Arranged in order of their completion with last completed shown first


Status as on 04 September, 2020
All Lengths in Km.

Sr.
RO Strech NH Length Lane Mode DPR Consultant
No.
1 RO-Thiruvananthapuram Kavungal-Pallikuth 966 10 4L TBD NULL

2 RO-Bengaluru Akkalkot-Belurgi (MH/KT Border) TBD 34 4L TBD NULL

3 RO-Mumbai MH/KT Border - KT/TL Border TBD 170 4L TBD NULL


4 RO-Chandigarh (PB) Delhi-Amritsar-Katra Expressway 3, 27.74 4L EPC M/s Feedback Infra Pvt.
(Phase-I Pkg-XI) from Junction with 503A Ltd.
Amritsar-Jallandhar road (NH-3) near
Kartarpur to Junction with Amritsar-
Mehta-SriHargobindpur-Tanda road
(NH-503A) near SriHargobindpur (Km
333+880 to km 361+620)

5 RO-Vijayawada Bangalore Chennai Expressway (Phase- 25 HAM EGIS Bceom


II Pkg-I) from km.71.000 to Km 96.000 International S A in
(Bethamangala in the state of association with SECON
Karnataka to Byreddypalli) Pvt Ltd

6 RO-Delhi Delhi-Amritsar-Katra Expressway 152 37.67 4L EPC NULL


(Phase-I Pkg-V) from Junction with ,SH-
Ambala-Kaithal-Hissar road (NH-152) 10
near Kharak Pandwa village to
Junction with Patiala-Samana-Patran
road (SH-10) near Ghagga village (Km
120+250 to Km 157+920)

7 RO-Gandhinagar Delhi-Vadodara Greenfield Alignment 148N 30 8L EPC Chaitanya Project


(NH-148N) (Pkg-26) (Ch.696+890 to Consultancy Pvt. Ltd.
Ch.726+390)

8 RO-Gandhinagar Dahod - Vadodara 148N 60 8L EPC Euroestudios Consulting


Engineers Pvt. Ltd.

9 RO-Guwahati 6 New Flyovers at (i) Baihata Chariali 27 6.33 4L EPC VKS Infratech
(Start point) (ii) Baihata Chariali (End Management Pvt Ltd
point) (iii) Pathsala junction (iv)
Chapaguri junction (v) Bongaigaon
Refinery Main Gate (vi) Simlaguri
junction

10 RO-Thiruvananthapuram Ramanattuka-Kavungal 966 41.28 4L TBD NULL

11 RO-Delhi Development of 4L UER II [Package - 344P 29.6 4L EPC URS Scott Wilson India
IV] (Spur to Sonipat Bypass) from km. Pvt. Ltd. in association
0.00 to km.29.60 with AECOM India Pvt.
Ltd.

12 RO-Hyderabad KT/TL Border - Kurnool TBD 70 4L TBD NULL


Balance for Award
Arranged in order of their completion with last completed shown first
Status as on 04 September, 2020
All Lengths in Km.

Sr.
RO Strech NH Length Lane Mode DPR Consultant
No.
13 RO-Chennai Sriperumbadur - Madhuravoyal TBD 22 6L/8L TBD NULL

14 RO-Gandhinagar Ahmedabad - Dholera (Pkg II) from 751 26.54 4L EPC SMEC India Pvt. Ltd.
km. 22.00 to km. 48.52) [Sindhrej
Village - Vejallka Village]

15 RO-Thiruvananthapuram Angamaly Junction to Kundanoor 544 47 4L EPC Louis Berger Group Inc.
Junction (Ernakulam Bypass) from
km. 317.800 of NH-544 to Km.
351.865 of NH-66

16 RO-Thiruvananthapuram Thrissur-Edapally 544 64.9 6L TBD STUP Consultants Pvt


Ltd in association with
JS Environics Consultant
Pvt Ltd

17 RO-Jammu Satwari (Jammu Airport) - Kunjwani - 44 / 23 6L/8L TBD SA Infra


Vijaypur 144A
18 RO-Chandigarh (PB) Delhi-Amritsar-Katra Expressway 54 30 4L EPC NULL
(Phase-I Spur-III) 4L Access-controlled
new Amritsar bypass to Expressway
standards from Bhishambarpura to
Raja Sansi Airport (Design Ch. 69+000
to 99+000)

19 RO-Kolkata Dhupguri-End of Falakata Bypass (Pkg 31D 29 4L EPC ICT Pvt. Ltd.
IIB)
20 RO-Nagpur 4L of Khandwa - Akola 80 4L EPC M/s RITES
21 RO-Guwahati Bal. work of 4L from 140.700 Km to 27 24.38 4L EPC Almondz Global Infra-
164.080 of Nrimbanglo to Jatinga Consultant Limited in JV
section of NH-54 (27 new) (Contract with Thoughts
package No. EW-II/AS-22) Consultants Jaipur Pvt.
Ltd.

22 RO-Gandhinagar Vadodara Mumbai Expressway NE-4 36 8L HAM ICT Pvt. Ltd.


(Jujuwa to Gandeva) (Phase IB - Pkg
VIII) [Km 154.600 to Km 190.000]

23 RO-Chennai Hosur to Dhamrapuri (Pkg-1) 844 23.35 4L HAM K&J projects Pvt.Ltd in
[Neraluru - Thorapalli Agraharam] association with COS
consultancy services

24 RO-Gandhinagar Vadodara Mumbai Expressway NE-4 26 8L HAM ICT Pvt. Ltd.


(Karvad to Jujuwa) (Phase IB - Pkg IX)
[Km 128.000 to Km 154.600]

25 RO-Gandhinagar Ahmedabad - Dholera (Pkg IV) from 751 37.96 4L EPC SMEC India Pvt. Ltd.
km. 71.06 to km. 109.019) [Start of
DSIR zone - Adhelai Village]
Balance for Award
Arranged in order of their completion with last completed shown first
Status as on 04 September, 2020
All Lengths in Km.

