Jabatan Kerja Raya Malaysia (JKR)
Jabatan Kerja Raya Malaysia (JKR)
• The slope is located at, Jalan M153, Seksyen 4.1, Alor Gajah, Melaka
which located at the roadside.
• There are two (2) Slope failure occurred possibly due to erosion at toe
of slope
• The surface runoff (from existing river) could caused scouring at toe
of slope.
Kampung
Lelong
COORDINATE
2°23'58.7"N
102°08'08.7"E
Kampung
Rantau Panjang SLOPE FAILURE
LOCATION
FROM
ALOR GAJAH
FROM MASJID
TANAH
SITE PHOTO (ROAD SIDE VIEW)
FAILURE B
50 meter
FAILURE A
SITE PHOTO (FAILURE SLOPE A)
TNB UTILITY
PIPE CULVERT
TNB UTILITY
Failure No 2
SLOPE B
BH 1
SLOPE A
MP1
MP2
MP3
BOREHOLE (1 NOS)
SLOPE A
MP4
MP5
SLOPE B
MP6
BH 1
Rock
(29.5 mrRL)
(Weathered Schist) Depth SPT
0.5
1 14
1.5
2
9.0 m
3.5 10
4
11
4.5
5
UD2
5.5
6
6.5 17
7
7.5
8 50
Soil 8.5
9
10.5
11 C2
11.5
Rock 12
12.5
13
C3
(Weathered Schist)
PROPOSED
REMEDIAL WORKS
(FAILURE NO 1)
LAYOUT PLAN OF ROCKFILL (OPTION 1)
PROPOSED GABION
PROPOSED RC MATRESS
WINGWALL
PROPOSED
ROCK FILL
SLOPE B
TYPICAL SECTION OF ROCK FILL (OPTION 1 : SLOPE A)
PROPOSED
RENO MATRESS
PROPOSED
ROCK FILL
PROPOSED NEW PIPE
CULVERT ( D=1.8)
TYPICAL SECTION OF ROCK FILL (OPTION 1 : SLOPE B)
PROPOSED
ROCK FILL
LAYOUT PLAN OF REINFORCED SLOPE (OPTION 2)
SLOPE A
PROPOSED
GABION WALL AND
BACKFILL SLOPE PROPOSED
REINFORCED
SLOPE
SLOPE B
TYPICAL SECTION OF REINFORCED SLOPE (OPTION 2 : SLOPE A)
PROPOSED
RENO MATRESS
PROPOSED
REINFORCED
GEOTEXTILE SLOPE
PROPOSED PROPOSED NEW PIPE
ROCK FILL CULVERT ( D=1.8)
TYPICAL SECTION OF REINFORCED SLOPE (OPTION 2 : SLOPE B)
PROPOSED
BACKFILL SLOPE
PROPOSED GABION
WALL (3m ) Height
SLOPE STABILITY
ANALYSIS (OPTION 1)
STABILITY ANALYSIS – CASE 1: FAILURE STAGE ( SLOPE A)
STABILITY ANALYSIS – OPTION 1: ROCK FILL ( SLOPE A)
STABILITY ANALYSIS – OPTION 1: ROCK FILL ( SLOPE B)
SLOPE STABILITY
ANALYSIS (OPTION 2)
STABILITY ANALYSIS – OPTION 2: REINFORCED SLOPE (SLOPE A)
STABILITY ANALYSIS – OPTION 2: REINFORCED SLOPE (SLOPE B)
HYDRAULIC ANALYSIS
FOR EXISTING PIPE
CULVERT
AREA OF CATCHMENT
100 mRL
1.26 km
23 mRL
AREA
CATCHMENT
TIME
CONCENTRATION
LOCATION OF
RAINFALL STATION
FLOWRATE OF EACH
ANNUAL RAINFALL
INTENSITY
PIPE CULVERT CAPACITY
DIAMETER FOR 3
NOS 1.8 D CULVERT
FLOWRATE CAPACITY
131.8 m3/s
FOR CULVERT
FLOWRATE CAPACITY
FOR CULVERT
OPTION 1 OPTION 2