1 Semen/PC (50 Kg) zak 76,950.00 77,950.00 79,950.00
2 Semen Warna Putih/PC (40 Kg) Kg 5,300.00 5,300.00 5,350.00
3 Kapur Pasang Kg 42,500.00 43,000.00 44,000.00
II BAHAN BESI DAN KAWAT
1 Besi Beton Biasa (Polos), D 6 mm - 12 mm Kg 13,148.60 13,348.60 13,448.60
2 Besi Beton Biasa (Polos), D 14 mm - 21 mm Kg 14,231.15 14,431.15 14,531.15
3 Besi Beton Ulir Kg 18,575.00 18,775.00 18,875.00
4 Kawat Beton (Kawat Bidrat) Kg 30,250.00 30,750.00 31,250.00
5 Besi Siku 2,2 x 30 M¹ 22,291.67 22,375.00 22,458.33
6 Besi Siku 3,2 x 40 M¹ 26,666.67 26,750.00 26,833.33
7 Besi Siku 4,2 x 40 M¹ 44,166.67 44,250.00 44,333.33
8 Besi Hollow Galpanis 2.4 M¹ 17,041.67 17,125.00 17,208.33
9 Besi Hollow Galpanis 4.4 M¹ 33,141.67 33,225.00 33,308.33
10 Besi Hollow Galpanis 4.6 M¹ 40,666.67 40,750.00 40,833.33
11 Besi Hollow Galpanis 5.15 M¹ 67,791.67 67,875.00 67,958.33
12 Besi Baja H Kg 17,216.67 17,300.00 17,383.33
13 Baut/Mur Kg 28,450.00 28,500.00 28,650.00
14 Paku Campuran (5,7,10 Cm) Kg 19,700.00 19,750.00 19,900.00
15 Paku Seng Kg 48,400.00 48,450.00 48,600.00
16 Paku Jembatan kg 27,050.00 27,100.00 27,250.00
17 Paku Tripleks Kg 35,100.00 35,150.00 35,300.00
18 Paku Tripleks uk 3/4 ktk 73,600.00 73,650.00 73,800.00
19 Paku Sekrup Dos 19,000.00 19,050.00 19,200.00
20 Paku Beton Kg 28,975.00 29,025.00 29,175.00
21 Paku Kalsiboard/Gypsumboard Kg 36,850.00 36,900.00 37,050.00
22 Paku Anti Karat untk Genteng Metal 35m2/kg Kg 52,600.00 52,650.00 52,800.00
23 Roof Bottom / Reng 30 / 0.45 Batang 48,250.00 48,750.00 49,250.00
24 Roof Bottom / Reng 33 / 0.45 Batang 53,500.00 54,000.00 54,500.00
25 Dynabolt 10x60 mm Buah 3,150.00 3,150.00 3,150.00
26 Dynabolt 10x80 mm Buah 4,200.00 4,200.00 4,200.00
27 Dynabolt 12x12 mm Buah 5,250.00 5,250.00 5,250.00
28 Paku Asbes Kg 52,500.00 52,500.00 52,500.00
29 Kawat anyam Roll 205,750.00 206,250.00 206,750.00
30 Besi Hollow Galpanis 2x2 Batang 12,458.33 12,729.17 13,000.00
31 Besi Hollow Galpanis 2x4 Batang 18,400.00 18,800.00 19,200.00
32 Besi Hollow Galpanis 4x4 Batang 24,916.67 25,458.33 26,000.00
33 Besi Hollow Galpanis 4x6 Batang 34,500.00 35,250.00 36,000.00
34 Besi Hollow Galpanis 4x8 Batang 45,041.67 46,020.83 47,000.00
35 Pipa Galvanis ø 1/2" panjang 6 m M' 28,750.00 29,375.00 30,000.00
36 Pipa Galvanis ø 3/4" panjang 6 m M' 38,333.33 39,166.67 40,000.00
37 Pipa GIP Ǿ 30 cm/12 Inci (6 M) M' 1,580,520.83 1,593,020.83 1,605,520.83
38 Bend 22.5' GIP Ǿ 30 cm/12 Inci Buah 1,625,000.00 1,650,000.00 1,650,000.00
39 Bend 45' GIP Ǿ 30 cm/12 Inci Buah 1,625,000.00 1,650,000.00 1,650,000.00
40 Tee GIP Ǿ 30 cm/12 Inci Buah 1,625,000.00 1,650,000.00 1,650,000.00
41 Stop Kran Ǿ 30 cm/12 Inci Buah 1,625,000.00 1,650,000.00 1,650,000.00
42 Saringan Baja Lembar 387,500.00 397,500.00 402,500.00
43 Plat Baja 3 mm (1.2x2.4) M² 561,197.92 636,197.92 711,197.92
44 Plat Baja 5 mm (1.2x2.4) M² 963,541.67 1,038,541.67 1,113,541.67
45 Besi Strip 8 cm ,t 1 mm M' 80,187.50 105,187.50 105,187.50
46 Tiang Pancang Dia. 30 cm M' 908,500.00 924,300.00 940,100.00
47 Tiang Pancang Dia. 40 cm M' 1,150,000.00 1,170,000.00 1,190,000.00
48 Tiang Pancang Dia. 50 cm M' 1,665,200.00 1,694,160.00 1,723,120.00
49 Tiang Pancang Dia. 60 cm M' 2,029,750.00 2,065,050.00 2,100,350.00
III BAHAN KERAMIK
1 Keramik Putih 10 x 20 Cm Dos 71,292.25 71,792.25 74,792.25
2 Keramik Warna 10 x 20 Cm Dos 64,000.00 64,500.00 67,500.00
3 Keramik Putih 20 x 20 Cm Dos 71,350.00 71,850.00 74,850.00
4 Keramik Warna 20 x 20 Cm Dos 74,500.00 75,000.00 78,000.00
5 Keramik Putih 20 x 25 Cm Dos 72,400.00 72,900.00 75,900.00
6 Keramik Warna 20 x 25 Cm Dos 79,750.00 80,250.00 83,250.00
7 Keramik Putih 30 x 30 Cm Dos 69,250.00 69,750.00 72,750.00
8 Keramik Warna 30 x 30 Cm Dos 72,400.00 72,900.00 75,900.00
9 Keramik Putih 40 x 40 Cm Dos 72,400.00 72,900.00 75,900.00
10 Keramik Warna 40 x 40 Cm Dos 85,000.00 85,500.00 88,500.00
11 Keramik Warna 60 x 60 Cm Dos 158,500.00 159,000.00 162,000.00
12 Tegel Keramik List 5 x 20 Cm (Putih) Buah 16,750.00 17,250.00 20,250.00
13 Nitro Granite Surface Lapato Shade 60x60 M2 195,250.00 195,750.00 198,750.00
14 Nitro Granite Surface Lapato Coal 60x60 M2 205,750.00 206,250.00 209,250.00
15 Nitro Granite Surface matt bora, fohn, kosawa, mistral 60x60 M2 184,750.00 185,250.00 188,250.00
16 Keramik Lantai Mosaik M2 69,250.00 69,750.00 72,750.00
IV BAHAN KACA
1 Kaca Bening 3 mm M2 156,400.00 156,900.00 159,900.00
2 Kaca Bening 5 mm M2 158,500.00 159,000.00 162,000.00
3 Kaca Riben 3 mm M2 211,000.00 211,500.00 214,500.00
4 Kaca Riben 5 mm M2 263,500.00 264,000.00 267,000.00
V BAHAN LANGIT-LANGIT
1 Triplex 2 mm (122x244 Cm) Lembar 49,850.00 50,350.00 50,850.00
2 Triplex 3 mm (122x244 Cm) Lembar 62,450.00 62,950.00 63,450.00
3 Triplex 6 mm (122x244 Cm) Lembar 97,625.00 98,125.00 98,625.00
4 Triplex 9 mm (122x244 Cm) Lembar 147,500.00 148,000.00 148,500.00
5 Melamin Dico Lembar 95,000.00 95,500.00 96,000.00
6 Polywood 9 mm Lembar 158,000.00 158,500.00 159,000.00
7 Reng Kayu Borneo Super meranti 2/3 Batang 14,150.00 14,400.00 14,650.00
8 Reng Kayu Borneo Super meranti 3/4 Batang 16,250.00 16,500.00 16,750.00
9 Gypsum Jaya Board (120x240 Cm) Lembar 90,250.00 90,750.00 91,250.00
10 Gypsum Elephant(120x240 Cm) Lembar 90,250.00 90,750.00 91,250.00
11 Gypsum Jaya Board (120x240 Cm, 9 mm) Lembar 85,000.00 85,500.00 86,000.00
12 Kalsiboard (240x120 Cm) Lembar 74,500.00 75,000.00 75,500.00
13 Eternit 3 mm Lembar 102,153.65 102,653.65 103,153.65
VI LIST PROFIL PLAFOND
1 1 x 4 cm panjang 4 m Batang 19,200.00 19,500.00 19,900.00
2 3 x 3 cm panjang 4 m Batang 17,100.00 17,400.00 17,800.00
3 4 x 4 cm panjang 4 m Batang 21,300.00 21,600.00 22,000.00
4 5 x 5 cm panjang 4 m Batang 16,050.00 16,350.00 16,750.00
VII BAHAN ATAP
1 Genteng Multi Roof Color (77x100 cm) Lembar 42,750.00 43,000.00 43,250.00
2 Nok Genteng Sakura Roof Clasic Std (P=91 cm) Buah 37,250.00 37,500.00 37,750.00
3 Nok Genteng Sakura Roof Royal Std (P=91 cm) Buah 37,250.00 37,500.00 37,750.00
4 Nok Genteng Soka Abadi Std (P=110 cm) Buah 28,850.00 29,100.00 29,350.00
5 Seng BWG 34" BJLS 0.20 mm kk 8,480.00 8,730.00 8,980.00
6 Seng Plat BWG BJLS 0.20 mm (lebar 30 Cm) m 12,850.00 13,100.00 13,600.00
7 Seng Plat BJLS 20 Plat Lebar 55 Cm M' 21,250.00 21,500.00 22,000.00
8 Seng Plat BJLS 20 Plat Lebar 60 Cm M' 26,500.00 26,750.00 27,250.00
9 Seng Plat BJLS 20 Plat Lebar 70 Cm M' 31,750.00 32,000.00 32,500.00
10 Seng Plat BJLS 20 Plat Lebar 80 Cm M' 37,000.00 37,250.00 37,750.00
11 Seng Plat BJLS 20 Plat Lebar 90 Cm M' 58,000.00 58,250.00 58,750.00
12 Seng Plat BJLS 25 Plat Lebar 90 Cm M' 47,500.00 47,750.00 48,250.00
13 Roster Lukis uk 30x30 warna Buah 79,000.00 79,250.00 79,750.00
14 Genteng Metal Sakura Lbr 40,150.00 40,400.00 40,900.00
15 Glass Block / Roster Uk 20x20 Dus 31,750.00 32,000.00 32,500.00
16 Roster Ekonomis Uk 20x20 Polos Buah 47,500.00 47,750.00 48,250.00
17 Roster Ekonomis Uk 30x30 Polos Buah 68,500.00 68,750.00 69,250.00
18 Roster Minimalis (RO-56) Uk 20x40 Pcs 73,750.00 74,000.00 74,500.00
19 Roster Minimalis (RO-73) Uk 20x40 Pcs 73,750.00 74,000.00 74,500.00
20 Bubung Genteng Metal Sakura Buah 37,000.00 37,250.00 37,750.00
VIII BAHAN CAT DAN MINYAK
1 Minyak Cat Ltr 28,450.00 28,500.00 28,650.00
2 Thener ND Ltr 36,850.00 36,900.00 37,050.00
3 Thener Duco Ltr 47,350.00 47,400.00 47,550.00
4 Cat Tembok Avitex Kg 31,600.00 31,650.00 31,800.00
5 Cat Tembok Metrolite Kg 43,675.00 43,725.00 43,875.00
6 Cat Tembok Aries Kg 10,600.00 10,650.00 10,800.00
7 Cat Tembok Tiger Kg 17,425.00 17,475.00 17,625.00
8 Cat Tembok Saniex Kg 42,100.00 42,150.00 42,300.00
9 Cat Tembok Saniex Wonder Kg 47,350.00 47,400.00 47,550.00
10 Cat Tembok Satin Putih 18,9L 10,600.00 10,650.00 10,800.00
11 Cat Tembok Satin Putih 3,78L 19,525.00 19,575.00 19,725.00
12 Cat Many Kayu/Besi Kg 22,675.00 22,725.00 22,875.00
13 Cat Kilap Kayu (Sejenis Avian) Ltr 63,100.00 63,150.00 63,300.00
14 Cat Dasar Alkali Ltr 105,100.00 105,150.00 105,300.00
15 Cat Galvanis Avian Kg 57,850.00 57,900.00 58,050.00
16 Cat Many/Dasar Avian Kg 42,100.00 42,150.00 42,300.00
17 Cat Glotex Kg 59,950.00 60,000.00 60,150.00
18 Politur/ Vernis Ltr 68,250.00 68,250.00 68,250.00
19 Dempul Kayu Kg 76,225.00 76,275.00 76,425.00
20 Lem Kayu (Fox) Kg 21,100.00 21,150.00 21,300.00
21 Plamur Tembok Kg 19,000.00 19,050.00 19,200.00
22 Residu Kg 27,400.00 27,450.00 27,600.00
23 Amplas Kasar Kayu Lembar 3,675.00 3,675.00 3,675.00
24 Amplas Halus Kayu Lembar 4,200.00 4,200.00 4,200.00
25 Amplas Besi Lembar 3,150.00 3,150.00 3,150.00
26 Kuas 3" Buah 10,500.00 10,500.00 10,500.00
27 Kuas 4" Buah 15,750.00 15,750.00 15,750.00
28 Kuas 5" Buah 21,000.00 21,000.00 21,000.00
29 Kuas Rol Buah 36,750.00 36,750.00 36,750.00
IX KUNCI - KUNCI
1 Kunci Tanam 2 Kali Putar T Buah 141,750.00 141,750.00 141,750.00
2 Kunci Tanam Antik Buah 141,750.00 141,750.00 141,750.00
3 Kunci Gembok Besar Buah 39,375.00 39,375.00 39,375.00
4 Kunci Gembok Sedang Buah 31,500.00 31,500.00 31,500.00
5 Kunci Gembok Kecil Buah 26,250.00 26,250.00 26,250.00
6 Grendel Pintu Biasa Buah 15,750.00 15,750.00 15,750.00
7 Grendel Pintu Kuningan Buah 28,875.00 28,875.00 28,875.00
8 Grendel Jendela Biasa Buah 7,875.00 7,875.00 7,875.00
9 Grendel Jendela Kuningan Buah 14,437.50 14,437.50 14,437.50
10 Engsel Pintu Nylon Besar Pasang 31,500.00 31,500.00 31,500.00
11 Engsel Pintu Nylon Kecil Pasang 21,000.00 21,000.00 21,000.00
12 Engsel SES " Pasang 57,750.00 57,750.00 57,750.00
13 Engsel Pintu H Kupu-kupu Biasa Pasang 15,750.00 15,750.00 15,750.00
14 Engsel Pintu H Kupu-kupu Kuningan Pasang 26,250.00 26,250.00 26,250.00
15 Engsel Jendela H Kupu-kupu Biasa Pasang 9,450.00 9,450.00 9,450.00
16 Engsel Jendela H Kupu-kupu Kuningan Pasang 10,500.00 10,500.00 10,500.00
17 Engsel Pintu 3 mm x 4 inch Pasang 31,500.00 31,500.00 31,500.00
18 Handel Pintu Type Besar Pasang 367,500.00 367,500.00 367,500.00
19 Kunci Pintu Tanam Besar Buah 170,625.00 170,625.00 170,625.00
20 Kunci Pintu Tanam Kecil Buah 105,000.00 105,000.00 105,000.00
21 Kunci Pintu Type Besar Cap Kuda Terbang Buah 112,875.00 112,875.00 112,875.00
22 Kunci Pintu Type Kecil Cap Kuda Terbang Buah 97,125.00 97,125.00 97,125.00
23 Kunci Kodai Primer Set 123,900.00 123,900.00 123,900.00
24 Hak Angin Biasa Buah 6,562.50 6,562.50 6,562.50
25 Hak Angin Kuningan Buah 17,535.00 17,535.00 17,535.00
26 Gembok Soligen 40 mm leher pendek pcs 36,750.00 36,750.00 36,750.00
27 Gembok Soligen 50 mm leher pendek pcs 47,250.00 47,250.00 47,250.00
28 Gembok Soligen 50 mm leher panjang pcs 52,500.00 52,500.00 52,500.00
29 Engsel BLC 3" psg 26,250.00 26,250.00 26,250.00
30 Engsel BLC 3" psg 36,750.00 36,750.00 36,750.00
31 Espag Nolet psg 15,750.00 15,750.00 15,750.00
32 Kunci Lemari 888 Buah 21,000.00 21,000.00 21,000.00
X BAHAN INSTALASI LISTRIK
1 Pipa ø 5/8 inch, panjang 4 m, SNI Batang 13,625.00 13,875.00 14,125.00
2 Pipa ø 3/4 inch, panjang 4 m, SNI Batang 53,000.00 53,250.00 53,500.00
3 Pipa ø 1 inch, panjang 4 m, SNI Batang 74,000.00 74,250.00 74,500.00
4 Kabel NYY 2 x 1.5 mm, SNI Rol 684,000.00 685,500.00 687,500.00
5 Kabel NYY 2 x 2.5 mm, SNI Rol 1,156,500.00 1,158,000.00 1,160,000.00
6 Kabel NYY 2 x 4 mm, SNI Rol 243,000.00 244,500.00 246,500.00
7 Kabel NYM 1,5 mm, SNI Rol 458,250.00 459,750.00 461,750.00