Sr.
RO Strech NH Length Lane Mode DPR Consultant
No.
26 RO-Bengaluru MH/KT Border - Belgaum 4 78 6L TBD STUP Consultant Pvt
Ltd.
27 RO-Chennai Thoppur - Mettur - Bhavani - Erode 544H 77 4L TBD NULL
from km. 0.00 to km. 77.00

28 RO-Mumbai Vadodara Mumbai Expressway (Phase NE 4 9.98 8L HAM ICT Pvt. Ltd.
II - Pkg XVII) [Km. 69.800 to Km.
79.783 of Spur] (Bhoj - Morbe)

29 RO-Gandhinagar Vadodara Mumbai Expressway NE-4 24.6 8L HAM ICT Pvt. Ltd.
(Talsari to Karvad) (Phase IB - Pkg X)
[Km 103.400 to Km 128.000]

30 RO-Thiruvananthapuram 6L of Azhiyur-Vengalam from km. 66 39.1 6L HAM AECOM Asia Co. Ltd
189.200 to km. 230.400 of NH-66

31 RO-Thiruvananthapuram Kuttipuram to Kappirikkad on NH-66 NULL Feedback Infra Pvt Ltd

32 RO-Thiruvananthapuram Kappirikkad to Edappally on NH-66 66 87.61 4L/6L TBD Feedback Infra Pvt Ltd

33 RO-Thiruvananthapuram Paravoor-Kottankulangara 66 37.5 4L TBD SMEC International Pty.


Ltd in association with
SMEC (India) Pvt. Ltd

34 RO-Chandigarh (PB) Bhatinda (Jodhpur Romana) - Mandi 54 27.4 6L HAM LEA Associates South
Dabwali Asia Pvt Ltd - RITES (JV)

35 RO-Bhopal Dhangaon - Borgaon section (km 347B 58 4L HAM NULL


81.000 to km 139.000) [Indore - G&
Edlabad Pkg IV] 753L
36 RO-Mumbai Vadodara Mumbai Expressway (Phase NE-4 26.4 8L HAM ICT Pvt. Ltd.
II - Pkg XI) [Km. 77.000 to Km.
103.400] (Ganjad - Talsari)

37 RO-Bengaluru Bangalore Ring Road Pkg 2 [4 laning 648 38 4L/6L HAM LBG Inc.
from km. 42.000 to km. 80.00 of
Doddaballapura Bypass to Hoskote
section of NH-648 (Old NH-207)

38 RO-Gandhinagar 4L of Dhrol-Bhadra (Between Ex. Km 151A 50.4 4L HAM RITES Ltd.


5.700 to Km 13.600 of SH-25) and
Bhadra Patiya-Pipaliya Section of NH-
151A
39 RO-Vijayawada 4L with PS of Kadapa - Renigunta 716 133 4L PS HAM SM Consultants

40 RO-Raipur Urga-Pathalgaon of NH-130A 130A 87.775 4L HAM Transys Consulting Pvt.


Ltd.

41 RO-Madurai Thirumangalam - Rajapalayam 744 72 4L TBD M/s.Artefact Projects


Ltd
Balance for Award
Arranged in order of their completion with last completed shown first
Status as on 04 September, 2020
All Lengths in Km.

Sr.
RO Strech NH Length Lane Mode DPR Consultant
No.
42 RO-Chennai TN/AP border (Near Pulikundram RF)- 716B 45 4L TBD NULL
AP/TN border (Near Nagari)

43 RO-Mumbai Vadodara Mumbai Expressway (Phase NE 4 22.8 8L HAM ICT Pvt. Ltd.
II - Pkg XV) [Km. 20.200 to Km. 43.000
of Spur] (Akloli - Amne)

44 RO-Chandigarh (PB) Bhatinda Bypass 54 27 4L TBD NULL


45 RO-Mumbai Ahmednagar Bypass 222 40.6 4L HAM SNC-LAVALIN
Infrastructure Pvt. Ltd.

46 RO-Ranchi 4L of Palma to Gumla from km. 26.00 23 67 4L HAM L.N.Malviya Infra


to km. 89.170 of NH-23 Projects Pvt. Ltd.

47 RO-Gandhinagar Sanchore - Santalpur from km 67.000 - 754K 32 6L EPC STUP Consultants Pvt.
km 99.000 of NH-754K (AJ-RGBS- Ltd.
Package-3)
48 RO-Delhi Delhi-Amritsar-Katra Expressway 709 26.8 4L EPC NULL
(Phase-I Pkg-II) from Junction with ,352A
Rohtak-Panipat road (NH-709) near
Rukhi Paani village to Junction with
Jind-Panipat road (NH-352A) near
Gangana village (Km 34+000 to Km
60+800)

49 RO-Vijayawada Bangalore Chennai Expressway (Phase- 29 HAM EGIS Bceom


II Pkg-III) from km.127.000 to Km international S A in
156.000 (Bangarupalem to Gudipala association with SECON
section) Pvt Ltd

50 RO-Vijayawada Bangalore Chennai Expressway (Phase- 31 HAM EGIS Bceom


II Pkg-II) from km.96.000 to Km international S Ain
127.000 (Baireddypalle to association with SECON
Bangarupalem section) Pvt Ltd

