Tata Power Kalinganagar Cpp1: Cumul. Engg Progress Planned Progress

This document is a master drawing list for the Tata Power KalingaNagar CPP1 project. It shows that the overall engineering progress is 98.22% complete, with 16 documents still remaining to be submitted by their due dates. The list provides details of 44 electrical drawings, including one-line diagrams, equipment layouts, cable layouts, and earthing drawings. Categories shown include title, document number, category, engineering progress percentage, planned issue date, and documents due.

Uploaded by

siddsunny
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
101 views4 pages

Tata Power Kalinganagar Cpp1: Cumul. Engg Progress Planned Progress

This document is a master drawing list for the Tata Power KalingaNagar CPP1 project. It shows that the overall engineering progress is 98.22% complete, with 16 documents still remaining to be submitted by their due dates. The list provides details of 44 electrical drawings, including one-line diagrams, equipment layouts, cable layouts, and earthing drawings. Categories shown include title, document number, category, engineering progress percentage, planned issue date, and documents due.

Uploaded by

siddsunny
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Tata Power KalingaNagar CPP1

Master Drawing List - ABB DOCUMENT STATUS

Cumul. Engg Progress 98.22% Remaining documents 0

Planned Progress 100.00% To be submitted till date 839

Today Wednesday, June 04, 2014 Submitted till date 823

Due for Submission 16

Eng Planned
Sl. Weighta
Discipline Owner's Drg. No./ Document No. TITLE Cat Progres Date of Due
No ge
s Issue

ONE LINE DIAGRAM's 0

1 Electrical TP0004-V005-00-E32-E4-001 Key one Line Diagram A 0.30% 0.30% 9/Oct/12 0

2 Electrical TP0004-V005-00-E32-E4-005 Main one Line Diagram A 0.20% 0.20% 24/Sep/12 0

3 Electrical TP0004-V005-00-E20-E4-001 Lighting system Key SLD A 0.20% 0.18% 8/Dec/12 0

4 Electrical TP0004-V005-00-E22-E4-001 415V AC System single line diagram A 0.20% 0.20% 12/Oct/12 0

5 Electrical TP0004-V005-00-E07-E4-001 220V DC System Single line diagram A 0.30% 0.30% 12/Oct/12 0

6 Electrical TP0004-V005-00-E13-E4-001 Fire Detection and Alarm SLD A 0.20% 0.15% 13/Dec/12 0

7 Electrical TP0004-V005-00-E07-E4-002 GIS DCDB SLD A 0.20% 0.20% 13/Dec/12 0

ELECTRICAL EQUIPMENT LAYOUT's 0

8 Electrical TP0004-V005-00-E14-G1-001 Transformer yard electrical equipment layout A 0.70% 0.70% 7/Sep/12 0

9 Electrical TP0004-V005-00-E32-E4-002 TG Building BC bay electrical equipment layout elv at 4mtr lvl A 0.30% 0.30% 14/Sep/12 0

10 Electrical TP0004-V005-00-E32-E4-003 TG Building BC Bay Floor cut-out layout at EL+4.00 M A 0.30% 0.30% 14/Sep/12 0

11 Electrical TP0004-V005-00-E32-E4-006 TG Building BC bay electrical equipment layout eiv at 12mtr lvl A 0.30% 0.30% 25/Oct/12 0

12 Electrical TP0004-V005-00-E32-E1-001 (Sheet 1) 132 KV GIS building Equipment layout A 0.50% 0.50% 10/Oct/12 0

13 Electrical TP0004-V005-00-E32-E1-001 (Sheet 2) 132 KV GIS building Floor Cut-out details A 0.30% 0.30% 10/Oct/12 0

14 Electrical TP0004-V005-00-E32-E2-010 TG Building BC Bay Electrical equipment layout at 17.5M El. A 0.15% 0.15% 14/Sep/12 0

15 Electrical TP0004-V005-00-E32-E2-011 TG Building BC Bay Cut-out Details at 12M El. A 0.20% 0.20% 30/Oct/12 0

16 Electrical TP0004-V005-00-E32-E2-009 TG Building BC Bay Electrical Equipment Layout at 12M El. A 0.20% 0.20% 30/Oct/12 0

17 Electrical TP0004-V005-00-E22-E2-053 Equipment layout for Clarified Water MCC A 0.20% 0.20% 30/Oct/12 0

18 Electrical TP0004-V005-00-E22-E2-054 Equipment layout for Fuel Oil MCC A 0.20% 0.20% 30/Oct/12 0

19 Electrical TP0004-V005-00-E22-E2-052 Equipment layout for DM Water Transfer & ETP MCC A 0.15% 0.15% 30/Oct/12 0

20 Electrical TP0004-V005-00-E22-E2-055 Equipment Layout for Air Compressor MCC room A 0.15% 0.15% 31/Oct/12 0

21 Electrical TP0004-V005-00-E22-E2-051 Equipment layout for CW Pump House MCC A 0.20% 0.20% 30/Oct/12 0

CABLE LAYOUTS 0.00% 0

22 Electrical TP0004-V005-00-E32-E1-003 132KV GIS Building Cable Trench/Insert Plate Details A 0.50% 0.50% 19/Dec/12 0

23 Electrical TP0004-V005-00-E25-E2-002 Cabling Layout at TG Building BC Bay at El. 0.0M A 0.20% 0.20% 20/Nov/12 0

24 Electrical TP0004-V005-00-E25-E2-030 Cabling Layout of TG Building BC Bay 12M A 0.20% 0.20% 20/Nov/12 0

25 Electrical TP0004-V005-00-E25-E2-010 Cable Routing Layout at TG Building BC Bay at El. 17.5 Mtr A 0.10% 0.10% 1/Jan/13 0

26 Electrical TP0004-V005-00-E25-E2-021 Cabling Layout of CW Pump House MCC Room A 0.10% 0.10% 20/Nov/12 0

27 Electrical TP0004-V005-00-E25-E2-004 Cable Routing for Single/Twin Flue Stack A 0.25% 0.25% 24/Dec/12 0

28 Electrical TP0004-V005-00-E25-E2-020 Cabling Layout of DM Water Transfer & ETP PCC A 0.15% 0.15% 20/Nov/12 0

29 Electrical TP0004-V005-00-E25-E2-006 Cabling Layout at Fuel Oil Tank Area A 0.10% 0.10% 25/Nov/12 0

30 Electrical TP0004-V005-00-E25-E2-007 Cabling Layout at Compressor House A 0.10% 0.10% 25/Nov/12 0

31 Electrical TP0004-V005-00-E25-E2-008 Cabling Layout at Circulating Water Pump House A 0.10% 0.10% 10/Dec/12 0

32 Electrical TP0004-V005-00-E25-E2-009 Cabling Layout at Clarified Water Pump House A 0.20% 0.20% 10/Dec/12 0

33 Electrical TP0004-V005-00-E25-E2-026 Cabling Layout for TG Building AB Bay at El. +0.50M A 0.20% 0.20% 20/Dec/12 0

34 Electrical TP0004-V005-00-E25-E2-013 Cross sectional view of cable Tunnel of the Plant (CPP1) A 0.20% 0.20% 17/Jan/13 0

