Construction Notes: CASE-1

This document provides construction notes for a project including: 1. General notes stating shop drawings must be approved before fabrication and dimensions must be verified. 2. Concrete notes specifying minimum compressive strengths, aggregate sizes, and slump requirements for different elements. 3. Reinforcement notes stating rebar sizes and grades and minimum concrete cover requirements.

Uploaded by

Cyril Alea
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
164 views1 page

Construction Notes: CASE-1

This document provides construction notes for a project including: 1. General notes stating shop drawings must be approved before fabrication and dimensions must be verified. 2. Concrete notes specifying minimum compressive strengths, aggregate sizes, and slump requirements for different elements. 3. Reinforcement notes stating rebar sizes and grades and minimum concrete cover requirements.

Uploaded by

Cyril Alea
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

CONSTRUCTION NOTES

COMPACTED
A. GENERAL WIDTH (W) BACKFILL
1. CONSTRUCTION NOTES AND TYPICAL DETAILS APPLY TO ALL DRAWINGS UNLESS OTHERWISE SHOWN OR NOTED.MODIFY TYPICAL
DETAILS AS DIRECTED TO MEET SPECIAL CONDITIONS. NAT'L GRADE LINE
2. SHOP DRAWINGS WITH ERECTION AND PLACING DIAGRAMS OF ALL STRUCTURAL STEEL, MISCELLANEOUS IRON, PRE-CAST CONCRETE ETC. CL SEE
SHALL BE SUBMITTED FOR ENGINEER'S APPROVAL BEFORE FABRICATION. COLUMN
REBAR

BASE DEPTH (H)


3. CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE ALL WORK IS TO BEGIN, CHECK WITH MECHANICAL AND ELECTRICAL CONTRACTORS
FOR CONDUITS, PIPE SLEEVES, ETC. TO BE EMBEDDED IN CONCRETE. SCHEDULE

VARIES
4. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ADEQUATE SHORING AND BRACING OF THE STRUCTURE FOR ALL LOADS THAT 75 mm 75 mm
MAYBE IMPOSED DURING CONSTRUCTION.
ASW

LENGTH (L)
B. CONCRETE & REINFORCEMENT

THICKNESS
CL

t
1. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM WITH THE LATEST BUILDING CODE OF AMERICAN CONCRETE INSTITUTE (ACI-318). ASW 75 mm

2. ALL CONCRETE SHALL DEVELOP A MINIMUM COMPRESSIVE STRENGTH AT THE END OF TWENTY EIGHT (28) DAYS WITH CORRESPONDING
MINIMUM SIZE AGGREGATE AND SLUMPS AS FOLLOWS :

LOCATION 28 DAYS STRENGTH MAX. SIZE AGGREGATE MAX. SLUMP


ASL L X W PROVIDE 150 mm THK
COMP. GRAVEL BEDDING
SLAB ON GRADE 3000 PSI (21 KPa) 1 IN. (25MM.) 4 IN. (100MM.) ASL
FOOTINGS &
4000 PSI (28 KPa) 3/4 IN. (19MM.) 4 IN. (100MM.)
COLUMNS
FLOOR SLABS &
CASE-1
BEAMS 3000 PSI (21 KPa) 3/4 IN. (19MM.) 4 IN. (100MM.)
STAIRS AND
RAMPS 3000 PSI (21 KPa) 3/4 IN. (19MM.) 4 IN. (100MM.)
COMPACTED
BACKFILL
3. ALL REINFORCING BARS SHALL CONFORM TO ASTM A615 (PNS 49) GRADE 40 (fy = 276 MPa) FOR 12mm DIAMETER AND SMALLER BARS
AND GRADE 60 (fy = 414 MPa) FOR 16mm DIAMETER AND LARGER BARS.
WIDTH (W) SEE
4. IN GENERAL, THE LATEST EDITION OF ACI-315, MANUAL OF STANDARD PRACTICE DETAILING REINFORCED CONCRETE STRUCTURES SHALL
BE ADHERED TO, UNLESS OTHERWISE SHOWN OR NOTED. NAT'L GRADE LINE COLUMN

5. MAINTAIN A MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS: CL REBAR


SCHEDULE

BASE DEPTH (H)


SUSPENDED SLAB. . . . . . . . . . . . . . . . . . . . 3/4 IN. (20 MM.)