51 RO-Delhi Delhi-Amritsar-Katra Expressway 709 34 4L EPC NULL


(Phase-I Pkg-I) from Jussur Kheri on
NH-KMP Expressway to Junction with
Rohtak-Panipat road (NH-709) near
Rukhi Paani village (Km 0+000 to Km
34+000)

52 RO-Raipur Bilaspur to Urga (km 0.00 to 70.2) of 130A 70.2 4L HAM Transys Consulting Pvt.
NH-130A Ltd.

53 RO-Chandigarh (PB) Delhi-Amritsar-Katra Expressway 3 33 4L EPC NULL


(Phase-I Spur-II) from Beas Bridge
near Goindwal Sahib to Junction with
NH-3 Near Bishambarpura four-lane
access-controlled Expressway
standards (Design Ch. 36+000 to
69+000)
Balance for Award
Arranged in order of their completion with last completed shown first
Status as on 04 September, 2020
All Lengths in Km.

Sr.
RO Strech NH Length Lane Mode DPR Consultant
No.
54 RO-Delhi Delhi-Amritsar-Katra Expressway 709A 28.85 4L EPC NULL
(Phase-I Pkg-IV) from Junction with ,152
Jind-Karnal road (NH-709A) near
Alewa village to Junction with Ambala-
Kaithal-Hissar road (NH-152) near
Kharak Pandwa village (Km 91+400 to
Km 120+250)

55 RO-Nagpur 4L of Shendra - Bidkin - 753 75 4L EPC M/s Egis India


Kasabkhedaphata AB Consulting Engineers
Private Ltd

56 RO-Nagpur Otram Ghat (tunnel) 211 14 4L HAM Amberg Engineering


(AG)
57 RO-Bhopal Indore - Harda (Pkg-I) [Indore to 47 29.6 4L HAM Lion Engineering
Raghav Garh from km. 0.00 to km. Consultant Pvt. Ltd.
29.30]
58 RO-Bhopal Indore - Harda (Pkg-II) [Raghavgarh to 47 63 4L HAM Holtec Consulting Pvt.
Nanasa from km. 29.30 to km. 92.30] Ltd.

59 RO-Delhi Delhi-Amritsar-Katra Expressway 709A 30.6 4L EPC NULL


(Phase-I Pkg-III) from Junction with ,352A
Jind-Panipat road (NH-352A) near
Gangana village to Junction with Jind-
Karnal road (NH-709A) near Alewa
village (Km 60+800 to Km 91+400)

60 RO-Bhopal 4L of Harda - Betul (Pkg-II) from Km. 47 51 4L HAM yet to be appointed


30.00 to Km.81.00 [Temagaon to
Chicholi]
61 RO-UP West Greenfield Corridor from Delhi TBD 158 4L EPC MSV International Inc.
(Crossing of EPE) to Saharanpur
Bypass & spur to Dehradun

62 RO-Chandigarh (PB) Delhi-Amritsar-Katra Expressway 503A 35.254 4L EPC M/s Feedback Infra Pvt.
(Phase-I Pkg-XII) from Junction with , 54 Ltd.
Amritsar-Mehta-SriHargobindpur-
Tanda road (NH-503A) near
SriHargobindpur to Junction with
Pathankot-Gurdaspur road (NH-54)
near Gurdaspur (Km 361+620 to km
396+8740)

63 RO-Bhubaneswar Sambalpur Bypass Road (Greenfield 1 35 4L PS TBD M/s STUP Consultant


Project) from Km. 0.00 to Km. 35.00 Pvt. Ltd.

64 RO-Chandigarh (PB) Delhi-Amritsar-Katra Expressway 54 27.126 4L EPC NULL


(Phase-II Pkg-XIII) Existing Gurdaspur-
Balsua section of NH-54 to four-lane
access-controlled Expressway
standards (Design Ch. 396+800 to
424+000)
Balance for Award
Arranged in order of their completion with last completed shown first
Status as on 04 September, 2020
All Lengths in Km.

Sr.
RO Strech NH Length Lane Mode DPR Consultant
No.
65 RO-Bengaluru Hassan Bypass from Km 175.935 to 75 10.314 4L EPC 03.01.2018
Km 185.684 and providing other
Project Facilities

66 RO-Bhopal Harda - Betul (Pkg-III) from Km. 81.00 47 40.24 4L HAM LEA Associates South
to Km.121.248 [Chicholi - Betul] Asia Pvt Ltd

67 RO-Mumbai Vadodara Mumbai Expressway (Phase NE 4 26.8 8L HAM ICT Pvt. Ltd.
II - Pkg XVI) [Km. 43.000 to Km.
69.800 of Spur] (Amne - Bhoj)

68 RO-Bengaluru Bangalore/TN border to Hoskote 648 21 4L/6L HAM Kitco

69 RO-Bengaluru Channarayanpatna Bypass from km 75 10.4 4L EPC M/s Msv International


140 449 to km 149 596 and providing Inc.,
other project facilities

70 RO-Dehradun Chutmalpur (UP/UK Border)- 72A 19.6 4L TBD M/s MSV


Dehradun INTERNATIONAL INC. in
association with MSV
INTERNATIONAL TECH
PVT. LTD.