35 Electrical TP0004-V005-00-E25-E2-012 Overall cable routing layout of the plant (CPP-1) A 0.30% 0.30% 17/Jan/13 0

CABLING LAYOUT OF VERTICAL RISER IN TG BUILDING


36 Electrical TP0004-V005-00-E25-E2-023 A 0.10% 0.10% 20/Nov/12 0
BC BAY

EARTHING 0.00% 0

37 Electrical TP0004-V005-00-E08-E2-001 Composite Earthing Layout (Below ground) A 0.30% 0.30% 5/Sep/12 0

38 Electrical TP0004-V005-00-E08-E2-002 Earthing Layout 132 KV GIS Building (Floor Earthing) A 0.30% 0.30% 29/Oct/12 0

39 Electrical TP0004-V005-00-E08-E2-003 Earthing Layout of TG Deck & Steam Generator Earthing A 0.50% 0.50% 15/Oct/12 0

40 Electrical TP0004-V005-00-E08-E2-004 Earthing Layout of Transformer yard and GIS Bldg A 0.30% 0.30% 20/Oct/12 0

41 Electrical TP0004-V005-00-E08-E2-005 Earthing Layout of BTG Area A 0.15% 0.15% 8/Nov/12 0

42 Electrical TP0004-V005-00-E08-E2-006 Earthing & Lightning Prot. Layout of Chimney A 0.15% 0.15% 15/Oct/12 0

43 Electrical TP0004-V005-00-E08-E2-008 Earthing Layout of Fuel Oil PH & MCC Room A 0.20% 0.20% 15/Nov/12 0

44 Electrical TP0004-V005-00-E08-E2-009 Earthing Layout of Compressor House A 0.15% 0.15% 15/Nov/12 0

45 Electrical TP0004-V005-00-E08-E2-010 Earthing Layout of Circulating Water Pump House A 0.15% 0.15% 20/Nov/12 0

46 Electrical TP0004-V005-00-E08-E2-011 Earthing Layout of Clarified cum Fire Water Pump House A 0.15% 0.15% 20/Nov/12 0

47 Electrical TP0004-V005-00-E08-E2-012 Earthing Layout of Circulating Water Pump House MCC Room A 0.15% 0.15% 25/Nov/12 0

48 Electrical TP0004-V005-00-E08-E2-070 Earthing Layout of GIS Equipment Room A 0.15% 0.15% 25/Nov/12 0

49 Electrical TP0004-V005-00-E08-E2-052 Earthing Layout of AB Bay 5.5 Mtr A 0.15% 0.15% 2/Nov/12 0

50 Electrical TP0004-V005-00-E08-E2-054 Twin Flue Chimney Earthing & Lightning Protection Layout A 0.20% 0.20% 2/Nov/12 0

51 Electrical TP0004-V005-00-E08-E2-055 Earthing Layout of AB & BC Bay 0.0 Mtr. A 0.20% 0.20% 10/Nov/12 0

52 Electrical TP0004-V005-00-E08-E2-056 Earthing Layout of BC Bay 4.0 Mtr A 0.15% 0.15% 10/Nov/12 0

53 Electrical TP0004-V005-00-E08-E2-057 Earthing Layout of BC Bay 9.2 Mtr A 0.15% 0.15% 10/Nov/12 0

Earthing Layout of TG Building AB & BC Bay at El. 11Mtr. &


54 Electrical TP0004-V005-00-E08-E2-058 A 0.30% 0.30% 10/Nov/12 0
12 Mtr.

55 Electrical TP0004-V005-00-E08-E2-059 Earthing Layout of BC Bay 17.5 Mtr A 0.15% 0.15% 10/Nov/12 0

56 Electrical TP0004-V005-00-E08-E2-060 Earthing Layout of BC Bay 23 Mtr A 0.15% 0.15% 10/Nov/12 0

LIGHTNING PROTECTION DRAWING 0.00% 0

57 Electrical TP0004-V005-00-E08-E2-020 Lightning Protection Layout for GIS Building A 0.30% 0.30% 19/Dec/12 0

58 Electrical TP0004-V005-00-E08-E2-021 Lightning Protection Layout for TG Building A 0.20% 0.20% 1/Dec/12 0

59 Electrical TP0004-V005-00-E08-E2-023 Lightning Protection Layout for IDCT A 0.10% 0.08% 5/Dec/12 0

60 Electrical TP0004-V005-00-E08-E2-024 Overall Lightning Protection Layout A 0.30% 0.23% 5/Dec/12 0

ILLUMINATION LAYOUT DRAWING For Complete Plant


0.00% 0
Except for SG Platform

61 Electrical TP0004-V005-00-E20-E2-044 Lighting Layout of 132 KV GIS building at El. 0.50M A 0.15% 0.15% 5/Jan/13 0

62 Electrical TP0004-V005-00-E20-E2-040 Lighting Layout AB Bay 0.0 Mtr A 0.05% 0.05% 15/Dec/12 0
Tata Power KalingaNagar CPP1
Master Drawing List ABB DOCUMENT STATUS
Cumul. Engg Progress 10.23% Remaining documents 0
Planned Progress 11.00% To be submitted till date 80
Today Wednesday, June 04, 2014 Submitted till date 71
Due for Submission 9
Eng
Sl. Weight Planned Date of
Discipline Owner's Drg. No./ Document No. TITLE Cat Progres Due
No age Issue
s