8 Kabel NYM 2,5 mm, SNI Rol 666,750.00 666,750.00 666,750.00
9 Kabel NYA Eterna 1x1,5 mm (100 m) Rol 277,125.00 278,625.00 280,625.00
10 Kabel NYA Eterna 1x2,5 mm (100 m) Rol 379,500.00 381,000.00 383,000.00
11 Saklar Tunggal, SNI Buah 14,700.00 14,700.00 14,700.00
12 Saklar Ganda, SNI Buah 16,800.00 16,800.00 16,800.00
13 Stop Kontak 1 lubang Setara Broco Buah 14,700.00 14,700.00 14,700.00
14 Stop Kontak 2 lubang Setara Broco Buah 18,900.00 18,900.00 18,900.00
15 T Dos 3 Way 20 mm Buah 26,250.00 26,250.00 26,250.00
16 T Dos 4 Way 20 mm Buah 4,200.00 4,200.00 4,200.00
17 L Bow TM Buah 5,250.00 5,250.00 5,250.00
18 Inbow Dos TM 20 mm Buah 4,200.00 4,200.00 4,200.00
19 Outbow Doos TM 20 mm Buah 4,200.00 4,200.00 4,200.00
20 Solasi Listrik Unibell Buah 15,750.00 15,750.00 15,750.00
21 Stop Kontak, SNI Buah 17,325.00 17,325.00 17,325.00
22 Sekring Kast 1 Group Biasa, SNI Buah 36,750.00 36,750.00 36,750.00
23 Sekring Kast 2 Group Biasa, SNI Buah 52,500.00 52,500.00 52,500.00
24 Sekring Kast 3 Group Biasa, SNI Buah 73,500.00 73,500.00 73,500.00
25 Fitting Gantung, SNI Buah 8,400.00 8,400.00 8,400.00
26 Fitting Plafond, SNI Buah 17,850.00 17,850.00 17,850.00
27 Bola Lampu 15 - 75 Watt, SNI Buah 6,300.00 6,300.00 6,300.00
28 Bola Lampu 100 Watt pijar, SNI Buah 10,500.00 10,500.00 10,500.00
29 Lampu TL 1 x 20 W, SNI Buah 15,750.00 15,750.00 15,750.00
30 Lampu TL 1 x 40 W, SNI Buah 21,000.00 21,000.00 21,000.00
31 Lampu TL Lingkar 10 W, SNI Buah 42,000.00 42,000.00 42,000.00
32 Lampu TL Lingkar 20 W, SNI Buah 56,700.00 56,700.00 56,700.00
33 Lampu Pijar 25 Watt, SNI Buah 5,250.00 5,250.00 5,250.00
34 Lampu Pijar 40 Watt, SNI Buah 6,300.00 6,300.00 6,300.00
35 Lampu Pijar 60 Watt, SNI Buah 7,350.00 7,350.00 7,350.00
36 Lampu Pijar 100 Watt, SNI Buah 10,500.00 10,500.00 10,500.00
37 Lampu PLC 5 Watt, SNI Buah 31,500.00 31,500.00 31,500.00
38 Lampu PLC 8 Watt, SNI Buah 36,750.00 36,750.00 36,750.00
39 Lampu PLC 11 Watt, SNI Buah 37,800.00 37,800.00 37,800.00
40 Lampu PLC 14 Watt, SNI Buah 39,900.00 39,900.00 39,900.00
41 Lampu PLC 18 Watt, SNI Buah 42,000.00 42,000.00 42,000.00
42 Lampu PLC 23 Watt, SNI Buah 44,100.00 44,100.00 44,100.00
43 Lampu PLC 35 Watt, SNI Buah 68,250.00 68,250.00 68,250.00
44 Dudukan Lampu Downlight UK 4 Buah 31,500.00 31,500.00 31,500.00
45 Dudukan Lampu Downlight UK 5 Buah 47,250.00 47,250.00 47,250.00
46 Kotak MCB, 4 Group, SNI Buah 78,750.00 78,750.00 78,750.00
47 MCB Buah 57,750.00 57,750.00 57,750.00
XI BAHAN SANITASI
1 Kloset Jongkok Set 195,750.00 197,250.00 199,250.00
2 Kloset Duduk Tanpa Tabung Set 762,750.00 764,250.00 766,250.00
3 Kloset Duduk Dengan Tabung Set 2,101,500.00 2,103,000.00 2,105,000.00
4 Kloset Jongkok As Warna Muda pcs 190,500.00 192,000.00 194,000.00
5 Kloset Jongkok As Warna Tua pcs 211,500.00 213,000.00 215,000.00
6 Wastafel Dinding Set 421,500.00 423,000.00 425,000.00
7 Bak Cuci Logam 1 Lubang Set 211,500.00 213,000.00 215,000.00
8 Bak Mandi Fiber Glass Set 146,400.00 147,900.00 149,900.00
9 Pompa Air 450 Watt, Head 9 m Buah 684,000.00 685,500.00 687,500.00
10 Kran Air Kuningan ø 1/2" GI Buah 42,000.00 42,000.00 42,000.00
11 Kran Air Kuningan ø 3/4" GI Buah 63,000.00 63,000.00 63,000.00
12 Kran Air Biasa ø 1/2" GI Buah 21,000.00 21,000.00 21,000.00
13 Kran Air Biasa ø 3/4" GI Buah 120,750.00 120,750.00 120,750.00
14 Kran Cuci Piring Flexibel Pcs 136,500.00 136,500.00 136,500.00
15 Kran Cuci Piring Std Pcs 78,750.00 78,750.00 78,750.00
16 Kran Cuci piring Pcs 36,750.00 36,750.00 36,750.00
17 Soket ø 1/2" s/d 3/4" Buah 4,200.00 4,200.00 4,200.00
18 Knee ø 1/2" s/d 3/4" Buah 15,750.00 15,750.00 15,750.00
19 Elbow ø 1/2" s/d 3/4" Buah 4,200.00 4,200.00 4,200.00
20 Tee Stuk ø 1/2" s/d 3/4" Buah 5,250.00 5,250.00 5,250.00
21 Lem Pipa PVC Kaleng 68,250.00 68,250.00 68,250.00
22 Lem Paralon Kaleng 21,000.00 21,000.00 21,000.00
23 Kran Panas Atau Dingin Buah 367,500.00 367,500.00 367,500.00
24 Floor Drain Sen Ei Buah 110,250.00 110,250.00 110,250.00
25 Floor Drain Sen Lokal Buah 15,750.00 15,750.00 15,750.00
26 Floor Drain Buah 15,750.00 15,750.00 15,750.00
27 Floor Drain FLS 02 2" Buah 26,250.00 26,250.00 26,250.00
28 Floor Drain FLS 02 2" Buah 31,500.00 31,500.00 31,500.00
29 Kran 1/2" San-E pcs 21,000.00 21,000.00 21,000.00
30 Kran 3/4" Onda pcs 36,750.00 36,750.00 36,750.00
31 Kran 1/2" Onda pcs 26,250.00 26,250.00 26,250.00
32 Kran Cabang pcs 105,000.00 105,000.00 105,000.00
33 Kran 1/2" Stainles pcs 63,000.00 63,000.00 63,000.00
34 Kran 1/2" Ekonomi San-E pcs 52,500.00 52,500.00 52,500.00
35 Stop Kran 1/2" San-E pcs 21,000.00 21,000.00 21,000.00
36 Stop Kran 1/2"Onda pcs 18,900.00 18,900.00 18,900.00
37 Stop Kran 1/2" Jiarong pcs 57,750.00 57,750.00 57,750.00
38 Stop Kran 3/4" Jiarong" pcs 63,000.00 63,000.00 63,000.00
39 Stop Kran 1" Onda pcs 63,000.00 63,000.00 63,000.00
40 Selang Plastik 3/4" Roll 262,500.00 262,500.00 262,500.00
41 Selang Benang 1/2" Roll 346,500.00 346,500.00 346,500.00
42 Selang Benang 5/8" Roll 420,000.00 420,000.00 420,000.00
43 Shower Mandi pcs 525,000.00 525,000.00 525,000.00
XII BAHAN PIPA
1 Pipa PVC ø 1/2" (AW) 4 m Batang 26,550.00 26,750.00 27,000.00
2 Pipa PVC ø3/4" (AW) 4 m Batang 31,800.00 32,000.00 32,250.00
3 Pipa PVC ø 1" (AW) 4 m Batang 47,550.00 47,750.00 48,000.00
4 Pipa PVC ø 1,5" (AW) 4 m Batang 79,050.00 79,250.00 79,500.00
5 Pipa PVC ø 2" (AW) 4 m Batang 105,500.00 105,750.00 106,000.00
6 Pipa PVC ø 2,5" (AW) 4 m Batang 158,000.00 158,250.00 158,500.00
7 Pipa PVC ø 3" (AW) 4 m Batang 179,000.00 179,250.00 179,500.00
8 Pipa PVC ø 4" (AW) 4 m Batang 263,000.00 263,250.00 263,500.00
9 Water Meter ø 1/2" (Standar PDAM) Buah 22,791.50 23,041.50 23,291.50
10 Pipa PVC-O ø 8" (Rucika, Apollo PN 10) 6 m M' 489,813.00 490,313.00 490,813.00
11 Pipa PVC-O ø 10" (Rucika, Apollo PN 10) 6 m M' 762,725.00 763,725.00 764,725.00
12 Pipa PVC-O ø 12" (Rucika, Apollo PN 10) 6 m M' 1,217,262.00 1,218,262.00 1,219,262.00
13 Pipa PVC-O ø 16" (Rucika, Apollo PN 10) 6 m M' 1,956,803.00 1,957,803.00 1,958,803.00
14 Pipa PVC-O ø 20" (Rucika, Apollo PN 10) 6 m M' 3,065,839.00 3,066,839.00 3,067,839.00
15 Water Mor 1/2 Buah 21,500.00 22,000.00 23,000.00
16 Over Sock GI 1/2 Buah 21,500.00 22,000.00 23,000.00
17 Double Niple 1/2 " Buah 16,250.00 16,750.00 17,750.00
18 Stop Kran 1/2" Buah 47,750.00 48,250.00 49,250.00
19 Pipa PVC (D) Dia 1 1/2 Sekualitas maspion Btng 21,300.00 21,500.00 21,500.00
20 Pipa PVC (D) Dia 2 Sekualitas maspion Btng 63,300.00 63,500.00 63,500.00
21 MCCB 6A/6KA Bh 15,750.00 15,750.00 15,750.00
22 MCB 6A/10KA Bh 31,500.00 31,500.00 31,500.00
23 MCB 10A/6KA Bh 63,000.00 63,000.00 63,000.00
24 MCB 10A/8KA Bh 63,000.00 63,000.00 63,000.00
25 MCCB 10A/18KA Unit 63,000.00 63,000.00 63,000.00
26 MCCB 15A/10KA Bh 63,000.00 63,000.00 63,000.00
BAHAN LOKAL
I TANAH TIMBUNAN
1 Material Klas C (Sirtu) M3 80,285.26 105,285.26 80,285.26
2 Tanah Timb. Pilihan M3 77,256.84 102,256.84 77,256.84
3 Tanah Timbunan Biasa M3 77,256.84 102,256.84 77,256.84
4 Geo Tekstil Woven 250 M2 44,200.00 44,225.00 44,250.00
II PASIR (LOKASI)
1 Pasir Urug M3 139,500.00 154,500.00 139,500.00
2 Pasir Pasangan M3 139,500.00 154,500.00 139,500.00
3 Pasir Beton (Maligano) M3 217,200.00 232,200.00 187,200.00
III BATU
1 Batu Merah Biji 892.00 942.00 892.00
2 Kerikil Kali (Maligano) M3 290,285.26 315,285.26 90,285.26
3 Kerikil Pecah (Maligano Pecah manual) M3 525,000.00 550,000.00 325,000.00
4 Batu Gunung 0,5 - 1 cm (Pecah manual) M3 351,500.00 371,500.00 351,500.00
5 Batu Gunung 1 - 2 cm (Pecah manual) M3 325,000.00 345,000.00 325,000.00
6 Batu Gunung 2 - 3 cm (Pecah manual) M3 325,000.00 345,000.00 325,000.00
7 Batu Gunung 3 - 5 cm (Pecah manual) M3 272,000.00 292,000.00 272,000.00
8 Batu Gunung 5 - 7 cm (Pecah manual) M3 240,200.00 260,200.00 240,200.00
9 Batu Belah 15/25-25/35 cm M3 155,400.00 175,400.00 155,400.00
IV LAPIS PONDASI
1 Lapis Pondasi Atas (Ready Mix) M3 881,500.00 901,500.00 881,500.00
2 Lapis Pondasi Bawah (Ready Mix) M3 749,000.00 769,000.00 749,000.00
V PAVING BLOCK
1 Paving Block Pres Mesin Tek. 150 Kg M2 123,950.00 128,950.00 133,950.00
2 Paving Blok Segi Cetak Manual M2 123,950.00 128,950.00 133,950.00
3 Batako Pres Manual M2 123,950.00 128,950.00 133,950.00
VI BAHAN KAYU (PENAMPUNG)
1 Papan Kayu Jati M3 4,547,150.00 4,572,150.00 4,547,150.00
2 Papan Kayu Bayam M3 4,547,150.00 4,572,150.00 4,547,150.00
3 Papan Kayu Kalapi M3 4,547,150.00 4,572,150.00 4,547,150.00
1 Papan Kayu Klas II A (Sejenis) M3 2,360,000.00 2,385,000.00 2,360,000.00
2 Papan Kayu Klas II (Sejenis) M3 1,835,000.00 1,860,000.00 1,835,000.00
3 Papan Perancah M3 1,625,000.00 1,650,000.00 1,625,000.00
4 Balok Kayu Jati M3 4,250,000.00 4,275,000.00 4,250,000.00
5 Balok Kayu Bayam M3 4,250,000.00 4,275,000.00 4,250,000.00
6 Balok Kayu Kalapi M3 4,250,000.00 4,275,000.00 4,250,000.00
7 Balok Kayu Klas II A (Sejenis) M3 2,360,000.00 2,385,000.00 2,360,000.00
8 Balok Kayu Klas II (Sejenis) M3 1,835,000.00 1,860,000.00 1,835,000.00
9 Balok Perancah M3 1,625,000.00 1,650,000.00 1,625,000.00
10 Dolken Ø 5 Cm Batang 5,750.00 5,750.00 6,250.00
11 Dolken Ø 10 Cm Batang 8,900.00 8,900.00 9,400.00
12 Dolken Ø 15 Cm Batang 13,100.00 13,100.00 13,600.00
13 Bambu Tebal panjang 7 m Batang 106,000.00 106,000.00 106,000.00
14 Bambu Tipis panjang 7 m Batang 53,500.00 53,500.00 53,500.00
15 Batang Kelapa Batang 365,000.00 365,000.00 365,000.00
16 Atap nipa/alang-alang/kulit sagu Lembar 3,250.00 3,250.00 3,250.00
17 Ijuk Kg 26,350.00 26,350.00 26,350.00
VII BAHAN ASPAL
1 Aspal (Cold Paving Hot Mix Asphalt) Ton 1,519,000.00 1,519,000.00 1,569,000.00
2 Aspal Butur Seal Ton 1,821,800.00 1,821,800.00 1,871,800.00
3 Asbuton B 50/30 Kg 1,821.80 1,821.80 1,821.80
4 Aspal Bitumen Kg 13,450.00 13,450.00 13,450.00
5 Asphal (Asphalt Concrete Wearing Course) Ton 2,102,000.00 2,102,000.00 2,152,000.00
6 Bangker Oli (BO) Liter 6,463.54 6,463.54 6,463.54
VIII ALAT BANTU
1 Alat Bantu set 6,250.00 7,250.00 8,250.00
HARGA JUAL BBM KEEKONOMIAN (NON SUBSIDI) 0.00 0.00 0.00
1 Minyak Solar HSD (Industri) + PPh Liter 9,505.00 10,005.00 10,505.00
2 Minyak Tanah/Kerosene Liter 9,480.00 9,980.00 10,480.00
3 Minyak Pelumas Liter 32,800.00 33,300.00 33,800.00
4 Premium/Gasolene Liter 9,480.00 9,980.00 10,480.00
UPAH KERJAH KERJA
1 Mandor Org/Hari 125,000.00 125,000.00 125,000.00
2 Kepala Tukang Org/Hari 150,000.00 150,000.00 150,000.00
3 Tukang 125,000.00 125,000.00 125,000.00
- Tukang Listrik Org/Hari 125,000.00 125,000.00 125,000.00
- Tukang Batu Org/Hari 125,000.00 125,000.00 125,000.00
- Tukang Kayu Org/Hari 125,000.00 125,000.00 125,000.00
- Tukang Besi Org/Hari 125,000.00 125,000.00 125,000.00
- Tukang Cat Org/Hari 125,000.00 125,000.00 125,000.00
4 Pekerja
- Pekerja Terlatih Org/Hari 100,000.00 100,000.00 100,000.00
- Pekerja Agak terlatih Org/Hari 100,000.00 100,000.00 100,000.00
- Pekerja Tak terlatih Org/Hari 100,000.00 100,000.00 100,000.00
5 Sopir Org/Hari 150,000.00 150,000.00 150,000.00
6 Pembantu Sopir Org/Hari 100,000.00 100,000.00 100,000.00
7 Operator Alat Berat Org/Hari 350,000.00 350,000.00 350,000.00
8 Pembantu Operator Alat Berat Org/Hari 100,000.00 100,000.00 100,000.00
9 Mekanik Org/Hari 150,000.00 150,000.00 150,000.00
10 Penjaga Malam Org/Hari 50,000.00 50,000.00 50,000.00

