Tata Power Kalinganagar Cpp1: Cumul. Engg Progress Planned Progress
Tata Power Kalinganagar Cpp1: Cumul. Engg Progress Planned Progress
Eng Planned
Sl. Weighta
Discipline Owner's Drg. No./ Document No. TITLE Cat Progres Date of Due
No ge
s Issue
4 Electrical TP0004-V005-00-E22-E4-001 415V AC System single line diagram A 0.20% 0.20% 12/Oct/12 0
5 Electrical TP0004-V005-00-E07-E4-001 220V DC System Single line diagram A 0.30% 0.30% 12/Oct/12 0
6 Electrical TP0004-V005-00-E13-E4-001 Fire Detection and Alarm SLD A 0.20% 0.15% 13/Dec/12 0
8 Electrical TP0004-V005-00-E14-G1-001 Transformer yard electrical equipment layout A 0.70% 0.70% 7/Sep/12 0
9 Electrical TP0004-V005-00-E32-E4-002 TG Building BC bay electrical equipment layout elv at 4mtr lvl A 0.30% 0.30% 14/Sep/12 0
10 Electrical TP0004-V005-00-E32-E4-003 TG Building BC Bay Floor cut-out layout at EL+4.00 M A 0.30% 0.30% 14/Sep/12 0
11 Electrical TP0004-V005-00-E32-E4-006 TG Building BC bay electrical equipment layout eiv at 12mtr lvl A 0.30% 0.30% 25/Oct/12 0
12 Electrical TP0004-V005-00-E32-E1-001 (Sheet 1) 132 KV GIS building Equipment layout A 0.50% 0.50% 10/Oct/12 0
13 Electrical TP0004-V005-00-E32-E1-001 (Sheet 2) 132 KV GIS building Floor Cut-out details A 0.30% 0.30% 10/Oct/12 0
14 Electrical TP0004-V005-00-E32-E2-010 TG Building BC Bay Electrical equipment layout at 17.5M El. A 0.15% 0.15% 14/Sep/12 0
15 Electrical TP0004-V005-00-E32-E2-011 TG Building BC Bay Cut-out Details at 12M El. A 0.20% 0.20% 30/Oct/12 0
16 Electrical TP0004-V005-00-E32-E2-009 TG Building BC Bay Electrical Equipment Layout at 12M El. A 0.20% 0.20% 30/Oct/12 0
17 Electrical TP0004-V005-00-E22-E2-053 Equipment layout for Clarified Water MCC A 0.20% 0.20% 30/Oct/12 0
18 Electrical TP0004-V005-00-E22-E2-054 Equipment layout for Fuel Oil MCC A 0.20% 0.20% 30/Oct/12 0
19 Electrical TP0004-V005-00-E22-E2-052 Equipment layout for DM Water Transfer & ETP MCC A 0.15% 0.15% 30/Oct/12 0
20 Electrical TP0004-V005-00-E22-E2-055 Equipment Layout for Air Compressor MCC room A 0.15% 0.15% 31/Oct/12 0
21 Electrical TP0004-V005-00-E22-E2-051 Equipment layout for CW Pump House MCC A 0.20% 0.20% 30/Oct/12 0
22 Electrical TP0004-V005-00-E32-E1-003 132KV GIS Building Cable Trench/Insert Plate Details A 0.50% 0.50% 19/Dec/12 0
23 Electrical TP0004-V005-00-E25-E2-002 Cabling Layout at TG Building BC Bay at El. 0.0M A 0.20% 0.20% 20/Nov/12 0
24 Electrical TP0004-V005-00-E25-E2-030 Cabling Layout of TG Building BC Bay 12M A 0.20% 0.20% 20/Nov/12 0
25 Electrical TP0004-V005-00-E25-E2-010 Cable Routing Layout at TG Building BC Bay at El. 17.5 Mtr A 0.10% 0.10% 1/Jan/13 0