RELAY SETTING 0

1 Electrical TP0004-V005-00-E-RS-001 Relay Setting of MV Switchgear A 0.15% 0.11% 20/Apr/13 0

2 Electrical TP0004-V005-00-E-RS-002 Relay Setting of LV Switchgear A 0.10% 0.08% 20/Apr/13 0

3 Electrical TP0004-V005-00-E-ST-003 System Stability Study A 0.10% 0.00% 20/Apr/13 -410

4 Electrical TP0004-V005-00-E-ST-004 Short circuit study A 0.10% 0.00% 20/Apr/13 -410

5 Electrical TP0004-V005-00-E-ST-006 Relay Setting for 132 kV GIS A 0.25% 0.13% 20/Apr/13 0

Design Notes and Details 0

6 Electrical TP0004-V005-00-E-EDN-001 Earthing and Lightning Protection Notes and details A 0.30% 0.30% 6/Sep/12 0

7 Electrical TP0004-V005-00-E-EDN-002 Cables and Cable Trays Notes and details A 0.30% 0.30% 6/Sep/12 0

8 Electrical TP0004-V005-00-E-EDN-003 Lighting System Notes and details A 0.30% 0.30% 17/Nov/12 0

9 Electrical TP0004-V005-00-E-EDN-004 Electrical Control Philosphy A 0.15% 0.11% 24/Nov/12 0

10 Electrical TP0004-V005-00-E-EDN-007 Design Basis Report for Fire Detection & Alarm A 0.20% 0.20% 13/Dec/12 0

11 Electrical TP0004-V005-00-E-EDN-009 Design Basis Report for SAS Panels A 0.20% 0.20% 10/Dec/12 0

12 Electrical TP0004-V005-00-E-EDN-008 Design Basis Report for Plant Intra Communication A 0.10% 0.00% 10/Dec/12 -541

MV Power Cable Schedule and Interconnection


0
Diagram

13 Electrical TP0004-V005-01-E-SCH-001 6.6kV Schedule-Unit Aux SWDB-1 (US1A, US1B) I 0.10% 0.10% 15/Mar/13 0

14 Electrical TP0004-V005-02-E-SCH-002 6.6kV Schedule-Unit Aux SWDB-2 (US2A, US2B) I 0.15% 0.15% 15/Mar/13 0

15 Electrical TP0004-V005-03-E-SCH-003 6.6kV Schedule-Unit Aux SWDB-3 (US3A, US3B) I 0.15% 0.15% 15/Mar/13 0

16 Electrical TP0004-V005-00-E-SCH-001 6.6kV Station SWDB (C-1,C-2, C-3, C-4) I 0.15% 0.15% 15/Mar/13 0

17 Electrical TP0004-V005-00-E-SCH-002 132KV EHV Cable Schedule I 0.15% 0.15% 15/Mar/13 0

LV Power Cable Schedule and Interconnection


0
Diagram

18 Electrical TP0004-V005-00-E-SCH-003 415 V Station PCC I 0.20% 0.20% 1/Apr/13 0

19 Electrical TP0004-V005-01-E-SCH-004 415 V Unit-1 PCC I 0.20% 0.20% 1/Apr/13 0

20 Electrical TP0004-V005-02-E-SCH-005 415 V Unit-2 PCC I 0.05% 0.05% 1/Apr/13 0

21 Electrical TP0004-V005-03-E-SCH-006 415 V Unit-3 PCC I 0.05% 0.05% 1/Apr/13 0

22 Electrical TP0004-V005-01-E-SCH-007 415 V N/E swgr-1 I 0.20% 0.20% 1/Apr/13 0

23 Electrical TP0004-V005-02-E-SCH-008 415 V N/E swgr-2 I 0.20% 0.20% 1/Apr/13 0

24 Electrical TP0004-V005-03-E-SCH-009 415 V N/E swgr-3 I 0.20% 0.20% 1/Apr/13 0

415 V PCC for Water System, DM transfer pumps and


25 Electrical TP0004-V005-00-E-SCH-010 I 0.20% 0.20% 10/Apr/13 0
clarified water sytem

26 Electrical TP0004-V005-00-E-SCH-011REV-0 DG Switchgear I 0.20% 0.20% 10/Apr/13 0

27 Electrical TP0004-V005-00-E-SCH-012 GIS 415 V switchgear, I 0.25% 0.25% 10/Apr/13 0

28 Electrical TP0004-V005-00-E-SCH-071 GIS DCDB I 0.20% 0.20% 10/Apr/13 0

29 Electrical TP0004-V005-00-E-SCH-072 GIS UPS DB I 0.00% 10/Apr/13 -420

30 Electrical TP0004-V005-00-E-SCH-013 PCC, ACDB for ADMIN Building I 10/Apr/13 -420

31 Electrical TP0004-V005-00-E-SCH-014 CW pump house MCC I 0.20% 0.20% 10/Apr/13 0

32 Electrical TP0004-V005-00-E-SCH-015 Effluent treatment plant MCC I 0.10% 0.10% 10/Apr/13 0

33 Electrical TP0004-V005-01-E-SCH-016 Unit-1 , 240 V UPSDB I 0.30% 0.30% 15/Apr/13 0

34 Electrical TP0004-V005-02-E-SCH-017 Unit-2 , 240 V UPSDB I 0.10% 0.10% 15/Apr/13 0

35 Electrical TP0004-V005-03-E-SCH-018 Unit-3 , 240 V UPSDB I 0.10% 0.10% 15/Apr/13 0

36 Electrical TP0004-V005-01-E-SCH-019 Unit -1 , 220 V DCDB I 0.20% 0.20% 15/Apr/13 0

37 Electrical TP0004-V005-02-E-SCH-020 Unit -2 , 220 V DCDB I 0.05% 0.05% 15/Apr/13 0

38 Electrical TP0004-V005-03-E-SCH-021 Unit -3 , 220 V DCDB I 0.05% 0.05% 15/Apr/13 0

39 Electrical TP0004-V005-01-E-SCH-022 240 V ACDB - Unit-1 I 0.00% 15/Apr/13 -415

40 Electrical TP0004-V005-02-E-SCH-022 240 V ACDB - Unit-2 I 0.00% 15/Apr/13 -415

41 Electrical TP0004-V005-03-E-SCH-022 240 V ACDB - Unit-3 I 0.00% 15/Apr/13 -415

42 Electrical TP0004-V005-00-E-SCH-024 415 V Fuel oil MCC I 0.10% 0.10% 15/Apr/13 0

43 Electrical TP0004-V005-00-E-SCH-025 Cable Schedule for SCADA UPS DB I 0.15% 0.15% 25/Apr/13 0

44 Electrical TP0004-V005-00-E-SCH-073 cable schedule FOR PA & EAPBAX SYSTEM I 0.05% 0.00% 25/Apr/13 -405

45 Electrical TP0004-V005-00-E-SCH-074 cable schedule FOR Compressor MCC I 0.10% 0.10% 25/Apr/13 0

46 Electrical TP0004-V005-00-E-SCH-075 cable schedule FOR Clarified Water MCC I 0.10% 0.10% 25/Apr/13 0

