The document is a bill of quantities and estimation for structural works on a 2-storey residential building in Baguio City. It includes quantities of materials like concrete and reinforcing steel bars, as well as formworks needed for the building's foundation, columns, beams, slabs, and other structural elements. Calculations are shown for estimating the volumes, weights, and areas of various components. The structural works will utilize an estimated 9.70 cubic meters of concrete, 5,041.74 kg of reinforcing steel bars, and 260.24 square meters of formworks.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views

Excel Practice

The document is a bill of quantities and estimation for structural works on a 2-storey residential building in Baguio City. It includes quantities of materials like concrete and reinforcing steel bars, as well as formworks needed for the building's foundation, columns, beams, slabs, and other structural elements. Calculations are shown for estimating the volumes, weights, and areas of various components. The structural works will utilize an estimated 9.70 cubic meters of concrete, 5,041.74 kg of reinforcing steel bars, and 260.24 square meters of formworks.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 10

PROJECT: 2-STOREY RESIDENTIAL BUILDING

LOCATION: CITY CAMP CENTRAL BAGUIO CITY


OWNER:
FEBRUARY 11,2020

BILL OF QUANTITIES
MATERIAL
ITEM NO. MATERIAL DESCRIPTION QUANTITY UNIT UNIT
COST
STRUCTURAL WORKS
A CONCRETE WORKS
1.FOUNDATION 9.70 m3
2. FOOTING TIE BEAM 8.99 m3
3.COLUMNS 9.95 m3
4. SLAB ON GRADE 11.79 m3
5. SUSPENDED SLABS 8.36 m3
6. BEAM 10.87 m3

B REINFORCING STEEL BARS


1.FOUNDATION 541.74 kg
2. FOOTING TIE BEAM 1,469.36 kg
3.COLUMNS 1,906.70 kg
4. SLAB ON GRADE 1,599.45 kg
5. SUSPENDED SLABS kg
6. BEAM 2,062.01 kg

C FORMWORKS
1.FOUNDATION 26.24 m2
2. FOOTING TIE BEAM 59.96 m2
3.COLUMNS 144.15 m2
4. SLAB ON GRADE 4.64 m2
5. SUSPENDED SLABS 112.83 m2
6. BEAM 110.18 m2

PREPARED BY: PROJECT

ROBERTO G. AGUIMBAG JR. ENGR. JOHN ALLEN GUILLERMO


PROJECT ENGINEER OWNER
LABOR COST UNIT COST COST
PROJECT: 2-STOREY RESIDENTIAL BUILDING
LOCATION: CITY CAMP CENTRAL BAGUIO CITY
OWNER:
FEBRUARY 11,2020

ESTIMATION OF STRUCTURAL WORKS

For Foundation
Volume
FOOTING WITDH (m) HEIGHT (m) THICKNESS (m)
F1 1.30 1.30 0.20
F2 1.50 1.50 0.40
F3 1.30 2.40 0.40

RSB
FOOTING LENGTH (m) NO. OF SETS BAR DIAMETER (mm)
F1 1.25 14 16.00
F2 1.45 14 16.00
F3 1.25 15 16.00
2.35 7 16.00
TOTAL:
LET SPLICING FARCTOR: 1.10
FORMWORKS
FOOTING PERIMETER (m) AREA (sq.m.)
F1 5.20 8.32
F2 6.00 12.00
F3 7.40 5.92
TOTAL: 26.24 sq.m.

For Footing Tie Beam


VOLUME
WIDTH (m) HEIGHT (m) LENGTH (m)
FTB 0.30 0.40 74.95

FORMWORKS
PERIMETER (m) AREA (sq.m.)
0.80 59.96

RSB

TOTAL RSB TOTAL NO. OF STIRRUPS PERIMETER


LENGTH (m) STIRRUPS (m)
516.90 648 1.30
For Column
SET # WIDTH (m) HEIGHT (m)
C1.1 15 0.30 0.30
C1.2 2 0.30 0.30
C2.1 2 0.30 0.30

RSB
LENGTH #pcs/set DIAMETER (m)
C1.1 6.73 6 16
C1.2 2.90 6 16
C2.1 6.73 4 16

FOR LATERAL TIES


LENGTH OF L.T. #pcs/set DIAMETER (mm)
C1.1 1.10 58 10
C1.2 1.10 24 10
C2.1 1.10 58 10
TOTAL:

FORMWORKS
PERIMETER (m) AREA (sq.m.)
C1.1 1.20 121.05
C1.2 1.20 6.96
C2.1 1.20 16.14
TOTAL: 144.15 sq.m.