KETERANGAN :
1 HARGA BELUM TERMASUK PROFIT, OVERHEAD Dan PPN
2 HARGA BBM MERUPAKAN HARGA INDUSTRI (Sumber PERTAMINA)
3 HARGA KAYU MENGIKUTI HARGA YANG DITETAPKAN OLEH DINAS KEHUTANAN KAB. MUNA

Raha, Desember 2018

Mengetahui Disiapkan Oleh


Kepala Dinas Pekerjaan Umum Panitia Penyusun Analisa Dan Harga Satuan
Kabupaten Muna Dinas Pekerjaan Umum & Penataan Ruang
Ketua,

Drs. ALI BASA, M.Si BAHTIAR, S.Si


NIP. 19611231 198901 1 136 NIP 196312311996031014
II PEKERJAAN TANAH DAN PASIR

1 Galian Fondasi
<> Galian Type 1:
Panjang = 21.40 m
Lebar Atas = 1.10
Lebar Bawah = 0.82
Tinggi = 0.70
(La + Lb)/2 = 0.96 m
(La + Lb)/2) x t = 0.67
(La + Lb)/2) x t x p = 14.38 m3
Volume = 14.38 m3

2 Pek. Urugan Tanah Kembali


Volume = 3.60 m3

3 Pek. Urugan Tanah Alas Lantai


<> Panjang Urugan :
Panjang = 6.50 m
Lebar = 4.20 m
<> Tebal Urugan : = 0.20 m

Volume = 5.46 m3

4 Pek. Urugan Pasir Alas Lantai


<> Panjang Urugan :
Panjang = 6.50 m
Lebar = 4.20 m
<> Tebal Urugan : = 0.10 m
Volume = 2.73 m3

III PEKERJAAN PASANGAN


1 Pasangan Batu Kosong
<> Panjang = 21.40 m
Lebar Atas = 0.90
Lebar Bawah = 0.82
Tinggi = 0.20
(La + Lb)/2 = 0.86 m
(La + Lb)/2) x t = 0.17
(La + Lb)/2) x t x p = 3.68 m3

Volume = 3.68 m3
2 Pasangan Batu 1 : 4
A Pasangan Bata Dinding Datar
<> Panjang = 21.40 m
Lebar Atas = 0.25
Lebar Bawah = 0.70
Tinggi = 0.70
(La + Lb)/2 = 0.48 m
(La + Lb)/2) x t = 0.33
(La + Lb)/2) x t x p = 7.12 m3
Volume = 7.12 m3

3 Pasangan Dinding Bata 1 : 4


Panjang = 14.40 m
Tinggi = 3.35 m
Luas Brutto = 48.24 m2

B Pasangan Bata Kuda - Kuda


Luas Brutto = 4.46 m2

C Pasangan Bata Diatas Teras


Luas Brutto = 1.78 m2
Luas Brutto Tot = 54.48 m2

Luas Pengurang
Kusen Pintu = 1.72 x 2 Bh = 3.44
Kusen Jendela = 0.56 x 13 Bh = 7.28
Ventilasi Atas = 0.15 x 8 Bh = 1.2
Kolom Praktis = 4.52
Jumlah = 16.44
Volume = 38.04 m2

IV PEKERJAAN BETON
1 Pekerjaan Sloof Beton 15/15
A Bekisting
Panjang = 21.40 m1
Lebar = 0.30 m1
Vol = 6.42 m2

B Pembesian
<> Tul. Utama
Panjang = 21.40 m
Jumlah Besi = 4.00 Bh
Jumlah = 85.60 m
Berat Jenis Besi 10 = 0.62 Kg/m
Sub.Vol = 53.07 Kg
<> Tul. Sengkang
Panjang = 21.40 m
Jarak Behel = 0.15 m
Jumlah Behel = 143.67 Bh
Panj / Behel = 0.51 m
Panj. Tot. Besi Behel = 73.27 m
Berat Jenis Besi 6 = 0.22 Kg/m
Sub.Vol = 16.12 Kg
Volume = 69.19 Kg

C Beton
Panjang = 21.40
Lebar = 0.15
Tebal = 0.15
Volume = 0.48 m3

3 Pekerjaan Kolom Praktis 15/15


a Kolom Praktis Normal
Tinggi = 3.65
Jumlah = 8.00 Bh
Sub.Volume = 29.20 m1

2b Kolom Praktis Layang - Layang Bata


Tinggi = 1.91
Jumlah = 2.00 Bh
Sub.Volume = 3.82 m3
Volume = 33.02 m3

3 Pekerjaan Ring Balok 15/15


Panjang Normal = 21.40 m1
Panjang Miring = 5.06 m1
Volume = 26.46 m1

V PEKERJAAN PLESTERAN
1 Pek. Plester Pas.Bata 1 : 4
Volume = 76.08 m2

2 Pek. Plester Muka Fondasi


Volume = 6.21 m2

3 Acian Air Cement


Volume = 6.21 m2

VI PEKERJAAN ATAP
1 Pekerjaan Atap Seng Gelombang Kecil
Panjang = 9.49
Lebar = 9.26
Volume = 87.88 m2
2 Pekerjaan Nook Atap Seng Gelombang Kecil
Volume = 7.59 m2

VII KUDA - KUDA KAYU KELAS I


1 Kuda - Kuda
Pek. Balok Raja = 1.44 m
Pek. Balok Kaki = 5.06 m
Pek. Balok Tarik = 4.99 m
Pek. Balok skoor = 2.00 m
Jumlah = 13.49
Jumlah Unit = 3.00
Jumlah Panjang = 40.47
Sub Vol = 0.39 m3

Pek. Balok Gapit 6/12


= 15.84 m
= 13.56 m
= 29.40 m
Sub Vol = 0.21 m3
Volume = 0.60 m3

2 Gording
Panjang = 8.25 m
Jumlah = 8.00 Bh
Tot Panjang = 66.00 m1
Lebar = 0.06
Tebal = 0.12
Vol = 0.48 m3

3 Rangka Atap
Panjang = 8.25
Lebar = 7.36
Volume = 60.72 m2

4 Lesplank
Panjang Bawah = 8.25 m
Jumlah = 2.00 Bh
Panjang Samping = 3.60 m
Jumlah = 2.00 Bh

Tot Panjang = 23.70 m1


Lebar = 0.20
Vol = 4.74 m2

IV PEKERJAAN PLAFOND DAN RANGKA


1 Rangka Plafond
Bagian Dalam = 25.71 m2
Bagian Luar = 10.98 m2
Volume 36.69 m2

2 Plafond Tripleks
Bagian Dalam = 25.71 m2
Bagian Luar = 10.98 m2
Volume 36.69 m2

3 Les Plafond
X = 32.08 m1
Y = 32.50 m1
64.58 m1
Lebar = 0.04 m1
Volume = 2.58 m2

IV PEKERJAAN KUSEN PINTU KAYU KELAS I


1 Pintu Depan
Panjang = 5.05
Lebar = 0.15
Tebal = 0.05
Jumlah = 2.00
Sub Vol = 0.08 m3

Jendela
Panjang = 3.70
Lebar = 0.15
Tebal = 0.05
Jumlah = 13.00
Sub Vol = 0.36 m3

Layang - Layang
Panjang = 3.79
Lebar = 0.15
Tebal = 0.05
Jumlah = 4.00
Sub Vol = 0.11 m3
Volume = 0.55 m3

2 Pekerjaan Daun Pintu Kayu Kelas I


Tinggi = 1.99 m
Lebar = 0.77 m
Jumlah = 2.00 BH
Volume = 3.06 m2

3 Pekerjaan Daun Jendela Kayu Kelas I


Luas = 0.34 m
Jumlah = 13.00 Bh
Volume = 4.42 m2

4 Pekerjaan Jalusi Kayu Kelas I


Pj1
Panjang = 6.70 m
Lebar = 0.15 m
Jumlah = 2.00 m
Sub.Volume = 0.00 m2

J.1
Panjang = 5.70 m
Lebar = 0.15 m
Jumlah = 3.00 m
Sub.Volume = 0.00 m2

Jalusi Atas
Panjang = 9.54 m
Lebar = 0.15 m
Jumlah = 4.00 m
Sub.Volume = 5.72 m2
Volume = 5.72 m2

