Section 1-1 Typical Cross Section of Tunnel With Temporary Support at Cross Passage Openings Notes
Section 1-1 Typical Cross Section of Tunnel With Temporary Support at Cross Passage Openings Notes
Section 1-1 Typical Cross Section of Tunnel With Temporary Support at Cross Passage Openings Notes
430
20
)
X.
O 1
P PR 1
0(A
25
NPB600x220x122.4 WITH
PLATE 300x10mm THK.
TOP & BOTTOM (TYP.).
2A
0
ISMC200
43
(TYP.)
75
R31
R29
20
00
3
CENTRE OF
BORED TUNNEL
4A
C
4200
TUNNEL AXIS LEVEL
10mm THK.
STIFFENER PLATE 5
(TYP.)
1
1
3
REFERENCE DRAWINGS
DRG. NO. DESCRIPTION DESIGNATION REMARKS DATE SIGNATURE DELHI METRO RAIL CORPORATION LTD.
DELHI METRO RAIL CORPORATION LTD.
THIS DRAWING IS THE PROPERTY OF
CC -18
DESIGN QUALITY ASSURANCE PROOF CHECKER'S APPROVAL
1:20
TUNNELS
C CONSTRUCTION REFERENCE DRAWING PKV MD PN/MK 20.10.14 BY DDC OF CONTRACTOR BY CONTRACTOR
B CONSTRUCTION REFERENCE DRAWING PKV MD PN/MK 06.08.14 DELD12070-CC18-GT-370-C C
A CONSTRUCTION REFERENCE DRAWING GL MD PN/MK 11.06.14 20.10.14 20.10.14 20.10.14 20.10.14 20.10.14 CROSS PASSAGE
SATHESH ALI H PAUL N/MURALI ATUL JOLLY SHAHRAM H TEMPORARY STEEL FRAME
(SHEET 1 OF 4)
FILE NAME: \\INGGN3VFP001\DATA\PROJECTS\2012\04-GEOTECH\DELD12070_CC18\06CAD\6.3FINAL_DRAWINGS\6.3.3 CRD\DELD12070-CC18-GT-370-C-C.DWG