Audit Finding

The audit found that manpower planning for A checks of an A320 aircraft was done without considering the maintenance planning document man-hours and the certifying staff names were not included. The same number of aircraft maintenance engineers were allocated for different A checks even though the man-hours differed. The root cause was a lack of effective man-hour and manpower planning. Corrective actions included planning maintenance based on work order due dates, aircraft utilization, logistics, and manpower. Preventive actions instructed allocating manpower based on man-hour requirements for each maintenance activity.

Uploaded by

dnes9999
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views1 page

Audit Finding

The audit found that manpower planning for A checks of an A320 aircraft was done without considering the maintenance planning document man-hours and the certifying staff names were not included. The same number of aircraft maintenance engineers were allocated for different A checks even though the man-hours differed. The root cause was a lack of effective man-hour and manpower planning. Corrective actions included planning maintenance based on work order due dates, aircraft utilization, logistics, and manpower. Preventive actions instructed allocating manpower based on man-hour requirements for each maintenance activity.

Uploaded by

dnes9999
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Audit Finding

The man power planning for A check of A320 aircraft was done without considering MPD man
hour. The name of the certifying staff was not included on the plan. Same number of AME's
were allocated for several checks (A1, A2, A3, A4, A5 ) even though the MPD hour differs.

Root Cause
Lack of effective man hour and man power planning.
Corrective Action
PPCS is planning schedule maintenance work based on work order due, aircraft utilization,
availability of aircraft, logistics and man power. The planned maintenance is informed to line
maintenance one week prior with man hour requirement. In-charge, Line and base maintenance
is allocating non certifying man power and certifying man power is allocated by A330/A320
maintenance coordinator. Combined Man power list is prepared for each’ A’ check based on
man hour required.

Preventive Action
In-charge, Line and Base Maintenance and A330/A320 Maintenance coordinator are instructed
to allocate the man power based on man hour requirement for each maintenance activities.

Implementation Plan
Man power will be allocated based on man hour requirement for each maintenance.