47 Electrical TP0004-V005-00-E-SCH-077 Station 220V DCDB I 0.10% 0.10% 25/Apr/13 0

48 Electrical TP0004-V005-00-E-SCH-079 Common UPS DB I 0.10% 0.10% 6-May-13 0

49 Electrical TP0004-V005-00-E-SCH-081 Cable schedule Auxilary Space Heater DB I 0.10% 0.10% 11-Apr-13 0

MV Swgr Control Cable Schedule and Interconnection


0.00% 0
Diagram

50 Electrical TP0004-V005-01-E-SCH-026 Unit Swgr-1A & 1B I 0.30% 0.30% 30-Apr-13 0

51 Electrical TP0004-V005-02-E-SCH-027 Unit Swgr-2A & 2B I 0.10% 0.05% 30-Apr-13 0

52 Electrical TP0004-V005-03-E-SCH-028 Unit Swgr-3A& 3B I 0.10% 0.05% 30-Apr-13 0

53 Electrical TP0004-V005-00-E-SCH-029 Station Bus-C1,C2,C3,C4 I 0.30% 0.30% 30-Apr-13 0

LV Swgr Control Cable Schedule and Interconnection


0.00% 0
Diagram

54 Electrical TP0004-V005-01-E-SCH-030 Unit Service Switchboard-1 I 0.20% 0.20% 25-Apr-13 0

55 Electrical TP0004-V005-02-E-SCH-031 Unit Service Switchboard-2 I 0.05% 0.05% 25-Apr-13 0

56 Electrical TP0004-V005-03-E-SCH-032 Unit Service Switchboard-3 I 0.05% 0.05% 25-Apr-13 0

57 Electrical TP0004-V005-00-E-SCH-033 Station Service Swithgear I 0.20% 0.20% 25-Apr-13 0

58 Electrical TP0004-V005-01-E-SCH-034 Normal/EM swgr-1 I 0.20% 0.20% 25-Apr-13 0

59 Electrical TP0004-V005-02-E-SCH-035 Normal/EM swgr-2 I 0.05% 0.05% 25-Apr-13 0

60 Electrical TP0004-V005-03-E-SCH-036 Normal/EM swgr-3 I 0.05% 0.05% 25-Apr-13 0

PCC for Water System, DM water transfer pumps and


61 Electrical TP0004-V005-00-E-SCH-037 I 0.20% 0.20% 25-Apr-13 0
Clarified water system

62 Electrical TP0004-V005-00-E-SCH-038 Admin building PCC I 0.10% 0.10% 25-Apr-13 0

63 Electrical TP0004-V005-00-E-SCH-039 CW pump house MCC I 0.10% 0.10% 25-Apr-13 0

64 Electrical TP0004-V005-00-E-SCH-040 Effluent treatment plant MCC I 0.10% 0.10% 25-Apr-13 0

65 Electrical TP0004-V005-00-E-SCH-041 UPS System Unit-1 I 0.10% 0.10% 25-Apr-13 0

66 Electrical TP0004-V005-00-E-SCH-042 Battery Charger I 0.05% 0.05% 25-Apr-13 0

67 Electrical TP0004-V005-00-E-SCH-043 DG Switchgear I 0.20% 0.20% 25-Apr-13 0

68 Electrical TP0004-V005-00-E-SCH-044 Fuel oil MCC I 0.15% 0.15% 25-Apr-13 0

69 Electrical TP0004-V005-00-E-SCH-076 cable schedule for Compressor MCC I 0.10% 0.10% 25-Apr-13 0

70 Electrical TP0004-V005-00-E-SCH-078 cable schedule for Clarified Water MCC I 0.10% 0.10% 25-Apr-13 0

Control Cable Schedule and Interconnection Diagram 0

71 Electrical TP0004-V005-01-E-SCH-051 GT-1 I 0.20% 0.20% 2-May-13 0

72 Electrical TP0004-V005-02-E-SCH-052 GT-2 I 0.05% 0.03% 2-May-13 0

73 Electrical TP0004-V005-03-E-SCH-053 GT-3 I 0.05% 0.03% 2-May-13 0

74 Electrical TP0004-V005-01-E-SCH-054 UAT-1 I 0.20% 0.20% 2-May-13 0

75 Electrical TP0004-V005-02-E-SCH-055 UAT-2 I 0.05% 0.03% 2-May-13 0

76 Electrical TP0004-V005-03-E-SCH-056 UAT-3 I 0.05% 0.03% 2-May-13 0

77 Electrical TP0004-V005-00-E-SCH-057 ST-1 I 0.20% 0.20% 10-Apr-13 0

78 Electrical TP0004-V005-00-E-SCH-058 ST-2 I 0.20% 0.20% 10-Apr-13 0

79 Electrical TP0004-V005-00-E-SCH-059 IPBD / SPBD I 0.10% 0.10% 10-Apr-13 0

80 Electrical TP0004-V005-00-E-SCH-060 132 KV GIS I 0.30% 0.30% 10-Apr-13 0


Vendo
r Drg
Eng Planned Latest Vendor Tata Vendor Soft Copy Tata Vendor Soft Copy Tata
Sl. No/ Owner's Drg. No./ Document Weight Days Soft Copy Approval Approval Approval
Discipline TITLE Cat Progre Date of Due Approval Responsibility Transmittal Transmittal Date Transmittal Receipt Transmittal Date Transmittal Receipt Transmittal Date
No Docu No. age Delayed Receipt Date code code code
ss Issue code number Number No Date Number No Date Number
ment
No.

EQUIPMENT SIZING CALCULATION 0 0 0

TRANSFORMERS 0 0 0

1 Electrical C TP0004-V005-00-E-CA-001 Station Transformer Sizing Calculation A 0.50% 0.50% 13-Sep-12 0 1 0 0 15 13-Sep-12 147 25-Sep-12 3 29 8-Oct-12 220 11-Oct-12 2 40 16-Oct-12 254 17-Oct-12 2

2 Electrical C TP0004-V005-00-E-CA-002 UAT Transformer Sizing Calculation A 0.40% 0.40% 13-Sep-12 0 1 0 0 16 13-Sep-12 145 25-Sep-12 3 30 8-Oct-12 220 23-Nov-12 2 404 8-Aug-13 283 3-Sep-13 1

Station Service Transformer , Admin & GIS Building


3 Electrical C TP0004-V005-00-E-CA-003 A 0.25% 0.25% 13-Sep-12 0 1 0 0 76 26-Nov-12 48 4-Dec-12 3 118 25-Dec-12 mail 14-Jan-13 2 730 25-Feb-14 536 5-Mar-14 1
Loads sizing calculation

4 Electrical C TP0004-V005-00-E-CA-004 Unit Service Transformer sizing calculation A 0.25% 0.25% 14-Sep-12 0 1 0 0 17 14-Sep-12 146 25-Sep-12 3 26 4-Oct-12 202 17-Oct-12 3 50 30-Oct-12 33 16-Nov-12 2