71 RO-Jaipur Delhi-Vadodara Greenfield Alignment 148N 8.3 8L EPC Feedback Infra Pvt. Ltd
(NH-148N) (Pkg-15) (Ch. 419.000 to
Ch.427.300) [Junction with NH-12
near village Ummedpura to Major
bridge over Takli river near Nayagaon
Jageer village]

72 RO-UP East Kanpur - Lucknow (Expressway) Green 63 6L HAM Egis India Consulting
Field Engineers Pvt. Ltd.
with
NH-
27

73 RO-Bhubaneswar Kandarpur - Paradip 55 72.2 4L TBD NULL


74 RO-Delhi Delhi - EPE Crossing 709B 31.2 6L EPC NULL
75 RO-Chennai Elevated Portion of 6L Chennai - Tada - 16 11 6L TBD VAX Consultants - L&T
(Madavaram - Cholavaram from km. (JV)
11.00 to km. 21.400)

76 RO-Chennai Thachur-TN/AP border (Near 716B 27 4L TBD NULL


Pulikundram RF)
77 RO-Bengaluru Bangalore Ring Road Pkg 1 [4 Laning 648 42 4L/6L HAM LBG Inc.
from km 0.00 to km 42.00 of
Dobbaspet to Doddaballapura Bypass
section of NH-648 (old NH-207)]

78 RO-Thiruvananthapuram 6L of Taliparamba to Muzhappilangad 66 35.95 6L HAM AECOM Asia Pvt. Ltd.


from Km 134.650 to Km 170.6 of NH-
66
Balance for Award
Arranged in order of their completion with last completed shown first
Status as on 04 September, 2020
All Lengths in Km.

Sr.
RO Strech NH Length Lane Mode DPR Consultant
No.
79 RO-Bhopal Indore - Edlabad (Pkg-III) [Balwara to 347B 38 4L HAM lion engineering
Dhangaon] G consultants
80 RO-Bengaluru Kumta Bypass 66 8 4L TBD Indian Technocrats Ltd

81 RO-Raipur 4L of Pathalgaon-Kunkuri-CG/ JH 43 100 4L HAM SA Infrastructure


Border from km. 466.52 to km. Consultants Pvt Ltd
598.00
82 RO-Nagpur Pangare-Waranga Phata 161 40.28 4L EPC Marc Technocrats Pvt.
Ltd.

83 RO-Mumbai 4L of Ahmednagar - Mirajgaon - 516A 38.78 4L HAM Monarch Surveyors


Karmala - Tembhurni (Pkg-I)
[Ahmednagar to Ghogargaon] from
km. 0.00 to km. 38.775 of NH-516A

84 RO-Mumbai 4L of Ahmednagar - Mirajgaon - 516A 41.62 4L HAM Monarch Surveyors


Karmala - Tembhurni (Pkg-II)
[Ghogargaon to Ahmednagar- Solpaur
District Border] from km. 38.775 to
km. 80.390 of NH-516A

85 RO-Bhopal Bhopal-Salamatpur-Vidisha bypass 146 55 4L TBD STUP Consultant Pvt


Ltd. - CEOMA Pvt. Ltd.
(JV)
86 RO-Bhopal Gyaraspur - Bhapel 146 64 4L HAM STUP Consultant Pvt
Ltd. - CEOMA Pvt. Ltd.
(JV)
87 RO-Vijayawada OD/AP Border - Sabbavaram 130C 100 6L HAM Chaitanya Project
D Consultancy Pvt. Ltd.

88 RO-Chandigarh (HR) 6L Mandi Dabwali (Punjab/Haryana 54 34.8 6L HAM RITES Ltd


border) Sangaria road section from
proposed Mandi Dabwali Bypass to
Chautala from km. 27.400 to km.
62.200 of NH - 54

89 RO-Gandhinagar Ahmedabad - Dholera (Pkg III) from 751 22.54 4L EPC SMEC India Pvt. Ltd.
km. 48.52 to km. 71.06) [Vejallka
Village - Start of DSIR zone]

90 RO-Mumbai Six Laning of Satara-Kagal Pkg-I from 48 42.95 6L HAM Louis Berger Group Inc.
km. 592.40 to km. 639.00 of NH-48
(Old NH-4)
91 RO-Mumbai Six Laning of Satara-Kagal Pkg-II from 48 39.5 6L HAM Louis Berger Group Inc.
km. 639.00 to km. 678.50 of NH-48
(Old NH-4)
92 RO-Bengaluru 4/6L of Bangalore - Pune Section of 4 30.35 4L/6L BOT Toll CV Kand Consultants P.
bypass connecting Dharwad - Hubli Ltd.,
from km. 403.80 to km. 433.20
Balance for Award
Arranged in order of their completion with last completed shown first
Status as on 04 September, 2020
All Lengths in Km.

Sr.
RO Strech NH Length Lane Mode DPR Consultant
No.
93 RO-Bengaluru Bangalore Ring Road (STRR) - NH - 948A 8.1 6L HAM Louis Berger Group Inc.
948A - Package-II of Phase-II from to
BNP elevated highway in the entire
core area of BNP and in adjoining ESZ
area @ 1 km each on both sides
including approaches from km
112.600 to km 120.700

94 RO-Bengaluru Bangalore Ring Road (STRR)-NH-948A- 948A 23.78 6L HAM Louis Berger Group Inc.
Package-III of Phase-II from BNP to
Belagondapalli(TN) from km 120.700
to 144.480

95 RO-Bengaluru Bangalore Ring Road (Tamil Nadu 50 4L HAM M/s. KITKO Ltd.
Portion - Hosur - Sarjapura)

96 RO-Thiruvananthapuram 6L of Chengala - Neeleshwaram from 66 37.27 6L HAM AECOM Asia Pvt. Ltd.
km. 56.200 to km. 93.468