IV PEKERJAAN LANTAI
1 Lantai Bagian Dalam
Bagian Dalam = 31.85 m2
Sub. Vol 31.85 m2

2 Teras
Bagian Teras = 8.58 m2
Sub. Vol 8.58 m2
Volume = 40.43 m2
PEMERNTAH KABUPATEN MUNA
DINAS PEDIDIKAN DAN KEBUDAYAAN
JALAN AHMAD YANI NO. 2 KENDARI

DAFTAR HARGA SATUAN BAHAN DAN UPAH


TAHUN 2019

WILAYAH BARAT
NO URAIAN SATUAN
(Rp)

1 2 3
BAHAN TOKO
I SEMEN
1 Semen / PC (50 Kg) Zak 76,950.00
2 Semen Warna Putih/PC (40 Kg) Kg 5,300.00
3 Kapur Pasang Kg 42,500.00
II BAHAN BESI DAN KAWAT
1 Besi Beton / Baja Tulangan Polos U 24 Kg 13,149.00
2 Kawat Beton (Kawat Bindrat) Kg 30,250.00
3 Baut/Mur Kg 28,450.00
4 Paku Campuran (5, 7, 10 cm ) Kg 19,700.00
7 Paku Seng Kg 48,400.00
8 Paku Tripleks Kg 35,100.00
9 Besi Strip m1 80,188.00
10 Paku Kayu Bh 1,000.00
III BAHAN ALMINIUM
1 Besi Holow 20 x 40 mm, Panjang 6 m Btg 18,400.00
2 Besi Holow 40 x 40, Panjang 6 m m1 24,917.00
3 Baut (screw driver) bh 937.00
5 Profil C 75.100 Btg 117,000.00
6 Reng U 0.45 m1 67,000.00
7 Baut Truss BH 450.00
8 Baut Reng BH 400.00
IV BAHAN KERAMIK
1 Keramik Putih 40 x 40 cm BH 11,584.00
2 Keramik Putih 40 x 40 cm Doz 72,400.00
V BAHAN KACA
1 Kaca Bening 3 mm M2 156,400.00
VI BAHAN LANGIT-LANGIT
1 Polywood 9mm Lembar 158,000.00
2 Tripleks 3mm Lembar 62,450.00
VII LIST PROFIL PLAFOND
1 3 x 3 cm panjang 4 m Batang 17,100.00
VIII BAHAN ATAP
1 Genteng Multi Roof Color (77x100 cm) Lembar 42,750.00
2 Nok Genteng Sakura Roof Clasic Std (P=91 cm) BH 37,250.00
IX BAHAN CAT DAN MINYAK
1 Cat Tembok Aries Kg 10,600.00
2 Cat Tembok Metrolite Kg 43,675.00
3 Cat Avian Kg 42,100.00
4 Cat Meni Kayu Besi Kg 22,675.00
5 Plamur Tembok Kg 19,000.00
6 Kwas Rol Buah 36,750.00
7 Minyak Cat Kg 28,450.00
8 Minyak Bekisting Ltr 3,000.00
10 Amplas Halus Lbr 4,200.00
11 Lem Kayu Fox Kg 21100

482
1 2 3
X KUNCI - KUNCI
1 Kunci Tanam 2 Kali Putar T Buah 141,750.00
2 Grendel Jendela Biasa Buah 7,875.00
3 Engsel Pintu H Kuningan Psg 26,250.00
4 Engsel Jendela H Kupu-kupu Kuningan Psg 10,500.00
5 Hak Angin Biasa Buah 6,563.00
XII BAHAN SANITASI
1 Wastafel Dinding Set 459,333.00
2 Pompa Air 450 Watt, Head 9 m Buah 916,667.00
XIII BAHAN PIPA
1 Pipa PVC ø 1/2" AW 4 m Batang 30,993.00
2 Pipa PVC ø3/4" AW 4 m Batang 36,017.00
3 Pipa PVC ø 1" AW 4 m Batang 42,250.00
4 Stop Kran 1/2" Buah 16,500.00
5 Sealent Kg 20,000.00
BAHAN LOKAL
I TANAH TIMBUNAN
3 Tanah Timbunan Biasa M3 77,256.84
II PASIR
1 Pasir Urug M3 139,500.00
2 Pasir pasang M3 139,500.00
3 Pasir Beton M3 217,200.00
III BATU
1 Batu Merah Biji 892.00
2 Kerikil Kali Maligano M3 290,285.26
3 Kerikil Pecah (Maligano Pecah manual) M3 525,000.00
4 Batu Belah 15/25-25/35 cm M3 155,400.00
7 Batu Gunung 2 - 3 cm (Pecah manual) M3 325,000.00
V BAHAN KAYU
1 Papan Kayu Klas II A (Sejenis) M3 2,360,000.00
2 Papan Perancah M3 1,625,000.00
3 Balok Kayu Jati M3 4,250,000.00
4 Balok Kayu Bayam M3 4,250,000.00
5 Balok Kayu Kalapi M3 4,250,000.00
6 Balok Kayu Klas II A (Sejenis) M3 2,360,000.00
7 Balok Kayu Klas II (Sejenis) M3 1,835,000.00
8 Balok Perancah M3 1,625,000.00
9 Dolken Ø 5 Cm Batang 5,750.00
VI ALAT BANTU
1 Alat Bantu Set 2,500.00
UPAH KERJA
1 Mandor Org/Hari 125,000.00
2 Kepala Tukang Org/Hari 150,000.00
3 Tukang
- Tukang Listrik Org/Hari 125,000.00
- Tukang Batu Org/Hari 125,000.00
- Tukang Kayu Org/Hari 125,000.00
- Tukang Besi Org/Hari 125,000.00
- Tukang Cat Org/Hari 125,000.00
4 Pekerja
- Pekerja Terlatih Org/Hari 100,000.00
- Pekerja Agak terlatih Org/Hari 100,000.00
- Pekerja Tak terlatih Org/Hari 100,000.00

Keterangan :
1. Harga BBM Merupakan Harga Industri (Sumber Pertamina)
2. Harga Kayu Diperoleh Dari Penjual Kayu
3. Harga Satuan Belum Termasuk Keuntungan, Over Head dan PPn

483
Jenis Pekerjaan : Pembomgkaran 1m3 Dinding Tembok Bata
Satuan / Unit : m3
Analisa : SNI Rev 2015

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)
A TENAGA :
Pekerja L.01 OH 2.0000 100,000.00 200,000.00
Tukang L.02 OH -
Kepala Tukang L.03 OH -
Mandor L.04 OH 0.0900 125,000.00 11,250.00
Jumlah Tenaga Kerja 211,250.00
B BAHAN :
-
-
-
Jumlah Harga Bahan -
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 211,250.00
E OVERHEAD ₰ PROVIT 10% x D 21,125.00
F HARGA SATUAN PEKERJAAN (D + E) 232,375.00
Jenis Pekerjaan : Pembomgkaran 1m3 Beton Bertulang
Satuan / Unit : m1
Analisa : AHSP PU A.2.2.1.13

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)
A TENAGA :
Pekerja L.01 OH 13.3340 100,000.00 1,333,400.00
Tukang L.02 OH -
Kepala Tukang L.03 OH -
Mandor L.04 OH 0.6660 125,000.00 83,250.00
Jumlah Tenaga Kerja 1,416,650.00
B BAHAN :
-
-
-
Jumlah Harga Bahan -
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 1,416,650.00
E OVERHEAD ₰ PROVIT 10% x D 141,665.00
F HARGA SATUAN PEKERJAAN (D + E) 1,558,315.00
Jenis Pekerjaan : Menurunkan Atap Seng
Satuan / Unit : 10 m2
Analisa : SNI L.8

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)
A TENAGA :
Pekerja L.8.1 OH 0.5000 100,000.00 50,000.00
Tukang OH -
Kepala Tukang OH -
Mandor L.8.1 OH 0.0500 125,000.00 6,250.00
Jumlah Tenaga Kerja 56,250.00
B BAHAN :
-
-
-
Jumlah Harga Bahan -
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 56,250.00
E OVERHEAD ₰ PROVIT 10% x D 5,625.00
F HARGA SATUAN PEKERJAAN (D + E) 6,187.50
Jenis Pekerjaan : Membongkar Rangka Atap Lama
Satuan / Unit : 1m2
Analisa : SNI Rev. 2005

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)
A TENAGA :
Pekerja L.8.1 OH 0.1000 100,000.00 10,000.00
Tukang OH 0.0250 125,000.00 3,125.00
Kepala Tukang OH 0.0025 150,000.00 375.00
Mandor L.8.1 OH 0.0050 125,000.00 625.00
Jumlah Tenaga Kerja 14,125.00
B BAHAN :
-
-
-
Jumlah Harga Bahan -
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 14,125.00
E OVERHEAD ₰ PROVIT 10% x D 1,412.50
F HARGA SATUAN PEKERJAAN (D + E) 15,537.50
Jenis Pekerjaan : Bonkaran Plafond (Bongaran Tidak Dipaakai Laagi)
Satuan / Unit : m2
Analisa : SNI Rev. 2005

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.8.1 OH 0.1250 100,000.00 12,500.00
Tukang OH -
Kepala Tukang OH -
Mandor L.8.1 OH 0.0050 125,000.00 625.00
Jumlah Tenaga Kerja 13,125.00
B BAHAN :
-
-
-
Jumlah Harga Bahan -
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 13,125.00
E OVERHEAD ₰ PROVIT 10% x D 1,312.50
F HARGA SATUAN PEKERJAAN (D + E) 14,437.50
Jenis Pekerjaan : Membongkar Lantai Lama
Satuan / Unit : 1m2
Analisa : SNI Rev. 2005

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)
A TENAGA :
Pekerja L.5.1 OH 0.0500 100,000.00 5,000.00
Tukang -
Kepala Tukang -
Mandor L.5.1 OH 0.0100 125,000.00 1,250.00
Jumlah Tenaga Kerja 6,250.00
B BAHAN :
-
-
-
Jumlah Harga Bahan -
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 6,250.00
E OVERHEAD ₰ PROVIT 10% x D 625.00
F HARGA SATUAN PEKERJAAN (D + E) 6,875.00
Jenis Pekerjaan : Pengukuran Dan Pemasangan Bowplank
Satuan / Unit : m1
Analisa : AHSP PU A.2.2.1.4

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)
A TENAGA :
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang L.02 OH 0.1000 125,000.00 12,500.00
Kepala Tukang L.03 OH 0.0100 150,000.00 1,500.00
Mandor L.04 OH 0.0050 125,000.00 625.00
Jumlah Tenaga Kerja 24,625.00
B BAHAN :
Kayu Balok 5/7 Cm m3 0.1200 -
Paku 2'' - 3'' Kg 0.0200 -
Kayu Papan 3/20 Cm m3 0.0070 -
Jumlah Harga Bahan -
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 24,625.00
E OVERHEAD ₰ PROVIT 10% x D 2,462.50
F HARGA SATUAN PEKERJAAN (D + E) 27,087.50
Jenis Pekerjaan : Galian Tanah Biasa Sedalam 1 m
Satuan / Unit : m3
Analisa : AHSP PU A.2.3.1.1

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 0.7500 125,000.00 93,750.00
Mandor L.04 OH 0.0250 125,000.00 3,125.00
Jumlah Tenaga Kerja 96,875.00
B BAHAN :
-
-
Jumlah Harga Bahan -
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 96,875.00
E OVERHEAD ₰ PROVIT 10% x D 9,687.50
F HARGA SATUAN PEKERJAAN (D + E) 106,562.50
Jenis Pekerjaan : Mengurug Kembali Galian
Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.9

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)
A TENAGA :
Pekerja L.01 OH 0.2500 100,000.00 25,000.00
Mandor L.04 OH 0.0833 125,000.00 10,412.50
Jumlah Tenaga Kerja 35,412.50
B BAHAN :
-
-
Jumlah Harga Bahan -
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 35,412.50
E OVERHEAD ₰ PROVIT 10% x D 3,541.25
F HARGA SATUAN PEKERJAAN (D + E) 38,953.75
Jenis Pekerjaan : Pengurugan Kembali Galian Tanah
Satuan / Unit : m3
Analisa : AHSP PU A.2.3.1.9

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Mandor L.04 OH 0.0100 125,000.00 1,250.00
Jumlah Tenaga Kerja 31,250.00
B BAHAN :
Tanah Timbunan Biasa m3 1.2000 77,256.84 92,708.21
-
Jumlah Harga Bahan 92,708.21
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 123,958.21
E OVERHEAD ₰ PROVIT 10% x D 12,395.82
F HARGA SATUAN PEKERJAAN (D + E) 136,354.03
Jenis Pekerjaan : Urugan Pasir
Satuan / Unit : m3
Analisa : AHSP PU A.2.3.1.11

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)
A TENAGA :
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Mandor L.04 OH 0.0100 125,000.00 1,250.00
Jumlah Tenaga Kerja 31,250.00
B BAHAN :
Pasir Urugan m3 1.2000 139,500.00 167,400.00
-
Jumlah Harga Bahan 167,400.00
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 198,650.00
E OVERHEAD ₰ PROVIT 10% x D 19,865.00
F HARGA SATUAN PEKERJAAN (D + E) 218,515.00
Jenis Pekerjaan : Pemasangan Batu Kosong (Anstamping)
Satuan / Unit : m3
Analisa : AHSP PU A.3.2.1.9

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)
A TENAGA :
Pekerja L.01 OH 0.7800 100,000.00 78,000.00
Tukang L.02 OH 0.3900 125,000.00 48,750.00
Kepala Tukang L.03 OH 0.0390 150,000.00 5,850.00
Mandor L.04 OH 0.0390 125,000.00 4,875.00
Jumlah Tenaga Kerja 137,475.00
B BAHAN :
Batu Belah m3 1.2000 155,400.00 186,480.00
Pasir Urug m3 0.4320 139,500.00 60,264.00
Jumlah Harga Bahan 246,744.00
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 384,219.00
E OVERHEAD ₰ PROVIT 10% x D 38,421.90
F HARGA SATUAN PEKERJAAN (D + E) 422,640.90
Jenis Pekerjaan : Pemasangan Fondasi Batu Belah Camp 1Pc : 4Ps
Satuan / Unit : m3
Analisa : AHSP PU A.3.2.1.2