Water system, IDCT cum CW Pump Auxiliaries


5 Electrical C TP0004-V005-00-E-CA-005 A 0.20% 0.20% 10-Oct-12 0 1 0 0 51 31-Oct-12 33 16-Nov-12 3 78 27-Nov-12 6-Dec-12 2 734 3-Mar-14 536 5-Mar-14 1
Service Transformer sizing calculation
Admin & GIS Building Service Transformer Sizing
6 Electrical C TP0004-V005-00-E-CA-015 A 0.20% 0.20% 10-Oct-12 0 1 0 0 109 20-Dec-12 80 3-Jan-13 3 161 8-Feb-13 115 28-Feb-13 3 223 28-Mar-13 Mail/159 12-Apr-13 1
Calculation

7 Electrical C TP0004-V005-00-E-CA-006 ETP Service Transformer A 0.10% 0.10% 10-Oct-12 0 1 0 0 76 26-Nov-12 47 4-Dec-12 3 107 20-Dec-12 3-Jan-13 3 130 8-Jan-13 108 15-Feb-13 2

8 Electrical C TP0004-V005-00-E-CA-008 Lighting Service Transformer sizing calculation A 0.20% 0.18% 1-Dec-12 0 2 ABB 68 562 28-Nov-13 453 24-Dec-13 3 637 3-Jan-14 478 18-Jan-14 2 663 22-Jan-14 522 26-Feb-14 2

CTs and PTs 0 0 0

10/26/2012
9 Electrical C TP0004-V005-00-E-CA-150 CT & PT sizing calculation for 132 Kv GIS A 0.50% 0.50% 6-Sep-12 0 1 0 0 10 6-Sep-12 112 14-Sep-12 3 38 12-Oct-12 ERM Oct/ 23 2 57 9-Nov-12 33 16-Nov-12 2
10/30/2012
3/13/2013 /
10 Electrical C TP0004-V005-00-E-CA-007 BCT sizing calculation for GT A 0.40% 0.40% 29-Sep-12 0 1 0 0 111 21-Dec-12 86 11-Jan-13 3 181 26-Feb-13 Mail/130 21 Mar 2 474 16-Oct-13 343 29-Oct-13 1

11 Electrical C TP0004-V005-00-E-CA-011 CT sizing calculation for IPBD A 0.30% 0.30% 29-Sep-12 0 1 0 0 115 21-Dec-12 98 1-Feb-13 3 165 13-Feb-13 115 28-Feb-13 3 217 26-Mar-13 Mail/161 12-Apr 3

12 Electrical C TP0004-V005-00-E-CA-009 BCT sizing calculation for UAT A 0.40% 0.40% 25-Nov-12 0 1 0 0 108 20-Dec-12 86 11-Jan-13 3 187 28-Feb-13 128 21-Mar-13 2 474 16-Oct-13 343 29-Oct-13 1

13 Electrical C TP0004-V005-00-E-CA-067 BCT sizing calculation for ST A 0.40% 0.40% 25-Nov-12 0 1 0 0 108 20-Dec-12 86 11-Jan-13 3 180 26-Feb-13 128 21-Mar-13 2 474 16-Oct-13 343 29-Oct-13 1

BUSDUCTs 0 0 0

14 Electrical C TP0004-V005-00-E-CA-016 IPBD Sizing Calculation A 0.30% 0.30% 13-Sep-12 0 1 0 14 13-Sep-12 145 25-Sep-12 3 35 10-Oct-12 230 26-Oct-12 3 44 22-Oct-12 26 1-Nov-12 1

15 Electrical C TP0004-V005-00-E-CA-017 SPBD Sizing Calculation A 0.20% 0.20% 28-Sep-12 0 1 0 0 87 4-Dec-12 59 12-Dec-12 3 122 27-Dec-12 4-Jan-13 2 678 28-Jan-14 520 26-Feb-14 1

16 Electrical C TP0004-V005-00-E-CA-015 NSPBD Sizing Calculation A 0.20% 0.20% 28-Oct-12 0 1 0 0 79 28-Nov-12 51 6-Dec-12 3 124 31-Dec-12 4-Jan-13 3 156 6-Feb-13 108 15-Feb-13 1

EMERGENCY SOURCE 0 0 0

17 Electrical C TP0004-V005-00-E-CA-018 240V AC UPS Sizing Calculation for UNIT & Station A 0.30% 0.30% 10-Dec-12 0 1 0 0 37 11-Oct-12 27 2-Nov-12 3 203 12-Mar-13 148 9-Apr-13 1

18 Electrical C TP0004-V005-00-E-CA-019 240 AC UPS Sizing Calculation for SCADA A 0.20% 0.20% 20-Nov-12 0 1 0 0 66 20-Nov-12 42 28-Nov-12 3 136 17-Jan-13 95 25-Jan-13 3 e e 1

220V DC Battery & Battery Charger Sizing


19 Electrical C TP0004-V005-00-E-CA-021 A 0.30% 0.30% 10-Jan-13 0 1 0 0 27 4-Oct-12 ERM 17-Oct-12 3 67 20-Nov-12 6-Dec-12 3 109 20-Dec-12 82 4-Jan-13 2
Calculation

20 Electrical C TP0004-V005-00-E-CA-031 DC System Fault Sizing Calculation A 0.20% 0.20% 10-Jan-13 0 1 0 219 27-Mar-13 Mail/160 12-Apr 3 249 30-Apr-13 Mail/173 13-May-13 2 277 23-May-13 193 11-Jun-13 1

220V DC Battery and Battery charger system sizing 11/29/2012, 3/11/2013/


21 Electrical C TP0004-V005-00-E-CA-023 A 0.20% 0.20% 20-Nov-12 0 1 0 0 84
03.12.12
69 19-Dec-12 3 122 27-Dec-12 14-Jan-13 3 151 1-Feb-13 Mail/128
21 Mar 2
calculation for GIS

CABLES 0 0 0

22 Electrical C TP0004-V005-00-E-CA-022 MV Cable Sizing Calculation A 0.30% 0.30% 7-Sep-12 0 1 0 0 11 7-Sep-12 112 17-Sep-12 3 24 3-Oct-12 201 15-Oct-12 3 56 08.11.12 38 22-Nov-12 3

23 Electrical C TP0004-V005-00-E-CA-024 LV power Cable Sizing Calculation A 0.30% 0.30% 7-Oct-12 0 1 0 0 83 29-Nov-12 47 4-Dec-12 3 144 27-Jan-13 115 28-Feb-13 3 480 22-Oct-13 364 12-Nov-13 2

EARTHING AND LIGHTNING 0 0 0

24 Electrical C TP0004-V005-00-E-CA-025 Earthing conductor sizing below ground A 0.30% 0.30% 3-Sep-12 0 1 0 0 3 4-Sep-12 5 21-Sep-12 3 28 5-Oct-12 212 15-Oct-12 2 28 22-Oct-12 27 2-Nov-12 1