26 Electrical TP0004-V005-00-E25-E2-021 Cabling Layout of CW Pump House MCC Room A 0.10% 0.10% 20/Nov/12 0
27 Electrical TP0004-V005-00-E25-E2-004 Cable Routing for Single/Twin Flue Stack A 0.25% 0.25% 24/Dec/12 0
28 Electrical TP0004-V005-00-E25-E2-020 Cabling Layout of DM Water Transfer & ETP PCC A 0.15% 0.15% 20/Nov/12 0
29 Electrical TP0004-V005-00-E25-E2-006 Cabling Layout at Fuel Oil Tank Area A 0.10% 0.10% 25/Nov/12 0
31 Electrical TP0004-V005-00-E25-E2-008 Cabling Layout at Circulating Water Pump House A 0.10% 0.10% 10/Dec/12 0
32 Electrical TP0004-V005-00-E25-E2-009 Cabling Layout at Clarified Water Pump House A 0.20% 0.20% 10/Dec/12 0
33 Electrical TP0004-V005-00-E25-E2-026 Cabling Layout for TG Building AB Bay at El. +0.50M A 0.20% 0.20% 20/Dec/12 0
34 Electrical TP0004-V005-00-E25-E2-013 Cross sectional view of cable Tunnel of the Plant (CPP1) A 0.20% 0.20% 17/Jan/13 0
35 Electrical TP0004-V005-00-E25-E2-012 Overall cable routing layout of the plant (CPP-1) A 0.30% 0.30% 17/Jan/13 0
EARTHING 0.00% 0
37 Electrical TP0004-V005-00-E08-E2-001 Composite Earthing Layout (Below ground) A 0.30% 0.30% 5/Sep/12 0
38 Electrical TP0004-V005-00-E08-E2-002 Earthing Layout 132 KV GIS Building (Floor Earthing) A 0.30% 0.30% 29/Oct/12 0
39 Electrical TP0004-V005-00-E08-E2-003 Earthing Layout of TG Deck & Steam Generator Earthing A 0.50% 0.50% 15/Oct/12 0
40 Electrical TP0004-V005-00-E08-E2-004 Earthing Layout of Transformer yard and GIS Bldg A 0.30% 0.30% 20/Oct/12 0
42 Electrical TP0004-V005-00-E08-E2-006 Earthing & Lightning Prot. Layout of Chimney A 0.15% 0.15% 15/Oct/12 0
43 Electrical TP0004-V005-00-E08-E2-008 Earthing Layout of Fuel Oil PH & MCC Room A 0.20% 0.20% 15/Nov/12 0
45 Electrical TP0004-V005-00-E08-E2-010 Earthing Layout of Circulating Water Pump House A 0.15% 0.15% 20/Nov/12 0
46 Electrical TP0004-V005-00-E08-E2-011 Earthing Layout of Clarified cum Fire Water Pump House A 0.15% 0.15% 20/Nov/12 0
47 Electrical TP0004-V005-00-E08-E2-012 Earthing Layout of Circulating Water Pump House MCC Room A 0.15% 0.15% 25/Nov/12 0
48 Electrical TP0004-V005-00-E08-E2-070 Earthing Layout of GIS Equipment Room A 0.15% 0.15% 25/Nov/12 0
49 Electrical TP0004-V005-00-E08-E2-052 Earthing Layout of AB Bay 5.5 Mtr A 0.15% 0.15% 2/Nov/12 0
50 Electrical TP0004-V005-00-E08-E2-054 Twin Flue Chimney Earthing & Lightning Protection Layout A 0.20% 0.20% 2/Nov/12 0
51 Electrical TP0004-V005-00-E08-E2-055 Earthing Layout of AB & BC Bay 0.0 Mtr. A 0.20% 0.20% 10/Nov/12 0
52 Electrical TP0004-V005-00-E08-E2-056 Earthing Layout of BC Bay 4.0 Mtr A 0.15% 0.15% 10/Nov/12 0
53 Electrical TP0004-V005-00-E08-E2-057 Earthing Layout of BC Bay 9.2 Mtr A 0.15% 0.15% 10/Nov/12 0