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)
A TENAGA :
Pekerja L.01 OH 1.5000 100,000.00 150,000.00
Tukang L.02 OH 0.7500 125,000.00 93,750.00
Kepala Tukang L.03 OH 0.0750 150,000.00 11,250.00
Mandor L.04 OH 0.0750 125,000.00 9,375.00
Jumlah Tenaga Kerja 264,375.00
B BAHAN :
Batu Belah m3 1.2000 155,400.00 186,480.00
Semen Portland Kg 163.0000 1,539.00 250,857.00
Pasir Pasang m3 0.5200 139,500.00 72,540.00
Jumlah Harga Bahan 509,877.00
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 774,252.00
E OVERHEAD ₰ PROVIT 10% x D 77,425.20
F HARGA SATUAN PEKERJAAN (D + E) 851,677.20
Jenis Pekerjaan : Pas. Bata Merah 5x11x22 Cm , 1/2 Batu Camp 1 : 2
Satuan / Unit : m2
Analisa : AHSP PU A.3.2.1.7

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)
A TENAGA :
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang L.02 OH 0.1000 125,000.00 12,500.00
Kepala Tukang L.03 OH 0.0100 150,000.00 1,500.00
Mandor L.04 OH 0.0150 125,000.00 1,875.00
Jumlah Tenaga Kerja 45,875.00
B BAHAN :
Bata Merah Buah 70.0000 892.00 62,440.00
Semen Portland Kg 18.9500 1,539.00 29,164.05
Pasir Pasang m3 0.0380 139,500.00 5,301.00
Jumlah Harga Bahan 96,905.05
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 142,780.05
E OVERHEAD ₰ PROVIT 10% x D 14,278.01
F HARGA SATUAN PEKERJAAN (D + E) 157,058.06
Jenis Pekerjaan : Pemasangan Bata 1Pc : 4Ps
Satuan / Unit : m³
Analisa : AHSP PU A.3.2.1.9

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)
A TENAGA :
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang L.02 OH 0.1000 125,000.00 12,500.00
Kepala Tukang L.03 OH 0.0100 150,000.00 1,500.00
Mandor L.04 OH 0.0150 125,000.00 1,875.00
Jumlah Tenaga Kerja 45,875.00
B BAHAN :
Bata Merah Buah 70.0000 892.00 62,440.00
Sement Portland Kg 11.5000 1,539.00 17,698.50
Pasir Pasang m3 0.0430 139,500.00 5,998.50
Jumlah Harga Bahan 86,137.00
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 132,012.00
E OVERHEAD ₰ PROVIT 10% x D 13,201.20
F HARGA SATUAN PEKERJAAN (D + E) 145,213.20
Jenis Pekerjaan : Membat Beton Mutu f ʹc = 14,5 Mpa K.175 Slump 120 ± 20
mm
Satuan / Unit : m3
Analisa : AHSP PU A.4.1.1.5

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)
A TENAGA :
Pekerja L.01 OH 1.6500 100,000.00 165,000.00
Tukang L.02 OH 0.2750 125,000.00 34,375.00
Kepala Tukang L.03 OH 0.0280 150,000.00 4,200.00
Mandor L.04 OH 0.0830 125,000.00 10,375.00
Jumlah Tenaga Kerja 213,950.00
B BAHAN :
Semen Portland Kg 326.0000 1,539.00 501,714.00
Pasir Beton Kg 760.0000 155.14 117,908.57
Kerikil (Max 30 mm) Kg 1,029.0000 388.89 400,166.67
Air Ltr 215.0000 70.00 15,050.00
Jumlah Harga Bahan 1,034,839.24
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 1,248,789.24
E OVERHEAD ₰ PROVIT 10% x D 124,878.92
F HARGA SATUAN PEKERJAAN (D + E) 1,373,668.16

Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg


Jenis Pekerjaan : Membat Lantai Kerja Beton Mutu f ʹc = 7,4 Mpa (3-6 Cm)
Slump (12 **2) Cm, W/C = 0,87
Satuan / Unit : m3
Analisa : AHSP PU A.4.1.1.4

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)
A TENAGA :
Pekerja L.01 OH 1.2000 100,000.00 120,000.00
Tukang L.02 OH 0.2000 125,000.00 25,000.00
Kepala Tukang L.03 OH 0.0200 150,000.00 3,000.00
Mandor L.04 OH 0.0600 125,000.00 7,500.00
Jumlah Tenaga Kerja 155,500.00
B BAHAN :
Semen Portland Kg 230.0000 1,539.00 353,970.00
Pasir Beton Kg 893.0000 155.14 138,542.57
Kerikil (Max 30 mm) Kg 1,027.0000 240.74 247,240.74
Air Ltr 200 70.00 14,000.00
Jumlah Harga Bahan 753,753.31
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 909,253.31
E OVERHEAD ₰ PROVIT 10% x D 90,925.33
F HARGA SATUAN PEKERJAAN (D + E) 1,000,178.64

Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg


Jenis Pekerjaan : Pemasangan Bekisting Untuk Fondasi
Satuan / Unit : m2
Analisa : AHSP PU A.4.1.1.20

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)
A TENAGA :
Pekerja L.01 OH 0.5200 100,000.00 52,000.00
Tukang Kayu L.02 OH 0.2600 125,000.00 32,500.00
Kepala Tukang L.03 OH 0.0260 150,000.00 3,900.00
Mandor L.04 OH 0.0260 125,000.00 3,250.00
Jumlah Tenaga Kerja 91,650.00
B BAHAN :
Kayu Kelas III m3 0.0400 1,625,000.00 65,000.00
Paku 5 - 10 Cm Kg 0.3000 19,700.00 5,910.00
Minyak Bekisting Ltr 0.1000 3,000.00 300.00
Jumlah Harga Bahan 71,210.00
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 162,860.00
E OVERHEAD ₰ PROVIT 10% x D 16,286.00
F HARGA SATUAN PEKERJAAN (D + E) 179,146.00
Jenis Pekerjaan : Pembesian 10 Kg Dengan Besi Polos
Satuan / Unit : Kg
Analisa : AHSP PU A.4.1.1.17

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)
A TENAGA :
Pekerja L.01 OH 0.0700 100,000.00 7,000.00
Tukang Besi L.02 OH 0.0700 125,000.00 8,750.00
Kepala Tukang L.03 OH 0.0070 150,000.00 1,050.00
Mandor L.04 OH 0.0400 125,000.00 5,000.00
21,800.00
B BAHAN :
Besi Beton Polos/ Ulir Kg 10.500 13,149.00 138,064.50
Kawat Beton Kg 0.150 30,250.00 4,537.50
Jumlah Harga Bahan 142,602.00
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 164,402.00
E OVERHEAD ₰ PROVIT 10% x D 16,440.20
F HARGA SATUAN PEKERJAAN PER 1 Kg (D + E) / 10 18,084.22
Jenis Pekerjaan : Membat Beton Mutu f ʹc = 16,9 Mpa K.200 Slump (12 ** 2)
Cm,W/C = 0,61
Satuan / Unit : m3
Analisa : AHSP PU A.4.1.1.6

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 1.6500 100,000.00 165,000.00
Tukang L.02 OH 0.2750 125,000.00 34,375.00
Kepala Tukang L.03 OH 0.0280 150,000.00 4,200.00
Mandor L.04 OH 0.0830 125,000.00 10,375.00
Jumlah Tenaga Kerja 213,950.00
B BAHAN :
Semen Portland Kg 352.0000 1,539.00 541,728.00
Pasir Beton Kg 731.0000 155.14 113,409.43
Kerikil (Max 30 mm) Kg 1,031.0000 240.74 248,203.70
Air Ltr 215.0000 70.00 15,050.00
Jumlah Harga Bahan 918,391.13
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 1,132,341.13
E OVERHEAD ₰ PROVIT 10% x D 113,234.11
F HARGA SATUAN PEKERJAAN (D + E) 1,245,575.25

Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg


Jenis Pekerjaan : Membat Beton Mutu f ʹc = 19,3 Mpa K.225 Slump (12 ** 2)
Cm,W/C = 0,58
Satuan / Unit : m3
Analisa : AHSP PU A.4.1.1.7

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 1.6500 100,000.00 165,000.00
Tukang L.02 OH 0.2750 125,000.00 34,375.00
Kepala Tukang L.03 OH 0.0280 150,000.00 4,200.00
Mandor L.04 OH 0.0830 125,000.00 10,375.00
Jumlah Tenaga Kerja 213,950.00
B BAHAN :
Semen Portland Kg 371.0000 1,539.00 570,969.00
Pasir Beton Kg 698.0000 155.14 108,289.71
Kerikil (Max 30 mm) Kg 1,047.0000 240.74 252,055.56
Air Ltr 215.0000 70.00 15,050.00
Jumlah Harga Bahan 946,364.27
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 1,160,314.27
E OVERHEAD ₰ PROVIT 10% x D 116,031.43
F HARGA SATUAN PEKERJAAN (D + E) 1,276,345.70

Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg


Jenis Pekerjaan : Membat Beton Mutu f ʹc = 21,7 Mpa K.250 Slump (12 ** 2)
Cm,W/C = 0,56
Satuan / Unit : m3
Analisa : AHSP PU A.4.1.1.8

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)
A TENAGA :
Pekerja L.01 OH 1.6500 100,000.00 165,000.00
Tukang L.02 OH 0.2750 125,000.00 34,375.00
Kepala Tukang L.03 OH 0.0280 150,000.00 4,200.00
Mandor L.04 OH 0.0830 125,000.00 10,375.00
Jumlah Tenaga Kerja 213,950.00
B BAHAN :
Semen Portland Kg 384.0000 1,539.00 590,976.00
Pasir Beton Kg 692.0000 155.14 107,358.86
Kerikil (Max 30 mm) Kg 1,039.0000 388.89 404,055.56
Air Ltr 215.0000 70.00 15,050.00
Jumlah Harga Bahan 1,117,440.41
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 1,331,390.41
E OVERHEAD ₰ PROVIT 10% x D 133,139.04
F HARGA SATUAN PEKERJAAN (D + E) 1,464,529.45

Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg


Jenis Pekerjaan : Membat Beton Mutu f ʹc = 24,00 Mpa K.275 Slump (12 ** 2)
Cm,W/C = 0,53
Satuan / Unit : m3
Analisa : AHSP PU A.4.1.1.8

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 1.6500 100,000.00 165,000.00
Tukang L.02 OH 0.2750 125,000.00 34,375.00
Kepala Tukang L.03 OH 0.0280 150,000.00 4,200.00
Mandor L.04 OH 0.0830 125,000.00 10,375.00
Jumlah Tenaga Kerja 213,950.00
B BAHAN :
Semen Portland Kg 406.0000 1,539.00 624,834.00
Pasir Beton Kg 684.0000 155.14 106,117.71
Kerikil (Max 30 mm) Kg 1,026.0000 240.74 247,000.00
Air Ltr 215.0000 70.00 15,050.00
Jumlah Harga Bahan 993,001.71
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 1,206,951.71
E OVERHEAD ₰ PROVIT 10% x D 120,695.17
F HARGA SATUAN PEKERJAAN (D + E) 1,327,646.89

Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg


Jenis Pekerjaan : Membat Beton Mutu f ʹc = 26,4 Mpa K.300 Slump (12 ** 2)
Cm,W/C = 0,53
Satuan / Unit : m3
Analisa : AHSP PU A.4.1.1.8

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 1.6500 100,000.00 165,000.00
Tukang L.02 OH 0.2750 125,000.00 34,375.00
Kepala Tukang L.03 OH 0.0280 150,000.00 4,200.00
Mandor L.04 OH 0.0830 125,000.00 10,375.00
Jumlah Tenaga Kerja 213,950.00
B BAHAN :
Semen Portland Kg 413.00 1,539.00 635,607.00
Pasir Beton Kg 681.00 155.14 105,652.29
Kerikil (Max 30 mm) Kg 1,021.00 240.74 245,796.30
Air Ltr 215.00 70.00 15,050.00
Jumlah Harga Bahan 1,002,105.58
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 1,216,055.58
E OVERHEAD ₰ PROVIT 10% x D 121,605.56
F HARGA SATUAN PEKERJAAN (D + E) 1,337,661.14

Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg


Jenis Pekerjaan : Memasang Bekisting Untuk Sloof
Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.21

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)
A TENAGA :
Pekerja L.01 OH 0.5400 100,000.00 54,000.00
Tukang Kayu L.02 OH 0.2700 125,000.00 33,750.00
Kepala Tukang L.03 OH 0.0270 150,000.00 4,050.00
Mandor L.04 OH 0.0540 125,000.00 6,750.00
Jumlah Tenaga Kerja 98,550.00
B BAHAN :
Kayu Kelas III m3 0.013 1,625,000.00 21,666.67
Paku 5 - 10 Cm Kg 0.400 19,700.00 7,880.00
Minyak Bekisting Ltr 0.200 3,000.00 600.00
Jumlah Harga Bahan 30,146.67
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 128,696.67
E OVERHEAD ₰ PROVIT 10% x D 12,869.67
F HARGA SATUAN PEKERJAAN (D + E) 141,566.33
Jenis Pekerjaan : Memasang Bekisting Untuk Kolom
Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.22

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)
A TENAGA :
Pekerja L.01 OH 0.6600 100,000.00 66,000.00
Tukang Kayu L.02 OH 0.3300 125,000.00 41,250.00
Kepala Tukang L.03 OH 0.0330 150,000.00 4,950.00
Mandor L.04 OH 0.0660 125,000.00 8,250.00
Jumlah Tenaga Kerja 120,450.00
B BAHAN :
Kayu Kelas III m3 0.0133 1,625,000.00 21,666.67
Paku 5 - 10 Cm Kg 0.4000 19,700.00 7,880.00
Minyak Bekisting Ltr 0.2000 3,000.00 600.00
Balok Kayu Kelas II m3 0.0102 1,835,000.00 -
Plywood Tebal 9 mm Lbr 0.3500 158,000.00 -
Dolken @ 4 -10 Pnj 4 m Btg 0.6667 5,750.00 3,833.33
Jumlah Harga Bahan 33,980.00
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 154,430.00
E OVERHEAD ₰ PROVIT 10% x D 15,443.00
F HARGA SATUAN PEKERJAAN (D + E) 169,873.00
Jenis Pekerjaan : Pemasangan Bekisting Untuk Balok
Satuan / Unit : m2
Analisa : AHSP PU A.4.1.23