97 RO-Chennai Tambaram - Chengalpattu - 45 93 8L Item VAX Consultants Pvt.


Tindivanam Rate Limited, in JV with L&T
Infrastructure
Engineering Ltd

98 RO-Bhubaneswar 6L Capital Region Ring Road from 1 70.5 6L TBD NULL


Palatotapada (NH-16) to Kuspangi
(NH42) revised as from Rameswar
(NH-16) to Gobindpur (NH-42) from
Km.0.000 to Km.70.500

99 RO-Bengaluru Bangalore Ring Road (STRR)-NH-948A- 948A 32.7 6L HAM Louis Berger Group Inc.
Package-II of Phase-I from Magadi to
Ramanagara from km 46.300 to 79.00

100 RO-Bhopal Vidisha - Melhua Choraha 346 77 4L TBD LEA Associates South
Asia Pvt Ltd

101 RO-Bengaluru 4L of Addahole (Near Gundya) to 75 14.57 4L EPC M/s Yongma


Bantwal Cross section (Pkg-01) from Engineering Co.Ltd in JV
Design Km 255.703 to Design Km with DONG IL
270.270 of NH-75 (Old NH-48) Engineering Consultants
Co., Ltd and in
association with Cho &
Kim Engineering Pvt Ltd.
Balance for Award
Arranged in order of their completion with last completed shown first
Status as on 04 September, 2020
All Lengths in Km.

Sr.
RO Strech NH Length Lane Mode DPR Consultant
No.
102 RO-Bengaluru 4L of Addahole (Near Gundya) to 75 45.445 4L EPC M/s Theme Engineering
Bantwal Cross section (Pkg-02) from Services Pvt Ltd
Design Km 270.270 to Design Km
311.040 and from Design Km 314+080
to Design km 318+755 of NH-75 (Old
NH-48)

103 RO-Chennai TN/AP Border (Near Pullur PF)-Chittor 716B 37 4L TBD NULL

104 RO-Bhopal Raj/MP Border-Ujjain Yet to 134 4L TBD MSV International Inc.
be
declar
ed

105 RO-Bengaluru 6L Bridge on Palguni River near Kulur 66 0.776 6L EPC M/s STUP Consultants
at Km. 368.849 (From km 368.356 to Pvt. Ltd.
km 369.132) of NH-66

106 RO-Hyderabad Khammam - Devarapalle pkg. 1 44.94 4L EPC K&J Projects Pvt. Ltd.
(Thallampadu village to
Ramanujavaram village)
107 RO-Hyderabad Khammam - Devarapalle pkg. 2 44.94 4L EPC K&J Projects Pvt. Ltd.
(Ramanujavaram village to
Telangana/AP Border)
108 RO-Vijayawada Khammam - Devarapalle pkg. 3 36.13 4L EPC K&J Projects Pvt. Ltd.
(Telangana/AP Border to
Borrampalem village)
109 RO-Vijayawada Khammam - Devarapalle pkg. 4 36.13 4L EPC K&J Projects Pvt. Ltd.
(Borrampalem village to Devarapalle
village)
110 RO-Kolkata 6L of Palsit - Dhankuni from Km. 19 63.83 6L BOT Toll Chaitanya Project
588.870 to Km. 652.870 Consultancy Pvt. Ltd.

111 RO-Mumbai Balance work under Phase-II for 4L 60 8.634 4L EPC M/s CEG
of Khed Sinner Section comprising of
(i) Kalamb bypass (km 68.576 to km
72.390), (ii) Linear length of
Bhatkalwadi (km 89.550 to km
90.400) and Alephata bypass (km
92.030 to km 96.000)

112 RO-Mumbai Nashik Phata to Khed 60 29.81 6L HAM M/sCEG


113 RO-Nagpur Bodhre - Dhule 211 67 4L HAM M/s. CEG India
114 RO-Chandigarh (PB) Malout - Mandi Dabwali 9 30.5 4L TBD URS pvt Ltd
115 RO-Jaipur Four Lane (including Elevated Portion 52 9.91 4L HAM Thoughts Consultants
in Mukundra Hills National Park) from Jaipur Pvt. Ltd.
km 289/50 to 299/0 (Darah-Jhalawar-
Teendhar)

116 RO-Gandhinagar Ahmedabad - Dholera (Pkg I) from 751 22 4L EPC SMEC India Pvt. Ltd.
km. 0.00 to km. 22.00) [Sardar Patel
Ring Road - Sindhrej Village]
Balance for Award
Arranged in order of their completion with last completed shown first
Status as on 04 September, 2020
All Lengths in Km.

Sr.
RO Strech NH Length Lane Mode DPR Consultant
No.
117 RO-Hyderabad Warangal - Karimnagar 563 65 4L TBD M/s K&J Projects
Private Limited
118 RO-UP West Garhmukteshwar (km. 83.200 of NH- 709A 50.254 4L EPC SAI Consulting
24) to Meerut (km. 9.860 of NH-235) Engineers Pvt. Ltd.
including connector to NH-119

119 RO-Chandigarh (PB) Moga - Bagha Purana - Bajakhana 105B 43.32 4L HAM LEA Associates South
from km. 0.00 to km. 43.32 Asia Pvt Ltd

120 RO-Chennai Bangalore to Chennai Expressway 106 6L EPC M/s EGIS BCEOM
(Phase III) International S.A. in
association with M/s
SECON Pvt. Ltd.,

121 RO-Chennai Chennai - Salem 179A, 277 6L TBD M/s Feedback Infra Pvt.
179B Ltd in Association with
M/s Prasuna Infra Pvt.
Ltd.