55 Electrical TP0004-V005-00-E08-E2-059 Earthing Layout of BC Bay 17.5 Mtr A 0.15% 0.15% 10/Nov/12 0
57 Electrical TP0004-V005-00-E08-E2-020 Lightning Protection Layout for GIS Building A 0.30% 0.30% 19/Dec/12 0
58 Electrical TP0004-V005-00-E08-E2-021 Lightning Protection Layout for TG Building A 0.20% 0.20% 1/Dec/12 0
59 Electrical TP0004-V005-00-E08-E2-023 Lightning Protection Layout for IDCT A 0.10% 0.08% 5/Dec/12 0
61 Electrical TP0004-V005-00-E20-E2-044 Lighting Layout of 132 KV GIS building at El. 0.50M A 0.15% 0.15% 5/Jan/13 0
62 Electrical TP0004-V005-00-E20-E2-040 Lighting Layout AB Bay 0.0 Mtr A 0.05% 0.05% 15/Dec/12 0
Tata Power KalingaNagar CPP1
Master Drawing List ABB DOCUMENT STATUS
Cumul. Engg Progress 10.23% Remaining documents 0
Planned Progress 11.00% To be submitted till date 80
Today Wednesday, June 04, 2014 Submitted till date 71
Due for Submission 9
Eng
Sl. Weight Planned Date of
Discipline Owner's Drg. No./ Document No. TITLE Cat Progres Due
No age Issue
s
RELAY SETTING 0
5 Electrical TP0004-V005-00-E-ST-006 Relay Setting for 132 kV GIS A 0.25% 0.13% 20/Apr/13 0
6 Electrical TP0004-V005-00-E-EDN-001 Earthing and Lightning Protection Notes and details A 0.30% 0.30% 6/Sep/12 0
7 Electrical TP0004-V005-00-E-EDN-002 Cables and Cable Trays Notes and details A 0.30% 0.30% 6/Sep/12 0
8 Electrical TP0004-V005-00-E-EDN-003 Lighting System Notes and details A 0.30% 0.30% 17/Nov/12 0
10 Electrical TP0004-V005-00-E-EDN-007 Design Basis Report for Fire Detection & Alarm A 0.20% 0.20% 13/Dec/12 0
11 Electrical TP0004-V005-00-E-EDN-009 Design Basis Report for SAS Panels A 0.20% 0.20% 10/Dec/12 0
12 Electrical TP0004-V005-00-E-EDN-008 Design Basis Report for Plant Intra Communication A 0.10% 0.00% 10/Dec/12 -541
13 Electrical TP0004-V005-01-E-SCH-001 6.6kV Schedule-Unit Aux SWDB-1 (US1A, US1B) I 0.10% 0.10% 15/Mar/13 0
14 Electrical TP0004-V005-02-E-SCH-002 6.6kV Schedule-Unit Aux SWDB-2 (US2A, US2B) I 0.15% 0.15% 15/Mar/13 0
15 Electrical TP0004-V005-03-E-SCH-003 6.6kV Schedule-Unit Aux SWDB-3 (US3A, US3B) I 0.15% 0.15% 15/Mar/13 0
16 Electrical TP0004-V005-00-E-SCH-001 6.6kV Station SWDB (C-1,C-2, C-3, C-4) I 0.15% 0.15% 15/Mar/13 0
43 Electrical TP0004-V005-00-E-SCH-025 Cable Schedule for SCADA UPS DB I 0.15% 0.15% 25/Apr/13 0
44 Electrical TP0004-V005-00-E-SCH-073 cable schedule FOR PA & EAPBAX SYSTEM I 0.05% 0.00% 25/Apr/13 -405
45 Electrical TP0004-V005-00-E-SCH-074 cable schedule FOR Compressor MCC I 0.10% 0.10% 25/Apr/13 0
46 Electrical TP0004-V005-00-E-SCH-075 cable schedule FOR Clarified Water MCC I 0.10% 0.10% 25/Apr/13 0