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)
A TENAGA :
Pekerja L.01 OH 0.6600 100,000.00 66,000.00
Tukang Kayu L.02 OH 0.3300 125,000.00 41,250.00
Kepala Tukang L.03 OH 0.0330 150,000.00 4,950.00
Mandor L.04 OH 0.0660 125,000.00 8,250.00
Jumlah Tenaga Kerja 120,450.00
B BAHAN :
Kayu Kelas III m3 0.0133 1,625,000.00 21,666.67
Paku 5 - 10 Cm Kg 0.4000 19,700.00 7,880.00
Minyak Bekisting Ltr 0.2000 3,000.00 600.00
Balok Kayu Kelas II m3 0.0102 2,360,000.00 24,072.00
Plywood Tebal 9 mm Lbr 0.3500 158,000.00 55,300.00
Dolken @ 4 -10 Pnj 4 m Btg 0.6667 5,750.00 3,833.33
Jumlah Harga Bahan 113,352.00
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 233,802.00
E OVERHEAD ₰ PROVIT 10% x D 23,380.20
F HARGA SATUAN PEKERJAAN (D + E) 257,182.20
Jenis Pekerjaan : Pemasangan Bekisting Untuk Lantai
Satuan / Unit : m2
Analisa : AHSP PU A.4.1.24

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)
A TENAGA :
Pekerja L.01 OH 0.6600 100,000.00 66,000.00
Tukang Kayu L.02 OH 0.3300 125,000.00 41,250.00
Kepala Tukang L.03 OH 0.0330 150,000.00 4,950.00
Mandor L.04 OH 0.0330 125,000.00 4,125.00
Jumlah Tenaga Kerja 116,325.00
B BAHAN :
Kayu Kelas III m3 0.0400 1,625,000.00 65,000.00
Paku 5 - 10 Cm Kg 0.4000 19,700.00 7,880.00
Minyak Bekisting Ltr 0.2000 3,000.00 600.00
Balok Kayu Kelas II m3 0.0150 2,360,000.00 35,400.00
Plywood Tebal 9 mm Lbr 0.3500 62,450.00 21,857.50
Dolken @ 4 -10 Pnj 4 m Btg 6.0000 5,750.00 34,500.00
Jumlah Harga Bahan 165,237.50
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 281,562.50
E OVERHEAD ₰ PROVIT 10% x D 28,156.25
F HARGA SATUAN PEKERJAAN (D + E) 309,718.75
Jenis Pekerjaan : Pemasangan Bekisting Untuk Tangga
Satuan / Unit : m2
Analisa : AHSP PU A.4.1.1.26

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 0.6600 100,000.00 66,000.00
Tukang Kayu L.02 OH 0.3300 125,000.00 41,250.00
Kepala Tukang L.03 OH 0.0330 150,000.00 4,950.00
Mandor L.04 OH 0.0330 125,000.00 4,125.00
Jumlah Tenaga Kerja 116,325.00
B BAHAN :
Kayu Kelas III m3 0.0300 1,625,000.00 48,750.00
Paku 5 - 10 Cm Kg 0.4000 19,700.00 7,880.00
Minyak Bekisting Ltr 0.1500 3,000.00 450.00
Balok Kayu Kelas II m3 0.0150 2,360,000.00 35,400.00
Plywood Tebal 9 mm Lbr 0.3500 158,000.00 55,300.00
Dolken @ 4 -10 Pnj 4 m Btg 2.0000 5,750.00 11,500.00
Jumlah Harga Bahan 159,280.00
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 275,605.00
E OVERHEAD ₰ PROVIT 10% x D 27,560.50
F HARGA SATUAN PEKERJAAN (D + E) 303,165.50
Jenis Pekerjaan : Membuat Kolom Praktis Ukr. 11 x 11 Cm
Satuan / Unit : m1
Analisa : AHSP PU A.4.1.1.35

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)
A TENAGA :
Pekerja L.01 OH 0.1800 100,000.00 18,000.00
Tukang Batu L.02 OH 0.0200 125,000.00 2,500.00
Tukang Kayu L.02 OH 0.0200 125,000.00 2,500.00
Tukang Besi L.02 OH 0.0200 125,000.00 2,500.00
Kepala Tukang L.03 OH 0.0600 150,000.00 9,000.00
Mandor L.04 OH 0.0900 125,000.00 11,250.00
Jumlah Tenaga Kerja 45,750.00
B BAHAN :
Kayu Kelas III m3 0.0020 1,625,000.00 3,250.00
Paku 5 - 10 Cm Kg 0.0100 19,700.00 197.00
Minyak Bekisting Ltr 1.0000 3,000.00 3,000.00
Besi Beton Polos Kg 3.0000 13,149.00 39,447.00
Kawat Beton Kg 0.4500 30,250.00 13,612.50
Semen Portland Kg 4.0000 1,539.00 6,156.00
Pasir Beton m3 0.0060 217,200.00 1,303.20
Kerikil m3 0.0090 525,000.00 4,725.00
Jumlah Harga Bahan 71,690.70
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 117,440.70
E OVERHEAD ₰ PROVIT 10% x D 11,744.07
F HARGA SATUAN PEKERJAAN (D + E) 129,184.77

Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg


Jenis Pekerjaan : Membuat Ring Balok Beton Bertulang
Satuan / Unit : m1
Analisa : AHSP PU A.4.1.1.36

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)
A TENAGA :
Pekerja L.01 OH 0.1800 100,000.00 18,000.00
Tukang Batu L.02 OH 0.0200 125,000.00 2,500.00
Tukang Kayu L.02 OH 0.0200 125,000.00 2,500.00
Tukang Besi L.02 OH 0.0200 125,000.00 2,500.00
Kepala Tukang L.03 OH 0.0600 150,000.00 9,000.00
Mandor L.04 OH 0.0900 125,000.00 11,250.00
Jumlah Tenaga Kerja 45,750.00
B BAHAN :
Kayu Kelas III m3 0.0020 1,625,000.00 3,250.00
Paku 5 - 10 Cm Kg 0.0100 19,700.00 197.00
Minyak Bekisting Ltr 1.0000 3,000.00 3,000.00
Besi Beton Polos Kg 3.0000 13,149.00 39,447.00
Kawat Beton Kg 0.4500 30,250.00 13,612.50
Semen Portland Kg 4.0000 1,539.00 6,156.00
Pasir Beton m3 0.0060 217,200.00 1,303.20
Kerikil m3 0.0090 525,000.00 4,725.00
Jumlah Harga Bahan 71,690.70
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 117,440.70
E OVERHEAD ₰ PROVIT 10% x D 11,744.07
F HARGA SATUAN PEKERJAAN (D + E) 129,184.77

Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg


Jenis Pekerjaan : Plesteran 1 Sp : 2 Pp, Tebal 15 mm
Satuan / Unit : m2
Analisa : AHSP PU A.4.4.2.2

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)
A TENAGA :
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang L.02 OH 0.1500 125,000.00 18,750.00
Kepala Tukang L.03 OH 0.0150 150,000.00 2,250.00
Mandor L.04 OH 0.0150 125,000.00 1,875.00
Jumlah Tenaga Kerja 52,875.00
B BAHAN :
Sement Portland Kg 10.2240 1,539.00 15,734.74
Pasir Pasangan m3 0.0200 139,500.00 2,790.00
Jumlah Harga Bahan 18,524.74
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 71,399.74
E OVERHEAD ₰ PROVIT 10% x D 7,139.97
F HARGA SATUAN PEKERJAAN (D + E) 78,539.71
Jenis Pekerjaan : Plesteran 1 Sp : 3 Pp, Tebal 15 mm
Satuan / Unit : m2
Analisa : AHSP PU A.4.4.2.3

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)
A TENAGA :
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang L.02 OH 0.1500 125,000.00 18,750.00
Kepala Tukang L.03 OH 0.0150 150,000.00 2,250.00
Mandor L.04 OH 0.0150 125,000.00 1,875.00
Jumlah Tenaga Kerja 52,875.00
B BAHAN :
Sement Portland Kg 7.7760 1,539.00 11,967.26
Pasir Pasangan m3 0.0230 139,500.00 3,208.50
Jumlah Harga Bahan 15,175.76
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 68,050.76
E OVERHEAD ₰ PROVIT 10% x D 6,805.08
F HARGA SATUAN PEKERJAAN (D + E) 74,855.84
Jenis Pekerjaan : Plesteran 1 Sp : 4 Pp, Tebal 15 mm
Satuan / Unit : m2
Analisa : AHSP PU A.4.4.2.4

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)
A TENAGA :
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang L.02 OH 0.1500 125,000.00 18,750.00
Kepala Tukang L.03 OH 0.0150 150,000.00 2,250.00
Mandor L.04 OH 0.0150 125,000.00 1,875.00
Jumlah Tenaga Kerja 52,875.00
B BAHAN :
Sement Portland Kg 6.2400 1,539.00 9,603.36
Pasir Pasangan m3 0.0240 139,500.00 3,348.00
Jumlah Harga Bahan 12,951.36
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 65,826.36
E OVERHEAD ₰ PROVIT 10% x D 6,582.64
F HARGA SATUAN PEKERJAAN (D + E) 72,409.00
Jenis Pekerjaan : Acian Air Cement
Satuan / Unit : m2
Analisa : AHSP PU A.4.4.2.27

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)
A TENAGA :
Pekerja L.01 OH 0.2000 100,000.00 20,000.00
Tukang L.02 OH 0.1000 125,000.00 12,500.00
Kepala Tukang L.03 OH 0.0100 150,000.00 1,500.00
Mandor L.04 OH 0.0100 125,000.00 1,250.00
Jumlah Tenaga Kerja 35,250.00
B BAHAN :
Sement Portland Kg 3.2500 1,539.00 5,001.75
Jumlah Harga Bahan 5,001.75
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 40,251.75
E OVERHEAD ₰ PROVIT 10% x D 4,025.18
F HARGA SATUAN PEKERJAAN (D + E) 44,276.93
Jenis Pekerjaan : Pasang Lantai Ubin Warna Ukr 40 x 40 Cm
Satuan / Unit : m2
Analisa : AHSP PU A.4.4.3.4

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)
A TENAGA :
Pekerja L.01 OH 0.2500 100,000.00 25,000.00
Tukang L.02 OH 0.1250 125,000.00 15,625.00
Kepala Tukang L.03 OH 0.0130 150,000.00 1,950.00
Mandor L.04 OH 0.0130 125,000.00 1,625.00
Jumlah Tenaga Kerja 44,200.00
B BAHAN :
Ubin Warna Bh 6.6300 11,584.00 76,801.92
Sement Portland Kg 9.8000 1,539.00 15,082.20
Sement Warna Kg 0.6000 5,300.00 3,180.00
Pasir Pasang m3 0.0450 139,500.00 6,277.50
Jumlah Harga Bahan 101,341.62
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 145,541.62
E OVERHEAD ₰ PROVIT 10% x D 14,554.16
F HARGA SATUAN PEKERJAAN (D + E) 160,095.78
Jenis Pekerjaan : Pengecatan Bidang Kayu Baru (1 Lapis Plamuur, 1 Lapis Cat
Dasar 2 Kali Cat Penutup
Satuan / Unit : m2
Analisa : AHSP PU A.4.7.1.4

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)
A TENAGA :
Pekerja L.01 OH 0.0700 100,000.00 7,000.00
Tukang Cat L.02 OH 0.0090 125,000.00 1,125.00
Kepala Tukang L.03 OH 0.0060 150,000.00 900.00
Mandor L.04 OH 0.0030 125,000.00 375.00
Jumlah Tenaga Kerja 9,400.00
B BAHAN :
Cat Menie Kayu/ Besi Kg 0.2000 22,675.00 4,535.00
Plamuur Tembok Boyo Kg 0.1500 19,000.00 2,850.00
Cat Dasar Meni Kayu/ Besi Kg 0.1700 10,600.00 1,802.00
Cat Penutup Kayu Avian Kg 0.2600 42,100.00 10,946.00
Kuas Buah 0.0100 36,750.00 367.50
Pengencer ( Minyak Cat) Kg 0.0300 28,450.00 853.50
Amplas Lbr 0.2000 4,200.00 840.00
Jumlah Harga Bahan 22,194.00
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 31,594.00
E OVERHEAD ₰ PROVIT 10% x D 3,159.40
F HARGA SATUAN PEKERJAAN (D + E) 34,753.40
Jenis Pekerjaan : Pengecatan Tembok Baru (1 Lapis Plamuur, 1 Lapis Cat Dasar
2 Kali Cat Penutup
Satuan / Unit : m2
Analisa : AHSP PU A.4.7.1.10

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)
A TENAGA :
Pekerja L.01 OH 0.0200 100,000.00 2,000.00
Tukang Cat L.02 OH 0.0630 125,000.00 7,875.00
Kepala Tukang L.03 OH 0.0063 150,000.00 945.00
Mandor L.04 OH 0.0030 125,000.00 375.00
Jumlah Tenaga Kerja 11,195.00
B BAHAN :
Plamuur Kg 0.1000 19,000.00 1,900.00
Cat Dasar (Mowilex) Kg 0.1000 10,600.00 1,060.00
Cat Penutup (Aquqlistik) Kg 0.2600 43,675.00 11,355.50
Jumlah Harga Bahan 14,315.50
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 25,510.50
E OVERHEAD ₰ PROVIT 10% x D 2,551.05
F HARGA SATUAN PEKERJAAN (D + E) 28,061.55
Jenis Pekerjaan : Pengecatan Permukaan Baja Dengan Meni Besi
Satuan / Unit : m2
Analisa : AHSP PU A.4.7.1.16

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)
A TENAGA :
Pekerja L.01 OH 0.0200 100,000.00 2,000.00
Tukang Cat L.02 OH 0.2000 125,000.00 25,000.00
Kepala Tukang L.03 OH 0.0200 150,000.00 3,000.00
Mandor L.04 OH 0.0025 125,000.00 312.50
Jumlah Tenaga Kerja 30,312.50
B BAHAN :
Meni Besi Kg 0.1000 22,675.00 2,267.50
Kwas Bh 0.0100 36,750.00 367.50
Jumlah Harga Bahan 2,635.00
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 32,947.50
E OVERHEAD ₰ PROVIT 10% x D 3,294.75
F HARGA SATUAN PEKERJAAN (D + E) 36,242.25
Jenis Pekerjaan : Pemasangan Rangka Besi Holow 1.40.40. 2Cm Modul 60 x 120
Dinding Partisi
Satuan / Unit : m2
Analisa : AHSP PU A.4.2.1.20