122 RO-Gandhinagar Delhi-Vadodara Greenfield Alignment 148N 29 8L EPC Chaitanya Project


(NH-148N) (Pkg-27) (Ch.726+390 to Consultancy Pvt. Ltd.
Ch.755+390)

123 RO-Gandhinagar Delhi-Vadodara Greenfield Alignment 148N 26 8L EPC Chaitanya Project


(NH-148N) (Pkg-28) (Ch.755+390 to Consultancy Pvt. Ltd.
Ch.780+920)

124 RO-Bengaluru Bangalore Ring Road (STRR)-NH-948A- 948A 35.489 6L HAM Louis Berger Group Inc.
Package-I of Phase-III from
Belagondapalli (TN) to TN/KNT border
from km 144.480 to 179.969

125 RO-Bengaluru Bangalore-Chennai Expressway- NE-5 26.4 8L HAM Egis India Consulting
Package-I of Phase-I from km 0.00 to Engineers Pvt. Ltd.
km 26.400 from Bangalore- Malur

126 RO-Bengaluru Bangalore-Chennai Expressway- NE-5 27.1 8L HAM Egis India Consulting
Package-II of Phase-I from km 26.400 Engineers Pvt. Ltd.
to km 53.500 from Malur - Bangarpet

127 RO-Bengaluru Bangalore-Chennai Expressway- NE-5 17.5 8L HAM Egis India Consulting
Package-III of Phase-I from km 53.500 Engineers Pvt. Ltd.
to km 71.00 from Bangarpet-
Bethamangala

128 RO-Bengaluru Bangalore Ring Road (STRR) –NH- 948A 46.3 6L HAM Louis Berger Group Inc.
948A-Package-I of Phase-I from
Dobbaspet to Magadi from km 0.00
to 46.300

129 RO-Bengaluru Bangalore Ring Road (STRR)-NH-948A- 948A 33.6 6L HAM Louis Berger Group Inc.
Package-I of Phase-II from
Ramanagara to BNP from km 79.00 to
112.600
Balance for Award
Arranged in order of their completion with last completed shown first
Status as on 04 September, 2020
All Lengths in Km.

Sr.
RO Strech NH Length Lane Mode DPR Consultant
No.
130 RO-Bhopal Sanchi Spur Green 3 4L HAM STUP Consultant Pvt
field Ltd. - CEOMA Pvt. Ltd.
(JV)

131 RO-Bhopal Vidisha bypass - Gyaraspur 146 55 4L HAM STUP Consultant Pvt
Ltd. - CEOMA Pvt. Ltd.
(JV)
132 RO-Raipur Durg-Raipur Bypass Section (Package - 53 44.5 4L PS HAM Transys Consulting Pvt.
1) from km. 0.00 to km. 44.50 (near Ltd.
Tendesara to near Khatti Village)

133 RO-Bhopal Bhapel - Sagar 146 14 4L HAM STUP Consultant Pvt


Ltd. - CEOMA Pvt. Ltd.
(JV)
134 RO-Thiruvananthapuram 6L of Perole (Nileshwar town) to 66 40.4 6L HAM AECOM Asia Pvt. Ltd.
Taliparamba from Km 94.248 to Km
134.650 of NH-66
135 RO-Bhopal Sagar - Mohari from Km.8 to Km.50 934 42.3 4L HAM URS Scott Wilson India
(Pkg-I) Pvt. Ltd.

136 RO-Raipur Raipur to CG/OD Border (Raipur 130C 123 4L HAM Yogama Engineering
Vishakapatnam Economic Corridor) D Pvt.Ltd - ARKITEKNO
(JV)

137 RO-Gandhinagar Delhi-Vadodara Greenfield Alignment 148N 20 8L EPC Chaitanya Project


(NH-148N) (Pkg-30) (Ch 803+420 to Consultancy Pvt. Ltd.
Ch.824+920) [Baletiya Village -
Junction near Pratap Nagar Village]

138 RO-Kolkata Teesta bazar-Pedong TBD 37 2L PS TBD M/s RITES Ltd.


139 RO-Chandigarh (PB) Delhi-Amritsar-Katra Expressway 3 39.21 4L EPC M/s Feedback Infra Pvt.
(Phase-I Pkg-X) from Junction with Ltd.
Phillaur-Nakodar road near Nurmahal
village to Junction with Amritsar-
Jallandhar road (NH-3) near Kartarpur
(Km 294+670 to km 333+880)

140 RO-Vijayawada Jyothi Mahal Junction (16.493982, 16 2 4L EPC Aarvee Associates


80.648718)-Ramesh Hospital Junction Architects Engineers &
(16.512375, 80.667633) Consultants pvt. ltd.

141 RO-Chandigarh (HR) Saha - Shahbad from Km. 14.860 to 444A 18 4L EPC M/s Bloom
Km. 32.600 International
142 RO-Vijayawada Renigunta - Poyya - Naidupeta km 71 57.046 6L HAM Chaitanya Project
124.60 to km 183.4 of NH 71 Consultancy Pvt. Ltd.

143 RO-Nagpur 4L of Gadchiroli - TL/MH Border 75 4L TBD M/s.RITES Limited


Balance for Award
Arranged in order of their completion with last completed shown first
Status as on 04 September, 2020
All Lengths in Km.

