Sewer Reticulation Boq Preliminary and General Item Description of Work QTY Unit Rate Amount $ $

This document provides a bill of quantities for sewer reticulation works for a housing development. It includes 7 items describing excavation and earthworks, supply and installation of uPVC pipes and fittings, and construction of precast concrete manholes of various diameters from 1 to 1.35 meters. The document provides descriptions, quantities, units, rates, and amounts for each work item, and includes 330 line items in total. It appears to be a preliminary cost estimate and schedule of works for a sewer pipeline network and manholes to serve the housing development.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
2K views10 pages

Sewer Reticulation Boq Preliminary and General Item Description of Work QTY Unit Rate Amount $ $

This document provides a bill of quantities for sewer reticulation works for a housing development. It includes 7 items describing excavation and earthworks, supply and installation of uPVC pipes and fittings, and construction of precast concrete manholes of various diameters from 1 to 1.35 meters. The document provides descriptions, quantities, units, rates, and amounts for each work item, and includes 330 line items in total. It appears to be a preliminary cost estimate and schedule of works for a sewer pipeline network and manholes to serve the housing development.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 10

SEWER RETICULATION BOQ

PRELIMINARY AND GENERAL


ITEM DESCRIPTION OF WORK QTY UNIT RATE AMOUNT
$ $

1.1 Allow for the Surety, Insurances Workmen's Sum


Compensation etc. Required by the
General Conditions of the Contract and
Special Conditions of Contract.

1.2 Allow for establishment on site including


clearing away on completion of the works. Sum

1.3 Allow the provisional sum of $--- Pro Sum


for the attendance upon the Engineer

1.4 Allow for a signwriter to inscribe the contractor's details


on the signboard. Pro. Sum

1.5 Allow for the compliance with all Clauses of


the General and Special Conditions of
Contract for Civil Engineering Works and Sum
Specifications for all contractual obligations
of every kind covered elsewhere.

1.6 Allow a provisional sum of $---- for Pro Sum


testing of all soils, materials and
workmanship as required in the relevant
clauses for the specification.

1.7 Allow …..% to cover overheads on Item 1.6 Sum

TOTAL BILL No 1 CARRIED TO


GENERAL SUMMARY

CHIZHANJE HOUSING DEVELOPMENT SEWER RETICULATION


SEWER RETICULATION BOQ
PRELIMINARY AND GENERAL
ITEM DESCRIPTION OF WORK QTY UNIT RATE AMOUNT
$ $

CHIZHANJE HOUSING DEVELOPMENT SEWER RETICULATION


SEWER RETICULATION BOQ
Item No DESCRIPTION Unit Qty Rate Amount

SEWER RETICULATION

1 EARTHWORKS (PIPE TRENCHES)

1.1 Site Clearance and removal of topsoil

1.1.1 Clear vegetation width of clearing 2m and trees of girth up to 1m. m 18844 0.00

1.1.2 Clear trees and designated obstacles. No 10 0.00

1.2 Excavate for trenches, backfill, compact, and dispose of


surplus/unsuitable material for uPVC pipes.

1.2.1 Pipe not exceeding 200mm diameter not exceeding 1.5m deep m 9422 0.00

1.2.2 Pipe not exceeding 200mm diameter exceeding 1.5m and not m 5653.2 0.00
exceeding 2.5m deep

1.2.3 Pipe not exceeding 200mm diameter exceeding 2.5m and not m 3768.8 0.00
exceeding 3m deep

1.2.4 Pipe exceeding 200mm diameter and not exceeding 300mm


diameter exceeding 1.5m and not exceeding 2.5m deep m 465 0.00

1.2.5 Pipe exceeding 300mm diameter exceeding 2.0m and not exceeding
3.0m deep m R.O 0.00

1.2.6 Extra over for excavating and breaking down material in:

(i) Hard rock m3 500 0.00


(ii) Anthill m3 100 0.00
(iii) Intermediate material m3 R.O

2 Supply, Lay, Bed and Test Pipeline

2.1 Class 51 uPVC Pipes and Fittings

2.1.1 (i)160mm Diameter pipe m 18309 0.00


(ii)200mm Diameter pipe m 465 0.00
(iii) 250mm Diameter pipe m 0 0.00
(iv) 315mm Diameter pipe m 0 0.00

