIFICATE PRIOR TO THE RENEWAL OF THEIR
BUSINESS PERMIT.
RECOGNITION OF THE MUNICIPAL ENGINEER OF ALAMINOS, ENGR. FLORENTINO
DESTACAMENTO IN COLLABORATION WITH IIEE SLC TO HAVE A SEMINAR ON RA7920
SEC. 33 ATTENDED BY ALL OBO AND MUNICIPAL ENGINEERS IN LAGUNA PROVINCE.
RA 7920 Article IV, Section 36.