Sr.
RO Strech NH Length Lane Mode DPR Consultant
No.
144 RO-Shimla 4L of End of Pinjore Bypass - Baddi - 21A 13.8 4L EPC Ramboll India Private
Nalagarh section (Pkg-01) (from Limited
Pinjore bypass to HR/HP Border) (km.
4.200 to km. 18.00) of NH-21A

145 RO-Ranchi 4L from Km 219.600 (Khajuri) to Km 75 42 4L HAM L. N. Malviya Infra


260.483 (Wyndhamganj) on NH-75 Projects Pvt. Ltd.,
(Sec-V) Bhopal
146 RO-Ranchi 4L from km 196.87 (Sankha) to km 75 22.73 4L HAM L.N.Malviya Infra
219.6 (Khajuri) on NH-75 [Rehla / Projects Pvt. Ltd.,
Garhwa Bypass] Bhopal
147 RO-Ranchi 4L from Km 147.450 (Bhogu) to Km 75 49 4L HAM L.N. Malviya Infra
196.870 (Sankha) on NH-75 (Sec-III) Projects Pvt. Ltd.,
Bhopal
148 RO-Ranchi 4L from Km 95.400 (Udaipura) to Km 75 52 4L HAM L.N. Malviya Infra
147.450 (Bhogu) on NH-75 (Sec-II) Proejcts Pvt. Ltd.,
Bhopal
149 RO-Madurai Nagapattinam - Rameswaram - 32 331.75 4L TBD Louis Berger Group Inc.
Tuticorin section of NH-32

150 RO-Madurai Tuticorin - Thiruchendur section of SH- SH- 55.46 4L TBD Aarvee Associates
176 (East Coast Rorad) 176 Architects Engineers &
Consultants Pvt. Ltd.

151 RO-Chandigarh (PB) Amritsar(airport Junction) - Ramdas 354 39.165 4L/2L EPC Frischmann Prabhu
from km. 100.835 to km. 140.00 PS (India) Pvt Ltd
(Package - IV)
152 RO-UP East 4L of Sonauli - Gorakhpur 29 80 4L EPC Theme Engineering
Services Pvt. Ltd.

153 RO-Kolkata Kona elevated Expressway from 0.557 117 7 8L HAM M/s RITES. DPR done by
km to 7.163 km of NH-117 (7 km) PWD and handed over
to NHAI.

154 RO-Chennai Elevated road from Chennai port to 20 4L TBD M/s L&T IEL in JV with
Mauravoyal M/s. Vax Consultant

155 RO-Mumbai MMLP Mumbai TBD 0 Others TBD M/s. Howe Engineering
Project (India) Pvt. Ltd
in Consortium with M/s.
CBRE South Asia Pvt.
Ltd Asia Pvt. Ltd

156 RO-Thiruvananthapuram Consultancy project for flyovers at 66 48 4L EPC NULL


four junctions on Edappally-Aroor
stretch on NH-66 (old NH-47)

157 RO-Bhubaneswar 6L of Chandikhole - Paradip Section 53 76.59 6L TBD NULL


from Km.0.000 to Km.76.588 of NH -
53
Balance for Award
Arranged in order of their completion with last completed shown first
Status as on 04 September, 2020
All Lengths in Km.

Sr.
RO Strech NH Length Lane Mode DPR Consultant
No.
158 RO-Mumbai 4L of Ratnagiri - Kolhapur - Solapur 166 48.1 4L HAM K&J Projects Pvt. Ltd.
Section Pkg-I from km. 0.00 to km.
19.80 (Mirya to Hatkhamba) & from
km. 31.00 to km. 59.30 (Pali to
Sakharpa)

159 RO-Mumbai Dharampuri-Lonand from km. 117.00 965 50.4 4L EPC Technocrats Advisory
to 166.40 (Pkg-IV) on Mohol-Alandi Services Pvt. Ltd in
Section Asso. with Sugam
Techocrats Pvt. Ltd.

160 RO-Mumbai Jejuri-Hadapsar from km. 198.000 to 965 36.15 4L EPC Technocrats Advisory
234.150 (Pkg-VI) including bypass at Services Pvt. Ltd in
Saswad of 5.2 km. on Mohol-Alandi Asso. with Sugam
Section Techocrats Pvt. Ltd.

161 RO-Mumbai Lonand-Jejuri from km. 166.400 to 965 31.6 4L EPC Technocrats Advisory
198.000 (Pkg-V) including bypass Services Pvt. Ltd in
Lonand - Neera on Mohol-Alandi Asso. with Sugam
Section Techocrats Pvt. Ltd.

162 RO-Chennai End point of BCE Pkg-III - End point of 4 23.2 6L/8L HAM M/s. VAX Consultants
BCE Pkg-IV Pvt. Limited, in JV with
L&T Infrastructure
Engineering Ltd

163 RO-Mumbai Flyovers from Old Pune Naka to 9 5.45 4L EPC Yogama Engineering
Satrasta chowk till ROB at Vijayapura Pvt.Ltd - Spectrum
Road, -Flyovers from Old Pune Naka Techno Consultant Pvt.
to Satrasta chowk till ROB at Ltd. (JV)
Vijayapura Road,

164 RO-Mumbai 4L of Ratnagiri - Kolhapur - Solapur 166 36.7 4L HAM K&J Projects Pvt. Ltd.
Section Pkg-II from km. 74.300 to km,
111.00 (Kerle to Paijarwadi)

165 RO-Shimla 4L of Sihuni-Mandi from km. 51.00 to 154 157 4L HAM Feedback Infra Private
km. 208.00 of Old NH-20 Limited In Joint
Venture with Casta
Engineers Pvt. Ltd.

166 RO-Mumbai 4L of Ratnagiri - Kolhapur - Solapur 166 33.3 4L HAM K & J Projects Pvt. Ltd
Section Pkg-III from km. 111.000 to
km. 144.300 (Paijarwadi to Kerle &
Kolhapur Bypass Kerle to Chokak)
Balance for Award
Arranged in order of their completion with last completed shown first
Status as on 04 September, 2020
All Lengths in Km.