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)
A TENAGA :
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang L.02 OH 0.1000 125,000.00 12,500.00
Kepala Tukang L.03 OH 0.0100 150,000.00 1,500.00
Mandor L.04 OH 0.0050 125,000.00 625.00
Jumlah Tenaga Kerja 24,625.00
B BAHAN :
Metal Holow 40.40.2 mm m1 3.5000 18,400.00 64,400.00
(Aksesories Perkuatan Las Ls 100 % x 18,400.00 64,400.00
Dan Lain - Lain) Rangka

Jumlah Harga Bahan 128,800.00


C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 153,425.00
E OVERHEAD ₰ PROVIT 10% x D 15,342.50
F HARGA SATUAN PEKERJAAN (D + E) 168,767.50
Jenis Pekerjaan : Memasang Atap Seng Genteng Metal
Satuan / Unit : m2
Analisa : AHSP PU A.4.5.2.33

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)
A TENAGA :
Pekerja L.01 OH 0.2000 100,000.00 20,000.00
Tukang L.02 OH 0.1000 125,000.00 12,500.00
Kepala Tukang L.03 OH 0.0100 150,000.00 1,500.00
Mandor L.04 OH 0.0010 125,000.00 125.00
Jumlah Tenaga Kerja 34,125.00
B BAHAN :
Atap Genteng Metal Lbr 1.0200 42,750.00 43,605.00
Paku Seng Kg 0.2000 48,400.00 43,605.00

Jumlah Harga Bahan 87,210.00


C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 121,335.00
E OVERHEAD ₰ PROVIT 10% x D 12,133.50
F HARGA SATUAN PEKERJAAN (D + E) 133,468.50
Jenis Pekerjaan : Rangka Kuda-kuda Aluzing Aluminium untuk Metal
Satuan / Unit : M2
Analisa : AHSP PU A.4.5.2.32

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)
A TENAGA :
Pekerja L.01 OH 0.1400 100,000.00 14,000.00
Tukang L.02 OH 0.4000 125,000.00 50,000.00
Kepala Tukang L.03 OH 0.0400 150,000.00 6,000.00
Mandor L.04 OH 0.0700 125,000.00 8,750.00
Jumlah Tenaga Kerja 78,750.00
B BAHAN :
Profil C 75.100 m' 4.2600 19,500.00 83,070.00
Reng U 0.45 m' 4.9300 19,500.00 96,135.00
Baut Truss bh 14.0000 450.00 6,300.00
Jumlah Harga Bahan 185,505.00
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 264,255.00
E OVERHEAD ₰ PROVIT 10% x D 26,425.50
F HARGA SATUAN PEKERJAAN (D + E) 290,680.50
Jenis Pekerjaan : Memasang Konstruksi Kuda-Kuda, Kayu Kelas I
Satuan / Unit : M3
Analisa : AHSP PU A.4.6.1.14

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 6.7000 100,000.00 670,000.00
Tukang L.02 OH 20.1000 125,000.00 2,512,500.00
Kepala Tukang L.03 OH 2.0100 150,000.00 301,500.00
Mandor L.04 OH 0.3350 125,000.00 41,875.00
Jumlah Tenaga Kerja 3,525,875.00
B BAHAN :
Balok Kayu Kelas I m3 1.100 4,250,000.00 4,675,000.00
Besi Strip Tebal 5 mm Kg 15.000 1,603.76 24,056.40
Paku Kayu Kg 5.600 1,000.00 5,600.00
Jumlah Harga Bahan 4,704,656.40
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 8,230,531.40
E OVERHEAD ₰ PROVIT 10% x D 823,053.14
F HARGA SATUAN PEKERJAAN (D + E) 9,053,584.54

Jenis Pekerjaan : Pek. 1 M3 Pasang Konstruksi Gording/Balok Jepit/Balok Konsol Kayu


Bisulo/Pontoh/ Sejenisnya
Satuan / Unit : m2
Analisa : SNI 2008

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 2.4000 100,000.00 240,000.00
Tukang L.02 OH 7.2000 125,000.00 900,000.00
Kepala Tukang L.03 OH 0.7200 150,000.00 108,000.00
Mandor L.04 OH 0.1200 125,000.00 15,000.00
Jumlah Tenaga Kerja 1,263,000.00
B BAHAN :
Balok Kayu Kelas I m3 1.100 4,250,000.00 4,675,000.00
Paku Campur m' 3.000 19,700.00 59,100.00

Jumlah Harga Bahan 4,734,100.00


C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 5,997,100.00
E OVERHEAD ₰ PROVIT 10% x D 599,710.00
F HARGA SATUAN PEKERJAAN (D + E) 6,596,810.00

Jenis Pekerjaan : Pek. 1 M2 Pasang Rangka atap Sakura Roof


Satuan / Unit : m2
Analisa : SNI 2008

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang L.02 OH 0.1000 125,000.00 12,500.00
Kepala Tukang L.03 OH 0.0100 150,000.00 1,500.00
Mandor L.04 OH 0.0050 125,000.00 625.00
Jumlah Tenaga Kerja 24,625.00
B BAHAN :
Kaso-kaso (5 x 7 ) cm m3 0.014 2,360,000.00 33,040.00
Reng (3x4) cm m3 0.007 4,250,000.00 30,600.00
Paku Campur Kg 0.250 19,700.00 4,925.00
Jumlah Harga Bahan 68,565.00
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 93,190.00
E OVERHEAD ₰ PROVIT 10% x D 9,319.00
F HARGA SATUAN PEKERJAAN (D + E) 102,509.00

Jenis Pekerjaan : Memasang Atap 1 M2 Atap Seng Zincalume


Satuan / Unit : m2
Analisa : AHSP PU A.4.5.2.32

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 0.0750 100,000.00 7,500.00
Tukang L.02 OH 0.1000 125,000.00 12,500.00
Kepala Tukang L.03 OH 0.0200 150,000.00 3,000.00
Mandor L.04 OH 0.0025 125,000.00 312.50
Jumlah Tenaga Kerja 23,312.50
B BAHAN :
Atap Genteng Metal Lbr 0.7000 42,750.00 29,925.00
Paku Seng Kg 6.0000 48,400.00 29,925.00

Jumlah Harga Bahan 59,850.00


C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 83,162.50
E OVERHEAD ₰ PROVIT 10% x D 8,316.25
F HARGA SATUAN PEKERJAAN (D + E) 91,478.75

Jenis Pekerjaan : Memasang Rabung Genteng Metal


Satuan / Unit : m¹
Analisa : AHSP PU A.4.5.2.36

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 0.2500 100,000.00 25,000.00
Tukang L.02 OH 0.1500 125,000.00 18,750.00
Kepala Tukang L.03 OH 0.0150 150,000.00 2,250.00
Mandor L.04 OH 0.0130 125,000.00 1,625.00
Jumlah Tenaga Kerja 47,625.00
B BAHAN :
Rabung Genteng Metal Lbr 1.1000 37,250.00 40,975.00
Paku Seng Kg 0.0500 48,400.00 40,975.00

Jumlah Harga Bahan 81,950.00


C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 129,575.00
E OVERHEAD ₰ PROVIT 10% x D 12,957.50
F HARGA SATUAN PEKERJAAN (D + E) 142,532.50

Jenis Pekerjaan : Membuat dan Memasang Kusen pintu dan Kusen Jendela,
Kayu Kelas I
Satuan / Unit : M3
Analisa : AHSP PU A.4.6.1.1

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 7.0000 100,000.00 700,000.00
Tukang L.02 OH 21.0000 125,000.00 2,625,000.00
Kepala Tukang L.03 OH 2.1000 150,000.00 315,000.00
Mandor L.04 OH 0.3500 125,000.00 43,750.00
Jumlah Tenaga Kerja 3,683,750.00
B BAHAN :
Balok Kayu Kelas I m³ 1.1000 4,250,000.00 4,675,000.00
Paku Kayu Kg 1.2500 19,700.00 24,625.00
Lem Kayu Kg 1.0000 21,100.00 21,100.00
Jumlah Harga Bahan 4,720,725.00
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 8,404,475.00
E OVERHEAD ₰ PROVIT 10% x D 840,447.50
F HARGA SATUAN PEKERJAAN (D + E) 9,244,922.50

Jenis Pekerjaan : Membuat dan Memasang Daun , Kayu Kelas I


Satuan / Unit : M3
Analisa : AHSP PU A.4.6.1.5

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 1.0000 100,000.00 100,000.00
Tukang L.02 OH 3.0000 125,000.00 375,000.00
Kepala Tukang L.03 OH 0.3000 150,000.00 45,000.00
Mandor L.04 OH 0.0500 125,000.00 6,250.00
Jumlah Tenaga Kerja 526,250.00
B BAHAN :
Papan Kayu Kls I m³ 0.0400 4,250,000.00 170,000.00
Lem Kayu Kg 0.5000 21,100.00 10,550.00
Jumlah Harga Bahan 180,550.00
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 706,800.00
E OVERHEAD ₰ PROVIT 10% x D 70,680.00
F HARGA SATUAN PEKERJAAN (D + E) 777,480.00

Jenis Pekerjaan : Membuat dan Memasang Daun Jendela, Kayu Kelas I


Satuan / Unit : M3
Analisa : AHSP PU A.4.6.1.6

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 0.8000 100,000.00 80,000.00
Tukang L.02 OH 2.4000 125,000.00 300,000.00
Kepala Tukang L.03 OH 0.2400 150,000.00 36,000.00
Mandor L.04 OH 0.0400 125,000.00 5,000.00
Jumlah Tenaga Kerja 421,000.00
B BAHAN :
Papan Kayu Kls I m³ 0.0240 4,250,000.00 102,000.00
Lem Kayu Kg 0.3000 21,100.00 6,330.00
Jumlah Harga Bahan 108,330.00
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 529,330.00
E OVERHEAD ₰ PROVIT 10% x D 52,933.00
F HARGA SATUAN PEKERJAAN (D + E) 582,263.00

Jenis Pekerjaan : Memasang Jalusi, Kayu Kelas I


Satuan / Unit : M²
Analisa : AHSP PU A.4.6.1.1.0

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 0.6700 100,000.00 67,000.00
Tukang L.02 OH 2.0000 125,000.00 250,000.00
Kepala Tukang L.03 OH 0.2000 150,000.00 30,000.00
Mandor L.04 OH 0.3350 125,000.00 41,875.00
Jumlah Tenaga Kerja 388,875.00
B BAHAN :
Papan Kayu Kls I m³ 0.0600 4,250,000.00 255,000.00
Lem Kayu Kg 0.1500 21,100.00 3,165.00
Jumlah Harga Bahan 258,165.00
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 647,040.00
E OVERHEAD ₰ PROVIT 10% x D 64,704.00
F HARGA SATUAN PEKERJAAN (D + E) 711,744.00

Jenis Pekerjaan :
Memasang Listplank Uk. 2 x 30 Cm Kayu Kelas I atau Klas II

Satuan / Unit : M2
Analisa : AHSP PU A.4.5.2.32

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)
A TENAGA :
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang L.02 OH 0.2000 125,000.00 25,000.00
Kepala Tukang L.03 OH 0.0200 150,000.00 3,000.00
Mandor L.04 OH 0.0050 125,000.00 625.00
Jumlah Tenaga Kerja 38,625.00
B BAHAN :
Papan Kayu Kelas II m3 0.0110 2,360,000.00 25,960.00
Paku Kayu Kg 0.0500 19,700.00 25,960.00
Jumlah Harga Bahan 51,920.00
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 90,545.00
E OVERHEAD ₰ PROVIT 10% x D 9,054.50
F HARGA SATUAN PEKERJAAN (D + E) 99,599.50

Jenis Pekerjaan : Memasang 1 m2 Kaca tebal 3 mm


Satuan / Unit : M2
Analisa : AHSP PU A.4.6.2.16

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 0.0150 100,000.00 1,500.00
Tukang L.02 OH 0.1500 125,000.00 18,750.00
Kepala Tukang L.03 OH 0.0150 150,000.00 2,250.00
Mandor L.04 OH 0.0080 125,000.00 1,000.00
Jumlah Tenaga Kerja 23,500.00
B BAHAN :
Kaca Bening 3 mm m2 1.1000 156,400.00 172,040.00
Sealent Kg 0.0500 20,000.00 172,040.00

Jumlah Harga Bahan 344,080.00


C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 367,580.00
E OVERHEAD ₰ PROVIT 10% x D 36,758.00
F HARGA SATUAN PEKERJAAN (D + E) 404,338.00

Jenis Pekerjaan : Memasang Rangka Langit-Langit Kayu Kls II Modul 120 x


120
Satuan / Unit : M2
Analisa : AHSP PU A.4.5.1.5a

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 0.1500 100,000.00 15,000.00
Tukang L.02 OH 0.3000 125,000.00 37,500.00
Kepala Tukang L.03 OH 0.0300 150,000.00 4,500.00
Mandor L.04 OH 0.7500 125,000.00 93,750.00
Jumlah Tenaga Kerja 150,750.00
B BAHAN :
Kayu Kelas II m3 0.0154 1,835,000.00 28,259.00
Paku 5,7 & 10 Kg 0.2000 19,700.00 3,940.00
Jumlah Harga Bahan 32,199.00
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 182,949.00
E OVERHEAD ₰ PROVIT 10% x D 18,294.90
F HARGA SATUAN PEKERJAAN (D + E) 201,243.90

Jenis Pekerjaan : Memasang Langit - Langit Tripleks Modul 120 x 120


Satuan / Unit : M2
Analisa : AHSP PU A.4.5.1.5a

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang L.02 OH 0.1000 125,000.00 12,500.00
Kepala Tukang L.03 OH 0.0100 150,000.00 1,500.00
Mandor L.04 OH 0.0050 125,000.00 625.00
Jumlah Tenaga Kerja 24,625.00
B BAHAN :
Tripleks 3mm Lbr 0.3750 62,450.00 23,418.75
Paku Tripleks Kg 0.0300 35,100.00 1,053.00
Jumlah Harga Bahan 24,471.75
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 49,096.75
E OVERHEAD ₰ PROVIT 10% x D 4,909.68
F HARGA SATUAN PEKERJAAN (D + E) 54,006.43

Jenis Pekerjaan : Memasang List Profil Kayu


Satuan / Unit : M2
Analisa : AHSP PU A.4.5.1.9

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 0.0500 100,000.00 5,000.00
Tukang L.02 OH 0.0500 125,000.00 6,250.00
Kepala Tukang L.03 OH 0.0050 150,000.00 750.00
Mandor L.04 OH 0.0030 125,000.00 375.00
Jumlah Tenaga Kerja 12,375.00
B BAHAN :
Lis Kayu Profil Lbr 1.0500 17,100.00 17,955.00
Paku Campur Kg 0.0100 19,700.00 17,955.00
Jumlah Harga Bahan 35,910.00
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 48,285.00
E OVERHEAD ₰ PROVIT 10% x D 4,828.50
F HARGA SATUAN PEKERJAAN (D + E) 53,113.50