49 Electrical TP0004-V005-00-E-SCH-081 Cable schedule Auxilary Space Heater DB I 0.10% 0.10% 11-Apr-13 0
69 Electrical TP0004-V005-00-E-SCH-076 cable schedule for Compressor MCC I 0.10% 0.10% 25-Apr-13 0
70 Electrical TP0004-V005-00-E-SCH-078 cable schedule for Clarified Water MCC I 0.10% 0.10% 25-Apr-13 0
TRANSFORMERS 0 0 0
1 Electrical C TP0004-V005-00-E-CA-001 Station Transformer Sizing Calculation A 0.50% 0.50% 13-Sep-12 0 1 0 0 15 13-Sep-12 147 25-Sep-12 3 29 8-Oct-12 220 11-Oct-12 2 40 16-Oct-12 254 17-Oct-12 2
2 Electrical C TP0004-V005-00-E-CA-002 UAT Transformer Sizing Calculation A 0.40% 0.40% 13-Sep-12 0 1 0 0 16 13-Sep-12 145 25-Sep-12 3 30 8-Oct-12 220 23-Nov-12 2 404 8-Aug-13 283 3-Sep-13 1
4 Electrical C TP0004-V005-00-E-CA-004 Unit Service Transformer sizing calculation A 0.25% 0.25% 14-Sep-12 0 1 0 0 17 14-Sep-12 146 25-Sep-12 3 26 4-Oct-12 202 17-Oct-12 3 50 30-Oct-12 33 16-Nov-12 2
7 Electrical C TP0004-V005-00-E-CA-006 ETP Service Transformer A 0.10% 0.10% 10-Oct-12 0 1 0 0 76 26-Nov-12 47 4-Dec-12 3 107 20-Dec-12 3-Jan-13 3 130 8-Jan-13 108 15-Feb-13 2
8 Electrical C TP0004-V005-00-E-CA-008 Lighting Service Transformer sizing calculation A 0.20% 0.18% 1-Dec-12 0 2 ABB 68 562 28-Nov-13 453 24-Dec-13 3 637 3-Jan-14 478 18-Jan-14 2 663 22-Jan-14 522 26-Feb-14 2
10/26/2012
9 Electrical C TP0004-V005-00-E-CA-150 CT & PT sizing calculation for 132 Kv GIS A 0.50% 0.50% 6-Sep-12 0 1 0 0 10 6-Sep-12 112 14-Sep-12 3 38 12-Oct-12 ERM Oct/ 23 2 57 9-Nov-12 33 16-Nov-12 2
10/30/2012
3/13/2013 /
10 Electrical C TP0004-V005-00-E-CA-007 BCT sizing calculation for GT A 0.40% 0.40% 29-Sep-12 0 1 0 0 111 21-Dec-12 86 11-Jan-13 3 181 26-Feb-13 Mail/130 21 Mar 2 474 16-Oct-13 343 29-Oct-13 1
11 Electrical C TP0004-V005-00-E-CA-011 CT sizing calculation for IPBD A 0.30% 0.30% 29-Sep-12 0 1 0 0 115 21-Dec-12 98 1-Feb-13 3 165 13-Feb-13 115 28-Feb-13 3 217 26-Mar-13 Mail/161 12-Apr 3
12 Electrical C TP0004-V005-00-E-CA-009 BCT sizing calculation for UAT A 0.40% 0.40% 25-Nov-12 0 1 0 0 108 20-Dec-12 86 11-Jan-13 3 187 28-Feb-13 128 21-Mar-13 2 474 16-Oct-13 343 29-Oct-13 1
13 Electrical C TP0004-V005-00-E-CA-067 BCT sizing calculation for ST A 0.40% 0.40% 25-Nov-12 0 1 0 0 108 20-Dec-12 86 11-Jan-13 3 180 26-Feb-13 128 21-Mar-13 2 474 16-Oct-13 343 29-Oct-13 1
BUSDUCTs 0 0 0
14 Electrical C TP0004-V005-00-E-CA-016 IPBD Sizing Calculation A 0.30% 0.30% 13-Sep-12 0 1 0 14 13-Sep-12 145 25-Sep-12 3 35 10-Oct-12 230 26-Oct-12 3 44 22-Oct-12 26 1-Nov-12 1
15 Electrical C TP0004-V005-00-E-CA-017 SPBD Sizing Calculation A 0.20% 0.20% 28-Sep-12 0 1 0 0 87 4-Dec-12 59 12-Dec-12 3 122 27-Dec-12 4-Jan-13 2 678 28-Jan-14 520 26-Feb-14 1