Earth Mat Sizing Calculation for transformer Yard


25 Electrical C TP0004-V005-00-E-CA-026 A 0.30% 0.30% 9-Nov-12 0 1 0 0 3 4-Sep-12 5 21-Sep-12 3 28 5-Oct-12 18 17-Oct-12 3 45 23-Oct-12 28 2-Nov-12 3
and GIS building area (Main Plant)

26 Electrical C TP0004-V005-00-E-CA-063 TG building lightning Protection A 0.30% 0.30% 27-Sep-12 0 1 0 0 22 28-Sep-12 235 12-Oct-12 2 65 16.11.12 29-Nov-12 1

27 Electrical C TP0004-V005-00-E-CA-028 Chimney earthing & Lighting protection A 0.30% 0.30% 8-Nov-12 0 1 0 0 9 6-Sep-12 110 14-Sep-12 3 20 27-Sep-12 189 15-Oct-12 2 59 12.11.12 41 28-Nov-12 2

Earting calculation of GIS Building and all other


28 Electrical C TP0004-V005-00-E-CA-029 A 0.20% 0.20% 5-Oct-12 0 1 0 0 9 6-Sep-12 110 14-Sep-12 3 20 27-Sep-12 189 15-Oct-12 2 59 12.11.12 41 28-Nov-12 2
small buildings
Lightning protection calculation GIS Buling and all 3/13/2013
29 Electrical C TP0004-V005-00-E-CA-030 A 0.20% 0.20% 5-Oct-12 0 1 0 0 117 25-Dec-12 82 4-Jan-13 3 188 28-Feb-13 Mail/130 /21 MAR 1
other Misc buildings
Below ground Earthing Calculation for TG & boiler
30 Electrical C TP0004-V005-00-E-CA-064 A 0.30% 0.30% 5-Oct-12 0 1 0 0 41 17-Oct-12 26 1-Nov-12 2 61 15.11.12 27-Nov-12 2 103 18-Dec-12 67 19-Dec-12 1
area

NEUTRAL GROUNDING 0 0 0

31 Electrical C TP0004-V005-00-E-CA-035 Neutral Grounding Transformer(NGT) Sizing A 0.30% 0.30% 24-Nov-12 0 1 0 0 189 1-Mar-13 Mail/151 9-Apr 3 241 22-Apr-13 172 8-May-13 2 260 13-May-13 179 21-May-13 1

32 Electrical C TP0004-V005-00-E-CA-036 UAT NGR sizing calculation A 0.20% 0.20% 3-Oct-12 0 1 0 0 36 11-Oct-12 28 2-Nov-12 3 60 15.11.12 22-Nov-12 3 91 5-Dec-12 69 19-Dec-12 3

33 Electrical C TP0004-V005-00-E-CA-062 ST NGR sizing calculation A 0.20% 0.20% 3-Oct-12 0 1 0 0 36 11-Oct-12 28 2-Nov-12 3 60 15.11.12 22-Nov-12 3 91 5-Dec-12 69 19-Dec-12 3

Illumination 0 0 0

34 Electrical C TP0004-V005-00-E-CA-103 Lighting Calc. of TG Building BC Bay at El 12M A 0.10% 0.10% 1-Dec-12 0 1 0 0 277 23-May-13 209 21-Jun-13 3 398 6-Aug-13 295 16-Sep-13 3 504 7-Nov-13 374 18-Nov-13 3

3/11/2013 /
35 Electrical C TP0004-V005-00-E-CA-101 Lighting Calc. for BC bay 0.0M A 0.10% 0.10% 1-Dec-12 1 0 146 29-Jan-13 Mail/128
21 Mar 3 495 2-Nov-13 609 13-Dec-13 442 18-Dec-13 1

36 Electrical C TP0004-V005-00-E-CA-102 Lighting Calculation for GIS Building at El. 0.50M A 0.10% 0.10% 1-Jan-13 1 0 266 16-May-13 198 17-Jun-13 3 361 12-Jul 282 3-Sep 3 447 16-Sep 319 5-Oct-13 3

37 Electrical C TP0004-V005-00-E-CA-104 Lighting Calc. of TG Building BC Bay at El 9.2M A 0.10% 0.10% 1-Jan-13 1 0 291 5-Jun-13 Mail/208 20-Jun-13 3 361 12-Jul 298 19-Sep 3 502 7-Nov-13

Lighting Calculation of Circulating Water Pump


38 Electrical C TP0004-V005-00-E-CA-106 A 0.10% 0.10% 1-Jan-13 1 0 303 14-Jun-13 218 1-Jul-13 3 653 10-Jan-14 508 19-Feb-14 1
House

39 Electrical C TP0004-V005-00-E-CA-116 Lighting Calculation of Compressor House A 0.10% 0.10% 1-Jan-13 1 0 309 18-Jun-13 Mail/231 22-Jul-13 3 438 4-Sep-13 324 8-Oct-13 3 514 9-Nov-13 468 12-Jan-14 1

40 Electrical C TP0004-V005-00-E-CA-107 Lighting Calculation of DM Water Area A 0.10% 0.10% 1-Jan-13 1 0 335 1-Jul-13 Mail/242 15-Jul-13 3 652 10-Jan-14 484 24-Jan-14 3 691 31-Jan-14 505 14-Feb-14 2

Lighting Calculation for TG Building AB Bay at El.


41 Electrical C TP0004-V005-00-E-CA-108 A 0.10% 0.10% 1-Jan-13 1 0 399 6-Aug-13 294 14-Sep-13 3 502 7-Nov-13 384 20-Nov-13 2 598 10-Dec 434 13-Dec-13 1
11Mtr
Lighting Calculation for TG Building BC Bay at El.
42 Electrical C TP0004-V005-00-E-CA-109 A 0.10% 0.10% 1-Jan-13 1 0 406 9-Aug-13 282 3-Sep 3 505 7-Nov-13 384 20-Nov-13 2 615 17-Dec 442 18-Dec-13 1
4Mtr

43 Electrical C TP0004-V005-00-E-CA-110 Lighting Calculation for Clarified Water Pump House A 0.10% 0.10% 1-Feb-13 1 0 419 22-Aug-13 314 30-Sep 3 479 18-Oct-13 346 30-Oct-13 1 MAIL MAIL 438 12-Jan-14 1

44 Electrical C TP0004-V005-00-E-CA-111 Lighting Calculation for IDCT A 0.10% 0.10% 1-Feb-13 1 0 418 22-Aug-13 314 30-Sep 3 MAIL MAIL 395 26-Nov-13 3 647 9-Jan-14 510 20-Feb-14 3