2.1.2 Pipe Fittings

Extra over item 2.2.1 for supply and installation of uPVC pipe
fittings.
(i) Single junctions
(a) 160 x 110 x 45deg No 1800 0.00
(b) 110 x 315x45 deg No R.O
(c ) 200 x 110 x 45 deg. No R.O

Fix house connection markers No 1800 0.00

CHIZHANJE HOUSING DEVELOPMENT SEWER RETICULATION


Item No DESCRIPTION Unit Qty Rate Amount

Carried Forward 0.00

CHIZHANJE HOUSING DEVELOPMENT SEWER RETICULATION


Item No DESCRIPTION Unit Qty Rate Amount

Brought Forward 0.00

2.2 Manholes formed of 70mm thick x 915mm internal


diameter precast concrete rings, bedded on and including
20MPa concrete base, 200mm thick projecting 150mm
beyond external face of precast ring, with 150mm thick
20MPa concrete cover slab with and including cover of
cast iron frame with concrete infill including all necessary
excavations, backfilling, compaction working space, cast
iron step irons, benching, mortar bedding, forming
openings for pipes, covers and making good

2.2.1 Manhole not exceeding 1m deep No 20 0.00

2.2.2 Manhole exceeding 1m and not exceeding 2m deep No 144 0.00

2.3 Manholes formed of 70mm thick x 1 050mm internal


diameter precast concrete rings, bedded on and including
20MPa concrete base, 200mm thick projecting 150mm
beyond external face of precast ring, with 150mm thick
20MPa concrete cover slab with and including cover of
cast iron frame with concrete infill including all necessary
excavations, backfilling, compaction working space, cast
iron step irons, benching, mortar bedding, forming
openings for pipes, covers and making good

2.3.1 Manhole exceeding 1m and not exceeding 2m deep No 100 0.00

2.4 Manholes formed of 70mm thick x 1250mm internal


diameter precast concrete rings, bedded on and including
20MPa concrete base, 200mm thick projecting 150mm
beyond external face of precast ring, with 150mm thick
20MPa concrete cover slab with and including cover of
cast iron frame with concrete infill including all necessary
excavations, backfilling, compaction working space, cast
iron step irons, benching, mortar bedding, forming
openings for pipes, covers and making good

2.4.1 Manhole not exceeding 1m deep No R.O

2.4.2 Manhole exceeding 1m and not exceeding 2m deep No 65 0.00

CHIZHANJE HOUSING DEVELOPMENT SEWER RETICULATION


Item No DESCRIPTION Unit Qty Rate Amount

Carried Forward 0.00

CHIZHANJE HOUSING DEVELOPMENT SEWER RETICULATION


Item No DESCRIPTION Unit Qty Rate Amount

Brought Forward 0.00

2.5 Manholes formed of 70mm thick x 1350mm internal


diameter precast concrete rings, bedded on and including
20MPa concrete base, 200mm thick projecting 150mm
beyond external face of precast ring, with 150mm thick
20MPa concrete cover slab with and including cover of
cast iron frame with concrete infill including all necessary
excavations, backfilling, compaction working space, cast
iron step irons, benching, mortar bedding, forming
openings for pipes, covers and making good

2.5.1 Manhole not exceeding 1m deep No R.O

2.5.2 Manhole exceeding 1m and not exceeding 2m deep No 5 0.00

2.6 Manhole Covers CI HD covers to Manholes No R.O

CHIZHANJE HOUSING DEVELOPMENT SEWER RETICULATION


Item No DESCRIPTION Unit Qty Rate Amount

TOTAL CARRIED FORWARD TO SUMMARY 0.00

CHIZHANJE HOUSING DEVELOPMENT SEWER RETICULATION


SEWER RETICULATION SUMMARY
SEWER RETICULATION

Total for construction of Chizhanje Sewer Reticulation -

Add: Preliminary and Generals -

Sub-Total 1 -

Add: 10% Contingency -

Sub-Total 2 -

Add: VAT @14.5% -

Total Estimate Including VAT -

CHIZHANJE SEWER RETICULATION


CHIZHANJE SEWER RETICULATION