16 Electrical C TP0004-V005-00-E-CA-015 NSPBD Sizing Calculation A 0.20% 0.20% 28-Oct-12 0 1 0 0 79 28-Nov-12 51 6-Dec-12 3 124 31-Dec-12 4-Jan-13 3 156 6-Feb-13 108 15-Feb-13 1
EMERGENCY SOURCE 0 0 0
17 Electrical C TP0004-V005-00-E-CA-018 240V AC UPS Sizing Calculation for UNIT & Station A 0.30% 0.30% 10-Dec-12 0 1 0 0 37 11-Oct-12 27 2-Nov-12 3 203 12-Mar-13 148 9-Apr-13 1
18 Electrical C TP0004-V005-00-E-CA-019 240 AC UPS Sizing Calculation for SCADA A 0.20% 0.20% 20-Nov-12 0 1 0 0 66 20-Nov-12 42 28-Nov-12 3 136 17-Jan-13 95 25-Jan-13 3 e e 1
20 Electrical C TP0004-V005-00-E-CA-031 DC System Fault Sizing Calculation A 0.20% 0.20% 10-Jan-13 0 1 0 219 27-Mar-13 Mail/160 12-Apr 3 249 30-Apr-13 Mail/173 13-May-13 2 277 23-May-13 193 11-Jun-13 1
CABLES 0 0 0
22 Electrical C TP0004-V005-00-E-CA-022 MV Cable Sizing Calculation A 0.30% 0.30% 7-Sep-12 0 1 0 0 11 7-Sep-12 112 17-Sep-12 3 24 3-Oct-12 201 15-Oct-12 3 56 08.11.12 38 22-Nov-12 3
23 Electrical C TP0004-V005-00-E-CA-024 LV power Cable Sizing Calculation A 0.30% 0.30% 7-Oct-12 0 1 0 0 83 29-Nov-12 47 4-Dec-12 3 144 27-Jan-13 115 28-Feb-13 3 480 22-Oct-13 364 12-Nov-13 2
24 Electrical C TP0004-V005-00-E-CA-025 Earthing conductor sizing below ground A 0.30% 0.30% 3-Sep-12 0 1 0 0 3 4-Sep-12 5 21-Sep-12 3 28 5-Oct-12 212 15-Oct-12 2 28 22-Oct-12 27 2-Nov-12 1
26 Electrical C TP0004-V005-00-E-CA-063 TG building lightning Protection A 0.30% 0.30% 27-Sep-12 0 1 0 0 22 28-Sep-12 235 12-Oct-12 2 65 16.11.12 29-Nov-12 1
27 Electrical C TP0004-V005-00-E-CA-028 Chimney earthing & Lighting protection A 0.30% 0.30% 8-Nov-12 0 1 0 0 9 6-Sep-12 110 14-Sep-12 3 20 27-Sep-12 189 15-Oct-12 2 59 12.11.12 41 28-Nov-12 2
NEUTRAL GROUNDING 0 0 0
31 Electrical C TP0004-V005-00-E-CA-035 Neutral Grounding Transformer(NGT) Sizing A 0.30% 0.30% 24-Nov-12 0 1 0 0 189 1-Mar-13 Mail/151 9-Apr 3 241 22-Apr-13 172 8-May-13 2 260 13-May-13 179 21-May-13 1
32 Electrical C TP0004-V005-00-E-CA-036 UAT NGR sizing calculation A 0.20% 0.20% 3-Oct-12 0 1 0 0 36 11-Oct-12 28 2-Nov-12 3 60 15.11.12 22-Nov-12 3 91 5-Dec-12 69 19-Dec-12 3
33 Electrical C TP0004-V005-00-E-CA-062 ST NGR sizing calculation A 0.20% 0.20% 3-Oct-12 0 1 0 0 36 11-Oct-12 28 2-Nov-12 3 60 15.11.12 22-Nov-12 3 91 5-Dec-12 69 19-Dec-12 3
Illumination 0 0 0
34 Electrical C TP0004-V005-00-E-CA-103 Lighting Calc. of TG Building BC Bay at El 12M A 0.10% 0.10% 1-Dec-12 0 1 0 0 277 23-May-13 209 21-Jun-13 3 398 6-Aug-13 295 16-Sep-13 3 504 7-Nov-13 374 18-Nov-13 3
3/11/2013 /
35 Electrical C TP0004-V005-00-E-CA-101 Lighting Calc. for BC bay 0.0M A 0.10% 0.10% 1-Dec-12 1 0 146 29-Jan-13 Mail/128
21 Mar 3 495 2-Nov-13 609 13-Dec-13 442 18-Dec-13 1