45 Electrical C TP0004-V005-00-E-CA-112 Lighting Calculation for BC Bay 17.5 Mtr A 0.10% 0.10% 1-Feb-13 1 440 5-Sep 323 8-Oct-13 3 514 9-Nov-13 397 27-Nov-13 3 647 9-Jan-14 509 19-Feb-14 1

46 Electrical C TP0004-V005-00-E-CA-113 Lighting Calculation for BC Bay 23 Mtr A 0.10% 0.10% 1-Feb-13 1 0 440 5-Sep 323 8-Oct-13 3 514 9-Nov-13 397 27-Nov-13 3 735 4-Mar-14 551 24-Mar-14 2

47 Electrical C TP0004-V005-00-E-CA-114 Illumination sizing Calculation for Fuel oil Area A 0.10% 0.10% 1-Feb-13 1 449 17-Sep 479 18-Oct-13 3 347 30-Oct-13 1

Lighting Sizing calculation of Street & Internal


48 Electrical C TP0004-V005-00-E-CA-115 A 0.10% 0.10% 1-Feb-13 1 0 455 25-Sep 324 8-Oct 3 637 3-Jan-14 530 3-Mar-14 2 737 11-Mar-14 541 13-Mar-14 1
roads of CPP-1

49 Electrical C TP0004-V005-00-E-CA-116 Lighting Sizing calculation of Compressor House A 0.10% 0.10% 1-Feb-13 1 0 e 3-Sep 324 8-Oct-13 3 509 8-Nov-13 385 21-Nov-13 2 468 12-Jan-14 1

Lighting Sizing calculation of CW Pump house


50 Electrical C TP0004-V005-00-E-CA-117 A 0.10% 0.10% 1-Feb-13 1 0 509 8-Nov 385 21-Nov-13 2 434 13-Dec-13 1
MCC room

51 Electrical C TP0004-V005-00-E-CA-118 Illumination Sizing Calculation for Transformer Yard A 0.10% 0.10% 1-Feb-13 1 0 531 12-Nov commented 3 647 9-Jan-14 501 7-Feb-14 2 718 19-Feb-14 528 28-Feb-14 1
Tata Power KalingaNagar CPP1
Master Drawing List - ABB DOCUMENT STATUS
Cumul. Engg Progress 62.29% Remaining documents 0
Planned Progress 63.00% To be submitted till date 624
Today Wednesday, June 04, 2014 Submitted till date 618
Due for Submission 6
Sl. Planned Date
Discipline Owner's Drg. No./ Document No. TITLE Cat Weightage Eng Progress Due
No of Issue

A GENERATOR TRANSFORMER(100MVA) 0
General outline drawing showing plan, front elevation, side
1 Electrical TP0004-V005-00-E16-E1-005 A 0.75% 0.75% 12-Oct-12 0
elevation with all fittings and accessories etc.
2 Electrical TP0004-V005-00-E16-E1-006 Foundation plan A 0.30% 0.30% 12-Oct-12 0
3 Electrical TP0004-V005-00-E16-E1-007 GA of Marshalling box details A 0.25% 0.25% 12-Oct-12 0

4 Electrical TP0004-V005-00-E16-E1-008 Rating and Diagram plate A 0.25% 0.25% 12-Oct-12 0

5 Electrical TP0004-V005-00-E16-E1-009 HV bushing Technical Particulars A 0.20% 0.20% 12-Oct-12 0

6 Electrical TP0004-V005-00-E16-E1-010 HVN bushing Technical Particulars A 0.20% 0.20% 12-Oct-12 0

7 Electrical TP0004-V005-00-E16-E1-011 LV bushing Technical Particulars A 0.20% 0.20% 12-Oct-12 0

8 Electrical TP0004-V005-00-E16-E1-014 GTP A 0.50% 0.50% 12-Oct-12 0

9 Electrical TP0004-V005-00-QA-MQP-002 QAP A 0.10% 0.10% 12-Oct-12 0

10 Electrical TP0004-V005-00-E16-E1-017 Schematic of OLTC control A 0.30% 0.30% 12-Oct-12 0

11 Electrical TP0004-V005-00-E16-E1-018 Schematic of FACIA and RTCC termination A 0.30% 0.30% 12-Oct-12 0

12 Electrical TP0004-V005-00-E16-E1-019 General arrangement of RTCC A 0.30% 0.30% 12-Oct-12 0

13 Electrical TP0004-V005-00-E16-E1-021 Schematic Diagram of cooler control scheme A 0.25% 0.25% 12-Oct-12 0
14 Electrical TP0004-V005-00-E16-E1-022 Valve Schedule Plate A 0.20% 0.20% 12-Oct-12 0
15 Electrical TP0004-V005-00-E16-E1-039 G.A. of C.T. Terminal Box I 0.20% 0.20% 12-Oct-12 0
16 Electrical TP0004-V005-00-E16-E1-013 Transportation details I 0.10% 0.10% 12-Oct-12 0
17 Electrical TP0004-V005-00-E16-E1-028 Online DGA Hydran M2 I 0.10% 0.10% 31-Jan-13 0
18 Electrical TP0004-V005-00-E16-E1-026 Mandatory spare parts list I 0.10% 0.09% 31-Mar-13 0
19 Electrical TP0004-V005-00-E-SI-002 Sub-Vendor Details A 0.10% 0.10% 12-Oct-12 0
20 Electrical TP0004-V005-00-E16-E1-033 Dynamic short ckt calculation I 0.10% 0.10% 12-Oct-12 0
21 Electrical TP0004-V005-00-E16-E1-034 Thermal short ckt calculation I 0.10% 0.10% 12-Oct-12 0
22 Electrical TP0004-V005-00-E-TP-001 Test Plan I 0.10% 0.10% 31-Dec-12 0
B STATION TRANSFORMER(16/20MVA) 0
23 Electrical TP0004-V005-00-E16-E1-051 Outline General Arrangement A 0.50% 0.50% 26-Nov-12 0
24 Electrical TP0004-V005-00-E16-E1-052 HV & HVN solid porcelain bushing and Technical particulars A 0.25% 0.25% 26-Nov-12 0