VARIES
SLAB ON GRADE. . . . . . . . . . . . . . . . . . . . . 1 1/2 IN. (40 MM.)
BEAM STIRRUPS AND COLUMN TIES. . . . . . . . . . . . . 1 1/2 IN. (40 MM.) 75 mm
WHERE CONCRETE IS EXPOSED TO EARTH ASW

LENGTH (L)
BUT POURED AGAINST FORMS. . . . . . . . . . . . . . . .2 IN. (50 MM.)

THICKNESS
CL
WHERE CONCRETE IS DEPOSITED

t
DIRECTLY AGAINST EARTH. . . . . . . . . . . . . . . . . 3 IN. (75 MM.) ASW 75 mm
6. SPLICES SHALL BE SECURELY WIRED TOGETHER AND SHALL LAP OR EXTEND IN ACCORDANCE WITH (TABLE OF LAP SPLICE AND ANCHORAGE HOOK AT END
LENGTH) UNLESS OTHERWISE SHOWN ON DRAWINGS, SPLICES SHALL BE STAGGERED WHENEVER POSSIBLE.

7. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS, SHALL BE PROPERLY POSITIONED AND SECURED IN PLACE PRIOR TO PLACING OF
CONCRETE. ASL L X W PROVIDE 150 mm THK
COMP. GRAVEL BEDDING
8. ALL CONCRETE SHALL BE KEPT MOIST FOR A MINIMUM OF SEVEN (7) CONSECUTIVE DAYS IMMEDIATELY AFTER POURING BY THE USE OF WET ASL
BURLAP, FOG SPRAYING, CURING COMPOUNDS OR OTHER APPROVED METHOD.

9. STRIPPING OF FORMS AND SHORES:


CASE-2
FOUNDATION. . . . . . . . . . . . . . . . 24 HRS.
COLUMNS. . . . . . . . . . . . . . . . . 3 DAYS
SUSPENDED SLAB EXCEPT WHEN
ADDITIONAL LOADS ARE IMPOSED. . . . . . . .8 DAYS
FOOTING DETAILS
SCALE NTS
WALLS. . . . . . . . . . . . . . . . . . 18 HRS.
BEAMS. . . . . . . . . . . . . . . . . . 14 DAYS

C. MASONRY
1. ALL CONCRETE HOLLOW BLOCK (CHB) SHALL USE NON-LOAD BEARING CHB UNLESS OTHERWISE SPECIFIED.

2. ALL PLASTER AND MORTAR MIXTURE SHALL USE (CLASS B) 1:3

D. STRUCTURAL STEEL
1. ALL STRUCTURAL STEEL SHALL CONFORM TO ASTM A-36 fy=36,000 PSI (248 MPa).

2. WELDING SHALL CONFORM TO AWS STANDARDS.


3. FABRICATOR SHALL SUBMIT SHOP DRAWING FOR APPROVAL OF THE ENGINEER AND THE OWNER FOR FABRICATION.

E. FOUNDATION
1. THE ALLOWABLE FOUNDATION PRESSURE USED WAS BASED ON ASSUMED VALUE OF 300 KN/SQM. BASED ON CHAPTER 7
TABLE 7-B OF THE NSCP.
2. PROVIDE ADEQUATE SHORING & PROTECTION FOR EXCAVATION OF EARTH.
3. NO FOOTING MUST REST ON FILL.

PROJECT PROPOSED THREE STOREY HOSPITAL SHEET CONTENT/S: STRUCTURAL DESIGNED BY: REVISION DATE ISSUED : 06/23/18 SHEET NO.:
CYRIL A. ALEA
DESCRIPTION DATE
OWNER MR. & MRS. CLEMENTE & DIVINA ALEA - CONSTRUCTION NOTES CAD BY : C. A. A. STRUCTURAL / CIVIL ENGINEER :
CYRIL A. ALEA
- FOOTING DETAILS
S-1
PRC Reg. No. : 2013-00298-LQ-0 Date :
BLDG. PERMIT No.__________ DATE : ________ISSUED AT : ________
- SCHEDULE OF FOOTINGS CHECKED BY : PTR : Date :
TIN : Date :
LOCATION BRGY. SAN LORENZO, LOPEZ QUEZON OWNER'S APPROVAL ENGR. RODEL O. FLORIDO PLACE : PROV. OF QUEZON