36 Electrical C TP0004-V005-00-E-CA-102 Lighting Calculation for GIS Building at El. 0.50M A 0.10% 0.10% 1-Jan-13 1 0 266 16-May-13 198 17-Jun-13 3 361 12-Jul 282 3-Sep 3 447 16-Sep 319 5-Oct-13 3
37 Electrical C TP0004-V005-00-E-CA-104 Lighting Calc. of TG Building BC Bay at El 9.2M A 0.10% 0.10% 1-Jan-13 1 0 291 5-Jun-13 Mail/208 20-Jun-13 3 361 12-Jul 298 19-Sep 3 502 7-Nov-13
39 Electrical C TP0004-V005-00-E-CA-116 Lighting Calculation of Compressor House A 0.10% 0.10% 1-Jan-13 1 0 309 18-Jun-13 Mail/231 22-Jul-13 3 438 4-Sep-13 324 8-Oct-13 3 514 9-Nov-13 468 12-Jan-14 1
40 Electrical C TP0004-V005-00-E-CA-107 Lighting Calculation of DM Water Area A 0.10% 0.10% 1-Jan-13 1 0 335 1-Jul-13 Mail/242 15-Jul-13 3 652 10-Jan-14 484 24-Jan-14 3 691 31-Jan-14 505 14-Feb-14 2
43 Electrical C TP0004-V005-00-E-CA-110 Lighting Calculation for Clarified Water Pump House A 0.10% 0.10% 1-Feb-13 1 0 419 22-Aug-13 314 30-Sep 3 479 18-Oct-13 346 30-Oct-13 1 MAIL MAIL 438 12-Jan-14 1
44 Electrical C TP0004-V005-00-E-CA-111 Lighting Calculation for IDCT A 0.10% 0.10% 1-Feb-13 1 0 418 22-Aug-13 314 30-Sep 3 MAIL MAIL 395 26-Nov-13 3 647 9-Jan-14 510 20-Feb-14 3
45 Electrical C TP0004-V005-00-E-CA-112 Lighting Calculation for BC Bay 17.5 Mtr A 0.10% 0.10% 1-Feb-13 1 440 5-Sep 323 8-Oct-13 3 514 9-Nov-13 397 27-Nov-13 3 647 9-Jan-14 509 19-Feb-14 1
46 Electrical C TP0004-V005-00-E-CA-113 Lighting Calculation for BC Bay 23 Mtr A 0.10% 0.10% 1-Feb-13 1 0 440 5-Sep 323 8-Oct-13 3 514 9-Nov-13 397 27-Nov-13 3 735 4-Mar-14 551 24-Mar-14 2
47 Electrical C TP0004-V005-00-E-CA-114 Illumination sizing Calculation for Fuel oil Area A 0.10% 0.10% 1-Feb-13 1 449 17-Sep 479 18-Oct-13 3 347 30-Oct-13 1
49 Electrical C TP0004-V005-00-E-CA-116 Lighting Sizing calculation of Compressor House A 0.10% 0.10% 1-Feb-13 1 0 e 3-Sep 324 8-Oct-13 3 509 8-Nov-13 385 21-Nov-13 2 468 12-Jan-14 1
51 Electrical C TP0004-V005-00-E-CA-118 Illumination Sizing Calculation for Transformer Yard A 0.10% 0.10% 1-Feb-13 1 0 531 12-Nov commented 3 647 9-Jan-14 501 7-Feb-14 2 718 19-Feb-14 528 28-Feb-14 1
Tata Power KalingaNagar CPP1
Master Drawing List - ABB DOCUMENT STATUS
Cumul. Engg Progress 62.29% Remaining documents 0
Planned Progress 63.00% To be submitted till date 624
Today Wednesday, June 04, 2014 Submitted till date 618
Due for Submission 6
Sl. Planned Date
Discipline Owner's Drg. No./ Document No. TITLE Cat Weightage Eng Progress Due
No of Issue
A GENERATOR TRANSFORMER(100MVA) 0
General outline drawing showing plan, front elevation, side
1 Electrical TP0004-V005-00-E16-E1-005 A 0.75% 0.75% 12-Oct-12 0
elevation with all fittings and accessories etc.