25 Electrical TP0004-V005-00-E16-E1-053 LV&LVN solid porcelain bushing and Technical particulars A 0.25% 0.25% 26-Nov-12 0
26 Electrical TP0004-V005-00-E16-E13-054 Rating & diagram plate A 0.20% 0.20% 26-Nov-12 0
27 Electrical TP0004-V005-00-E16-E1-055 Foundation Plan/Civil assignment drawings for ST. A 0.25% 0.25% 26-Nov-12 0
28 Electrical TP0004-V005-00-E16-E15-056 Schematic Cooler control A 0.25% 0.25% 26-Nov-12 0
29 Electrical TP0004-V005-00-E16-E1-057 General arrangement of Marshalling box A 0.20% 0.20% 26-Nov-12 0
30 Electrical TP0004-V005-00-E16-E15-058 Schematic of OLTC control A 0.25% 0.25% 26-Nov-12 0
31 Electrical TP0004-V005-00-E16-E1-060 General arrangement of RTCC A 0.20% 0.20% 26-Nov-12 0
32 Electrical TP0004-V005-00-E-DS-062 GTP A 0.30% 0.30% 26-Nov-12 0
33 Electrical TP0004-V005-00-E16-E13-063 Oil Flow diagram & Valve schedule plate I 0.25% 0.25% 26-Nov-12 0
34 Electrical TP0004-V005-00-E16-E1-064 Roller details & Rail Gauge Drawing A 0.20% 0.20% 26-Nov-12 0
35 Electrical TP0004-V005-00-E16-E1-065 Transportation details A 0.20% 0.20% 26-Nov-12 0
36 Electrical TP0004-V005-00-E16-E1-067 Mandatory spare parts list UAT Transformer I 0.10% 0.09% 31-Mar-13 0
37 Electrical TP0004-V005-00-E16-E13-080 Voltage Indicating Plate A 0.10% 0.10% 26-Nov-12 0
38 Electrical TP0004-V005-00-E16-E1-069 LV Cable Box Assembly Details A 0.25% 0.25% 26-Nov-12 0
39 Electrical TP0004-V005-00-QA-MQP-005 Quality assurance Plan A 0.25% 0.25% 26-Nov-12 0
C UNIT AUXILIARY TRANSFORMER(6/10MVA) 0
40 Electrical TP0004-V005-00-E16-E1-101 Outline General Arrangement A 0.50% 0.50% 15-Dec-12 0
41 Electrical TP0004-V005-00-E16-E1-102 HV solid porcelain bushing Technical particulars A 0.35% 0.35% 15-Dec-12 0
42 Electrical TP0004-V005-00-E16-E1-103 LV & LVN bushing Technical Particulars A 0.35% 0.35% 15-Dec-12 0
43 Electrical TP0004-V005-00-E16-E13-104 Rating & diagram plate A 0.35% 0.35% 15-Dec-12 0
44 Electrical TP0004-V005-00-E16-E1-105 Foundation Plan/Civil assignment drawings for UAT. A 0.35% 0.35% 15-Dec-12 0
45 Electrical TP0004-V005-00-E16-E15-106 Schematic Cooler control A 0.20% 0.20% 15-Dec-12 0
46 Electrical TP0004-V005-00-E16-E1-107 General arrangement of Marshalling box A 0.20% 0.20% 15-Dec-12 0
47 Electrical TP0004-V005-00-E-DS-109 GTP A 0.50% 0.50% 15-Dec-12 0
48 Electrical TP0004-V005-00-QA-MQP-005 Quality assurance plan A 0.20% 0.20% 15-Dec-12 0
49 Electrical TP0004-V005-00-E16-E1-111 Transportation details A 0.20% 0.20% 15-Dec-12 0
50 Electrical TP0004-V005-00-E16-E1-067 Mandatory spare parts list Station Transformer I 0.30% 0.27% 31-Mar-13 0
51 Electrical TP0004-V005-00-E16-E1-114 LV cable Box Assembly A 0.15% 0.15% 15-Dec-12 0
52 Electrical TP0004-V005-00-E16-E13-200 Valve Schedule Plate A 0.20% 0.20% 15-Dec-12 0
53 Electrical TP0004-V005-00-E16-E1-115 HV Busduct Assembly A 0.15% 0.15% 15-Dec-12 0
6.6 kV MV SWITCHGEAR 0
54 Electrical TP0004-V005-00-E27-E2-001 & 2 MV Swgr Cross section & base Frame Drawings A 0.50% 0.50% 26-Nov-12 0
55 Electrical TP0004-V005-00-E27-E4-001 to 4 Single Line Diagram A 0.50% 0.50% 26-Nov-12 0
56 Electrical TP0004-V005-00-E27-E1-001 to 4 MV Swgr GA drawings A 0.75% 0.75% 26-Nov-12 0
57 Electrical TP0004-V005-00-E27-E15-001 &2 Scheme Drawing of Incomer Feeder A 0.20% 0.20% 26-Nov-12 0
58 Electrical TP0004-V005-00-E27-E15-006 Scheme Drawing of Transformer Feeder A 0.20% 0.20% 26-Nov-12 0
59 Electrical TP0004-V005-00-E27-E15-007,8 & 9 Scheme Drawing of Motor Feeder A 0.20% 0.20% 26-Nov-12 0
60 Electrical TP0004-V005-00-E27-E15-003,4&5 Scheme Drawing of Tie Feeder A 0.20% 0.20% 26-Nov-12 0
61 Electrical TP0004-V005-00-E27-E15-010 Scheme drawings for Bus PT feeders A 0.20% 0.20% 26-Nov-12 0
62 Electrical TP0004-V005-00-E27-E1-009 Relay catalogues I 0.20% 0.20% 26-Nov-12 0
63 Electrical TP0004-V005-00-E27-E15-012 Logic Diagram A 0.25% 0.25% 26-Nov-12 0
64 Electrical TP0004-V005-00-E27-E15-011 & 012 BOM/Legend Sheet A 0.20% 0.20% 26-Nov-12 0
65 Electrical TP0004-V005-00-E27-E1-005 Layout of Relay & Instrument chamber A 0.15% 0.15% 26-Nov-12 0
66 Electrical TP0004-V005-00-E03-E15-001 Ethernet Switch Architecture for MV Boards A 0.10% 0.10% 26-Dec-12 0
67 Electrical TP0004-V005-00-E-DS-012 GTP A 0.25% 0.25% 26-Nov-12 0
68 Electrical TP0004-V005-00-QA-MQP-022 QAP A 0.10% 0.10% 26-Nov-12 0
69 Electrical TP0004-V005-00-E27-E1-015 Mandatory spare parts list MV Switchgear I 0.10% 0.08% 31-Mar-13 0
70 Electrical TP0004-V005-00-E-CA-078 & 79 MV Swgr CT & PT Sizing A 0.25% 0.25% 26-Nov-12 0

71 Electrical TP0004-V005-00-E-CA-076 & 77 MV Swgr Busbar Sizing & design instruction A 0.25% 0.25% 26-Nov-12 0

72 Electrical TP0004-V005-00-E27-E4-005 & 6 MV Swgr MSLD A 0.25% 0.25% 26-Nov-12 0


73 Electrical TP0004-V005-00-E-MRB-004 Type Test Report for MV Swgr I 0.15% 0.15% 11-Apr-13 0
NEUTRAL GROUNDING RESISTER 0