For Slab on Grade


FLOOR AREA
COL AREA (sq.m) # OF COL
(sq.m)
SLAB ON GRADE 119.4 0.09 17

FORMWORKS RSB
PERIMETER (m) AREA (sq.m) AREA METHOD (bar/sq.m) DIAMETER (mm)

46.4 4.64 20 10

LET SPLICING FARCTOR: 1.10

For Suspended Slab


VOLUME
FLOOR AREA
COL. AREA (sq.m) # OF COL
(sq.m)
SUSPENDED SLAB 111.37 0.09 19

For Beam
VOLUME
BEAMS WIDTH (m) HEIGHT (m) LENGTH (m)
B1 0.25 0.35 41.40
B2 0.25 0.35 15.70
B3 0.30 0.50 24.30
B4 0.25 0.40 10.33
B5 0.25 0.30 12.68
B6 0.25 0.30 3.20

RSB
LET SPLICING FARCTOR : 1.10
HOOK: 0.10

BEAM TOTAL RSB TOTAL NUMBER OF STIRRUPS DIAMETER


LENGTH (m) STIRRUPS @ MIDSPAN (m)

B1 140.13 290.00 1.10


B2 134.41 112.00 1.10
B3 223.41 168.00 1.50
B4 59.93 64.00 1.20
B5 81.80 96.00 1.00
B6 31.35 32.00 1.00

PREPARED BY: PROJECT

ROBERTO G. AGUIMBAG JR. ENGR. JOHN ALLEN GUILLERMO


PROJECT ENGINEER OWNER
AREA (sq.m) VOLUME (cu.m.) NO. OF FOOTING TOTAL VOLUME
1.69 0.34 8.00 2.70
2.25 0.90 5.00 4.50
3.12 1.25 2.00 2.50
TOTAL 9.70 cu.m.

WEIGHT (kg)
243.17
176.30
65.13
57.14
541.74 kg.

VOLUME (cu.m.)
8.99

RSB DIAMMETER
TOTAL RSB (kg)
(mm)
1,469.36 16.00
10.00
AREA (sq.m.) LENGTH (m) VOLUME (cu.m.)
0.09 6.10 8.24
0.09 3.40 0.61
0.09 6.10 1.10
TOTAL: 9.95 cu.m

WEIGHT (kg)
1,051.26
60.44
93.45

WEIGHT (kg)
590.28
32.57
78.70
1,906.70 kg

TOT. COL. AR. (sq.m.) TOT. SLAB. AR. THICKNESS (m) SLAB VOL. (cu.m.)

1.53 117.87 0.1 11.787

WEIGHT (kg)

1,599.45
TOT. COL. AR. (sq.m) TOT. SLAB. AR. (sq.m) THICKNESS (m) SLA. VOL. (cu.m)

1.71 109.66 0.08 8.36

FORMWORKS
AREA (sq.m.) VOLUME (cu.m.) PERIMETER (m) AREA (sq.m.)
0.09 3.62 0.95 39.33
0.09 1.37 0.95 14.92
0.15 3.65 1.30 31.59
0.10 1.03 1.05 10.85
0.08 0.95 0.85 10.78
0.08 0.24 0.85 2.72
TOTAL: 10.87 cu.m. TOTAL: 110.18

TOTAL STIFFENER TOTAL RSB (kg) RSB DIAMMETER


LENGTH (m) (mm)

- 555.06 16.00
- 353.83 12.00
26.76 652.41 10.00
- 179.13
- 235.87
; 85.72
TOTAL: 2,062.01 kg
FORMWORKS
PERIMETER (m) AREA (sq.m.)

41.60 112.83

sq.m.