2 Electrical TP0004-V005-00-E16-E1-006 Foundation plan A 0.30% 0.30% 12-Oct-12 0
3 Electrical TP0004-V005-00-E16-E1-007 GA of Marshalling box details A 0.25% 0.25% 12-Oct-12 0
11 Electrical TP0004-V005-00-E16-E1-018 Schematic of FACIA and RTCC termination A 0.30% 0.30% 12-Oct-12 0
13 Electrical TP0004-V005-00-E16-E1-021 Schematic Diagram of cooler control scheme A 0.25% 0.25% 12-Oct-12 0
14 Electrical TP0004-V005-00-E16-E1-022 Valve Schedule Plate A 0.20% 0.20% 12-Oct-12 0
15 Electrical TP0004-V005-00-E16-E1-039 G.A. of C.T. Terminal Box I 0.20% 0.20% 12-Oct-12 0
16 Electrical TP0004-V005-00-E16-E1-013 Transportation details I 0.10% 0.10% 12-Oct-12 0
17 Electrical TP0004-V005-00-E16-E1-028 Online DGA Hydran M2 I 0.10% 0.10% 31-Jan-13 0
18 Electrical TP0004-V005-00-E16-E1-026 Mandatory spare parts list I 0.10% 0.09% 31-Mar-13 0
19 Electrical TP0004-V005-00-E-SI-002 Sub-Vendor Details A 0.10% 0.10% 12-Oct-12 0
20 Electrical TP0004-V005-00-E16-E1-033 Dynamic short ckt calculation I 0.10% 0.10% 12-Oct-12 0
21 Electrical TP0004-V005-00-E16-E1-034 Thermal short ckt calculation I 0.10% 0.10% 12-Oct-12 0
22 Electrical TP0004-V005-00-E-TP-001 Test Plan I 0.10% 0.10% 31-Dec-12 0
B STATION TRANSFORMER(16/20MVA) 0
23 Electrical TP0004-V005-00-E16-E1-051 Outline General Arrangement A 0.50% 0.50% 26-Nov-12 0
24 Electrical TP0004-V005-00-E16-E1-052 HV & HVN solid porcelain bushing and Technical particulars A 0.25% 0.25% 26-Nov-12 0
25 Electrical TP0004-V005-00-E16-E1-053 LV&LVN solid porcelain bushing and Technical particulars A 0.25% 0.25% 26-Nov-12 0
26 Electrical TP0004-V005-00-E16-E13-054 Rating & diagram plate A 0.20% 0.20% 26-Nov-12 0
27 Electrical TP0004-V005-00-E16-E1-055 Foundation Plan/Civil assignment drawings for ST. A 0.25% 0.25% 26-Nov-12 0
28 Electrical TP0004-V005-00-E16-E15-056 Schematic Cooler control A 0.25% 0.25% 26-Nov-12 0
29 Electrical TP0004-V005-00-E16-E1-057 General arrangement of Marshalling box A 0.20% 0.20% 26-Nov-12 0
30 Electrical TP0004-V005-00-E16-E15-058 Schematic of OLTC control A 0.25% 0.25% 26-Nov-12 0
31 Electrical TP0004-V005-00-E16-E1-060 General arrangement of RTCC A 0.20% 0.20% 26-Nov-12 0
32 Electrical TP0004-V005-00-E-DS-062 GTP A 0.30% 0.30% 26-Nov-12 0
33 Electrical TP0004-V005-00-E16-E13-063 Oil Flow diagram & Valve schedule plate I 0.25% 0.25% 26-Nov-12 0
34 Electrical TP0004-V005-00-E16-E1-064 Roller details & Rail Gauge Drawing A 0.20% 0.20% 26-Nov-12 0
35 Electrical TP0004-V005-00-E16-E1-065 Transportation details A 0.20% 0.20% 26-Nov-12 0
36 Electrical TP0004-V005-00-E16-E1-067 Mandatory spare parts list UAT Transformer I 0.10% 0.09% 31-Mar-13 0
37 Electrical TP0004-V005-00-E16-E13-080 Voltage Indicating Plate A 0.10% 0.10% 26-Nov-12 0
38 Electrical TP0004-V005-00-E16-E1-069 LV Cable Box Assembly Details A 0.25% 0.25% 26-Nov-12 0
39 Electrical TP0004-V005-00-QA-MQP-005 Quality assurance Plan A 0.25% 0.25% 26-Nov-12 0
C UNIT AUXILIARY TRANSFORMER(6/10MVA) 0
40 Electrical TP0004-V005-00-E16-E1-101 Outline General Arrangement A 0.50% 0.50% 15-Dec-12 0
