145post PDF

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PLACE OF POSTING ON SUCESSFUL COMPLETION OF TRAINING

1. Singrauli Super Thermal Power Station, Sakthi Nagar, SoneBhadra Dist, Uttar Pradesh

2. Rihand Super Thermal Power Station, Sonebhadra Dist, Uttar Pradesh

3. Vindhyachal Super Thermal Power Station, Singrauli Dist, Madhya Pradesh

4. Talcher Super Thermal Power Station, Angul Dist, Odisha

5. Bongaigaon Thermal Power Project, Kokrajar Dist, Assam

6. Tapovan Vishnugarh Hydro Power Project, Chamoli Dist, Uttaranchal

7. Kahalgaon Super Thermal Power Station, Bhagalpur Dist, Bihar

8. Farakka Super Thermal Power Station, Murshidabad Dist, West Bengal

Joint Ventures/Subsidiaries

9. Nabinagar Power Generating Co Pvt Ltd, Nabinagar, Bihar

10. Bharatiya Rail Bijlee Company Limited (BRBCL), Nabinagar, Bihar

11. Kanti Bijlee Utpadan Nigam Limited, Kanti, Bihar

You might also like