Jenis Pekerjaan : Pemasangan Kunci Tanam Biasa


Satuan / Unit : BH
Analisa : AHSP PU A.4.6.2.2

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 0.0100 100,000.00 1,000.00
Tukang Kayu L.02 OH 0.5000 125,000.00 62,500.00
Kepala Tukang L.03 OH 0.0500 150,000.00 7,500.00
Mandor L.04 OH 0.0050 125,000.00 625.00
Jumlah Tenaga Kerja 71,625.00
B BAHAN :
Kunci Tanam BH 1.0000 141,750.00 141,750.00
-
-
Jumlah Harga Bahan 141,750.00
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 213,375.00
E OVERHEAD ₰ PROVIT 10% x D 21,337.50
F HARGA SATUAN PEKERJAAN (D + E) 234,712.50

Jenis Pekerjaan : Memasang Engsel Pintu


Satuan / Unit : Buah
Analisa : AHSP PU A.4.6.2.5

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 0.0150 100,000.00 1,500.00
Tukang Kayu L.02 OH 0.1500 125,000.00 18,750.00
Kepala Tukang L.03 OH 0.0150 150,000.00 2,250.00
Mandor L.04 OH 0.0008 125,000.00 100.00
Jumlah Tenaga Kerja 22,600.00
B BAHAN :
Engsel Pintu BH 1.0000 26,250.00 26,250.00
-
-
Jumlah Harga Bahan 26,250.00
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 48,850.00
E OVERHEAD ₰ PROVIT 10% x D 4,885.00
F HARGA SATUAN PEKERJAAN (D + E) 53,735.00

Jenis Pekerjaan : Memasang Engsel Jendela Kupu-Kupu


Satuan / Unit : Buah
Analisa : AHSP PU A.4.6.2.6

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 0.0150 100,000.00 1,500.00
Tukang Kayu L.02 OH 0.1500 125,000.00 18,750.00
Kepala Tukang L.03 OH 0.0150 150,000.00 2,250.00
Mandor L.04 OH 0.0008 125,000.00 100.00
Jumlah Tenaga Kerja 22,600.00
B BAHAN :
Engsel Jendela BH 1.0000 10,500.00 10,500.00
-
-
Jumlah Harga Bahan 10,500.00
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 33,100.00
E OVERHEAD ₰ PROVIT 10% x D 3,310.00
F HARGA SATUAN PEKERJAAN (D + E) 36,410.00

Jenis Pekerjaan : Memasang Hak/Kait Angin Jendela


Satuan / Unit : Buah
Analisa : AHSP PU A.4.6.2.9

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 0.0150 100,000.00 1,500.00
Tukang Kayu L.02 OH 0.1500 125,000.00 18,750.00
Kepala Tukang L.03 OH 0.0150 150,000.00 2,250.00
Mandor L.04 OH 0.0008 125,000.00 100.00
Jumlah Tenaga Kerja 22,600.00
B BAHAN :
Kait Angin BH 1.0000 6,563.00 6,563.00
-
-
Jumlah Harga Bahan 6,563.00
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 29,163.00
E OVERHEAD ₰ PROVIT 10% x D 2,916.30
F HARGA SATUAN PEKERJAAN (D + E) 32,079.30

Jenis Pekerjaan : Pemasangan Spring Knip


Satuan / Unit : BH
Analisa : AHSP PU A.4.6.2.8

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 0.0150 100,000.00 1,500.00
Tukang Kayu L.02 OH 0.1500 125,000.00 18,750.00
Kepala Tukang L.03 OH 0.0150 150,000.00 2,250.00
Mandor L.04 OH 0.0080 125,000.00 1,000.00
Jumlah Tenaga Kerja 23,500.00
B BAHAN :
Grendel Pintu BH 1.0000 7,875.00 7,875.00
-
-
Jumlah Harga Bahan 7,875.00
C PERALATAN :
-
-
Jumlah Harga Alat -
D JUMLAH A + B + C 31,375.00
E OVERHEAD ₰ PROVIT 10% x D 3,137.50
F HARGA SATUAN PEKERJAAN (D + E) 34,512.50
TPQ AL - NADITA FASYAH
Jalan Poros Wabahara Desa Lagasa Kec. Duruka Kab. Muna

DAFTAR KWANTITAS DAN HARGA


KEGIATAN : Pembangunan TPQ AL - NADITA FASYAH Untuk Memperkuat Program Pendidikan
RA AL - NADITA FASYAH dan MI AL - NADITA FASYAH
PEKERJAAN : Pembangunan TPQ AL - NADITA FASYAH
LOKASI : Jalan Poros Wabahara Desa Lagasa Kec. Duruka Kab. Muna
TA : 2020
HARGA JUMLAH
NO. URAIAN DAN JENIS PEKERJAAN SAT VOLUME SATUAN HARGA
(Rp) (Rp)
1 2 3 5 6

I PEKERJAAN PERSIAPAN
1 Pekerjaan Pengukuran dan Pas. Bouwplank Ls 1.00 200,000.00 200,000.00
2 Dokumentasi ,Administrasi Dan P3K Ls 1.00 1,200,000.00 1,200,000.00
3 Papan Nama Kegiatan Ls 1.00 300,000.00 300,000.00
4 Pembongkaran Bangunan Lama Ls 1.00 2,676,000.00 2,676,000.00
Jumlah 4,376,000.00
II PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Fondasi m3 14.38 106,562.50 1,532,454.00
2 Pek. Urugan Tanah Kembali m3 3.60 38,953.75 140,046.52
3 Pek. Urugan Tanah Alas Lantai m3 5.46 136,354.03 744,493.00
4 Pek. Urugan Pasir Alas Lantai m3 2.73 218,515.00 596,545.95
Jumlah 3,013,539.47
III PEKERJAAN PASANGAN
1 Pek Pasangan Batu Kosong m3 3.68 422,640.90 1,555,656.62
2 Pek Pasangan Batu Belah Dengan Mortared 1 : 4 m3 7.12 851,677.20 6,060,109.12
3 Pek. Pasangan Bata 1 : 4 m2 48.24 145,213.20 7,005,084.77
Jumlah 14,620,850.51
IV PEKERJAAN BETON
1 Pek. Sloof Ukr 15 x 15 Beton 1 : 2 : 3
- Pek. Bekisting Untuk Sloof m2 6.42 141,566.33 908,855.86
- Pembesian Dengan Beton Polos Kg 69.19 28,930.00 2,001,707.20
- Pek. Beton Mutu f'c = 19,3 Mpa (K225) m3 0.48 1,276,345.70 614,560.45
2 Pek.Kolom Ukr 15 x 15 Beton Camp. 1 : 2 : 3 m1 33.02 129,184.77 4,265,681.11
3 Pek.Ring Balok Ukr 15 x 15 Beton Camp. 1 : 2 : 3 m1 26.46 129,184.77 3,418,229.01
Jumlah 11,209,033.63
V PEKERJAAN PLESTERAN / ACIAN AIR CEMENT
1 Pek. Plesteran Dinding Camp 1 : 4 m2 76.08 72,409.00 5,508,514.37
2 Pek Plesteran Muka Fondasi 1 : 3 m2 6.21 74,855.84 464,555.35
3 Pek. Acian Air Cemen Muka Fondasi m2 6.21 44,276.93 274,782.60
Jumlah 6,247,852.31
VI PEK.KUSEN DAUN PINTU DAN JENDELA KAYU KELAS 1
1 Pek. Kusen Kayu Kelas 1 m3 0.55 9,244,922.50 5,086,556.36
2 Pek. Daun Pintu Kayu Klas 1 m2 3.06 777,480.00 2,382,665.21
3 Pek. Daun Jendela Kayu Klas 1 m2 4.42 582,263.00 2,573,602.46
4 Pek. Jalusi Kayu Kelas. I m2 5.72 711,744.00 4,074,022.66
Jumlah 14,116,846.68
VII PEKERJAAN ATAP
1 Pek. Kuda - Kuda Kayu Kelas 1 m3 0.60 9,053,584.54 5,433,889.01
3 Pek. Rangka Atap Kayu Kelas 1 m2 60.72 102,509.00 6,224,346.48
4 Pek. Atap Soka Abadi m2 87.88 91,478.75 8,038,914.71
5 Pek. Nok Atap Induk m1 7.59 142,532.50 1,082,106.74
6 Pek. Lesplank Kayu Kelas 1 Atap Induk m2 4.74 99,599.50 472,101.63
Jumlah 21,251,358.57
VIII PEKERJAAN PLAFOND DAN RANGKA KAYU KLS.II
1 Pek. Rangka Plafond Kayu Kelas II Modul 120 x 120 m2 36.69 201,243.90 7,382,833.72
2 Pek. Plafond Tripleks 3 mm Modul 120 x 120 m2 36.69 54,006.43 1,981,279.71
3 Pek. Les Plafond m2 2.58 53,113.50 137,209.88
Jumlah 9,501,323.30
IX PEKERJAAN LANTAI
1 Pek. Pasang Keramik Lantai 40 x 40 Cm m2 40.43 160,095.78 6,472,672.47
Jumlah 6,472,672.47
X PEKERJAAN PENGECATAN
1 Pek. Cat Dan Plamir Tembok Dll m2 96.48 28,061.55 2,707,378.34
2 Pek. Cat Kusen, Daun Pintu/ Jendela m2 27.52 34,753.40 956,330.16
3 Pekerjaan Pengecatan Plafond m2 36.69 34,753.40 1,274,963.23
Jumlah 4,938,671.74
XI PEKERJAAN INSTALASI TITIK ALIR
1 A Pemasangan Kembali Jaringan Listrik Ls 1.00 2,500,000.00 2,500,000.00
B Instalasi Titik Api Kontak, Instalasi termasuk kabel
NYA 2,5 mm dalam Pipa PVC dan Kelengkapan
Instalasi Terpasang Lantai Laboratorium Dan RKB Ls 1.00 550,000.00 550,000.00
Jumlah 3,050,000.00
XII PEKERJAAN KUNCI DAN KACA
1 Pek. Pasang Kunci Pintu 2 x Putar BH 2.00 139,458.00 278,916.00
2 Pek. Pasang Engsel Pintu Biasa BH 6.00 45,356.30 272,137.80
3 Pek. Pasang Engsel Jendela Biasa BH 24.00 45,356.30 1,088,551.20
4 Pek. Pasang Grendel Pintu BH 2.00 30,827.50 61,655.00
5 Pek. Pasang Grendel Jendela BH 12.00 30,827.50 369,930.00
6 Pek. Pasang Hak Angin Biasa BH 12.00 29,956.30 359,475.60
7 Pek. Kaca Mati 3mm m2 3.36 467,527.50 1,570,892.40
Jumlah 4,001,558.00
XIII PEK.KANOPI TERAS SAMPING
1 Pek. Kanopi Termasuk Rabat Lantai Dan Aksesoris Lainnya Ls 1.00 17,000,000.00 17,000,000.00
Jumlah 17,000,000.00
XIV PEK.FINISHING
1 Pek. Pembersihan Dari Sisa Pekerjaan Ls 1.00 200,300.00 200,300.00
Jumlah 200,300.00
TPQ AL - NADITA FASYAH
Jalan Poros Wabahara Desa Lagasa Kec. Duruka Kab. Muna

REKAPITULASI
PERKIRAAN HARGA PEKERJAAN
Pembangunan TPQ AL - NADITA FASYAH Untuk Memperkuat Program
KEGIATAN : Pendidikan RA AL - NADITA
FASYAH dan MI AL - NADITA FASYAH
PEKERJAAN : Pembangunan TPQ AL - NADITA FASYAH
LOKASI : Jalan Poros Wabahara Desa Lagasa Kec. Duruka Kab. Muna
TA : 2020

Jumlah Harga
No. Divisi URAIAN ITEM PEKERJAAN Pekerjaan
(Rupiah)

I PEKERJAAN PERSIAPAN 4,376,000.00


II PEKERJAAN TANAH DAN PASIR 3,013,539.47
III PEKERJAAN PASANGAN 14,620,850.51
IV PEKERJAAN BETON 11,209,033.63
V PEKERJAAN PLESTERAN / ACIAN AIR CEMENT 6,247,852.31
VI PEK.KUSEN DAUN PINTU DAN JENDELA KAYU KELAS 1 14,116,846.68
VII PEKERJAAN ATAP 21,251,358.57
VIII PEKERJAAN PLAFOND DAN RANGKA KAYU KLS.II 9,501,323.30
IX PEKERJAAN LANTAI 6,472,672.47
X PEKERJAAN PENGECATAN 4,938,671.74
XI PEKERJAAN INSTALASI TITIK ALIR 3,050,000.00
XII PEKERJAAN KUNCI DAN KACA 4,001,558.00
XIII PEK.KANOPI TERAS SAMPING 17,000,000.00
XIV PEK.FINISHING 200,300.00
Jumlah Harga Pekerjaan 120,000,006.68
Dibulatkan 120,000,000.00

Terbilang SERATUS DUA PULUH JUTA RUPIAH

Raha, Maret 2020

Diajukan Oleh :
Pembina Yayasan :
AL - NADITA FASYAH

MUH. AKHIRULLAH, SP
(Ketua)
NO SUDUT SIN COS TAN
1 0 0 1 0.01745506492822
2 30 0.5 0.9999619230642 0.01745440015785
3 45 0.7071067811865 0.9999238466116 0.01745373539593
4 60 0.8660254037844 0.9998857706424 0.01745307064246
5 90 1 0.9998476951564 0.01745240589745
Berat Per Meter Pnj Tot Berat/12m
Besi 6 44,641.00 0.22 Kg/m 12.00 2.64 Kg 16,909 Kg 44,641.00
Besi 8 70,041.00 0.39 Kg/m 12.00 4.68 Kg 14,966 Kg 70,041.00
Besi 10 100,521.00 0.62 Kg/m 12.00 7.44 Kg 13,511 Kg 100,521.00
Besi 12 139,891.00 0.89 Kg/m 12.00 10.68 Kg 13,098 Kg 139,891.00
Besi 14 171,641.00 1.54 Kg/m 12.00 18.48 Kg 9,288 Kg 171,641.00
Besi 16 222,441.00 2.01 Kg/m 12.00 24.12 Kg 9,222 Kg 222,441.00