41 Electrical TP0004-V005-00-E16-E1-102 HV solid porcelain bushing Technical particulars A 0.35% 0.35% 15-Dec-12 0
42 Electrical TP0004-V005-00-E16-E1-103 LV & LVN bushing Technical Particulars A 0.35% 0.35% 15-Dec-12 0
43 Electrical TP0004-V005-00-E16-E13-104 Rating & diagram plate A 0.35% 0.35% 15-Dec-12 0
44 Electrical TP0004-V005-00-E16-E1-105 Foundation Plan/Civil assignment drawings for UAT. A 0.35% 0.35% 15-Dec-12 0
45 Electrical TP0004-V005-00-E16-E15-106 Schematic Cooler control A 0.20% 0.20% 15-Dec-12 0
46 Electrical TP0004-V005-00-E16-E1-107 General arrangement of Marshalling box A 0.20% 0.20% 15-Dec-12 0
47 Electrical TP0004-V005-00-E-DS-109 GTP A 0.50% 0.50% 15-Dec-12 0
48 Electrical TP0004-V005-00-QA-MQP-005 Quality assurance plan A 0.20% 0.20% 15-Dec-12 0
49 Electrical TP0004-V005-00-E16-E1-111 Transportation details A 0.20% 0.20% 15-Dec-12 0
50 Electrical TP0004-V005-00-E16-E1-067 Mandatory spare parts list Station Transformer I 0.30% 0.27% 31-Mar-13 0
51 Electrical TP0004-V005-00-E16-E1-114 LV cable Box Assembly A 0.15% 0.15% 15-Dec-12 0
52 Electrical TP0004-V005-00-E16-E13-200 Valve Schedule Plate A 0.20% 0.20% 15-Dec-12 0
53 Electrical TP0004-V005-00-E16-E1-115 HV Busduct Assembly A 0.15% 0.15% 15-Dec-12 0
6.6 kV MV SWITCHGEAR 0
54 Electrical TP0004-V005-00-E27-E2-001 & 2 MV Swgr Cross section & base Frame Drawings A 0.50% 0.50% 26-Nov-12 0
55 Electrical TP0004-V005-00-E27-E4-001 to 4 Single Line Diagram A 0.50% 0.50% 26-Nov-12 0
56 Electrical TP0004-V005-00-E27-E1-001 to 4 MV Swgr GA drawings A 0.75% 0.75% 26-Nov-12 0
57 Electrical TP0004-V005-00-E27-E15-001 &2 Scheme Drawing of Incomer Feeder A 0.20% 0.20% 26-Nov-12 0
58 Electrical TP0004-V005-00-E27-E15-006 Scheme Drawing of Transformer Feeder A 0.20% 0.20% 26-Nov-12 0
59 Electrical TP0004-V005-00-E27-E15-007,8 & 9 Scheme Drawing of Motor Feeder A 0.20% 0.20% 26-Nov-12 0
60 Electrical TP0004-V005-00-E27-E15-003,4&5 Scheme Drawing of Tie Feeder A 0.20% 0.20% 26-Nov-12 0
61 Electrical TP0004-V005-00-E27-E15-010 Scheme drawings for Bus PT feeders A 0.20% 0.20% 26-Nov-12 0
62 Electrical TP0004-V005-00-E27-E1-009 Relay catalogues I 0.20% 0.20% 26-Nov-12 0
63 Electrical TP0004-V005-00-E27-E15-012 Logic Diagram A 0.25% 0.25% 26-Nov-12 0
64 Electrical TP0004-V005-00-E27-E15-011 & 012 BOM/Legend Sheet A 0.20% 0.20% 26-Nov-12 0
65 Electrical TP0004-V005-00-E27-E1-005 Layout of Relay & Instrument chamber A 0.15% 0.15% 26-Nov-12 0
66 Electrical TP0004-V005-00-E03-E15-001 Ethernet Switch Architecture for MV Boards A 0.10% 0.10% 26-Dec-12 0
67 Electrical TP0004-V005-00-E-DS-012 GTP A 0.25% 0.25% 26-Nov-12 0
68 Electrical TP0004-V005-00-QA-MQP-022 QAP A 0.10% 0.10% 26-Nov-12 0
69 Electrical TP0004-V005-00-E27-E1-015 Mandatory spare parts list MV Switchgear I 0.10% 0.08% 31-Mar-13 0
70 Electrical TP0004-V005-00-E-CA-078 & 79 MV Swgr CT & PT Sizing A 0.25% 0.25% 26-Nov-12 0
71 Electrical TP0004-V005-00-E-CA-076 & 77 MV Swgr Busbar Sizing & design instruction A 0.25% 0.25% 26-Nov-12 0