Sr.
RO Strech NH Length Lane Mode DPR Consultant
No.
167 RO-Ranchi 4L of Mirzachowki-Farakka section 80 50.3 4L TBD NULL
(PKG-II) of NH-80
168 RO-Shimla Jwalamukhi-Hamirpur Bypass 205 41 4L EPC M/s Intercontinental
Consultants and
Technocrats Pvt. Ltd.

169 RO-UP West 2L PS of Mathura-Hathras from km. 530B 66 2L PS EPC M/s Secon GIS Driven
0.00 to km. 66.00 of NH-530B Design Consultancy

170 RO-Mumbai 4L of Ratnagiri - Kolhapur - Solapur 166 15 4L HAM K&J Projects Pvt. Ltd.
Section Pkg-IV from km. 59.300 to
km. 74.300 (Sakharpa - Kerle
(Shahuwadi - Tehsil)) including Amba
Ghat section

171 RO-Patna 4L of Devgarh Choraha (Sultanganj) to 80 41.175 4L EPC M/s SAI Consulting
Ghogha Junction from km 111.00 to Engineers Pvt.
km 152.100

172 RO-Bengaluru 4L of Sannur to Bikarnakatte section 169 46 4L TBD M/s feedback Infra Pvt
from Km 691.350 to Km 736.362 of Ltd
NH-169 Karkala - Mangalore (Package-
III)
173 RO-Patna 4L of Ghogha Junction to 80 41.813 4L EPC M/s SAI Consulting
Mirzachowki from km 152+100 to km Engineers Pvt.
193.876
174 RO-UP East 2L PS of Raebareli - Jagdishpur with 4L 330A 47.7 4L/2L HAM k& J Project Private
Jagdishpur Bypass Spur PS Limited

175 RO-UP West 4L of End of Hardoi district - Lucknow 731 36.944 4L TBD M/s Wadia Techno
from km. 229.02 to km. 266.014 Engineering Services
Limited

176 RO-Thiruvananthapuram Munnar to Mattakuzhy on NH-85 85 111 4L TBD TPF Getinsa


Eurostudioes SL in JV
with TPF Engineering
Pvt Ltd

177 RO-Jaipur Udaipur- Kundal - Naya Kheda - 58 E 145 2L PS TBD NULL


Jhadol - Som - Nalwa - Daiya(Gujarat
Border) - Idar
178 RO-Patna Bakhtiyarpur-Rajauli Pkg-II from km. 20 47.225 4L HAM SA Infrastructure
54.405 to km.101.630 Consultants Pvt. Ltd.

179 RO-Patna Bakhtiyarpur-Rajauli Pkg-III from km. 20 50.89 4L HAM SA Infrastructure


101.630 to km.152.520 Consultants Pvt. Ltd.

180 RO-Chandigarh (PB) 2/4L of Ghoman-Tanda 503A 31.6 2L/4L HAM Consulting Engineering
Associates

181 RO-Shimla Mataur-Jwalamukhi (Jwalamukhi - 88 36.43 4L EPC ICT Pvt. Ltd.


Kangra Bypass) from Km 157.000 to
Km 193.426
Balance for Award
Arranged in order of their completion with last completed shown first
Status as on 04 September, 2020
All Lengths in Km.

Sr.
RO Strech NH Length Lane Mode DPR Consultant
No.
182 RO-Shimla 4L of Shimla-Mataur section of NH-88 88 39.01 4L EPC M/s ICT Pvt. Ltd.
from km 77.00 to ch 116.800 (Bhager
to Hamirpur Bypass- Package-III)

183 RO-Shimla 4L of Shimla-Mataur section of NH-88 88 34 4L EPC M/s Intercontinental


from km 27.00 to ch 61.00 (Shalghat Consultants and
to Nauni Chowk -Package-II) Technocrats Pvt. Ltd.

184 RO-Shimla 4L of Shimla-Mataur section of NH-88 88 27 4L EPC M/s Intercontinental


from km 0.00 to ch 27.00 (Shimla to Consultants and
Shalaghat - Package-I) Technocrats Pvt. Ltd.

185 RO-Patna 4L of Munger to Devgarh Choraha 80 41.484 4L EPC M/s SAI Consulting
(sultanganj) from km 69+520 to km Engineers Pvt.
111.00
186 RO-Patna Munger - Mirzacowki (Pkg II & III) 80 100 4L TBD NULL
(100 km.)
187 RO-UP West 4L of Shahjahanpur to end of Hardoi 731 85.641 4L TBD M/s Wadia Techno
bypass from km. 89.00 to km. Engineering Services
174.641 Limited

188 RO-UP West 4L of End of Hardoi bypass - End of 731 54.43 4L TBD M/s Wadia Techno
Hardoi district from km.174.641 to Engineering Services
km. 229.070 Limited

189 RO-Raipur 4 laning of Champa - Korba from km 149B 38.2 4L HAM Dhruv Consultancy
0.00 to km 36.00 Services Ltd

190 RO-Patna Umagaon-Saharsa (Package-I) 227L 47.75 2L TBD VKS Infratech


Umagaon-Basopatti-Kaluahi & and Management Pvt. Ltd.
Sharghat-Benipatti-Rahika 227J

191 RO-Patna Umagaon-Saharsa (Package-II) Rahika 527A 14.88 2L TBD VKS Infratech
& Madhubani Bypass (Rahika- Management Pvt. Ltd.
Pokharauni-Rampatti)

192 RO-Chandigarh (PB) 2/4L of Amritsar - Ghoman 503A 45.33 2L/4L HAM Consulting Engineering
Associates

193 RO-Kolkata Joka-Namkhana 2 80.881 4L BOT Toll NULL

194 RO-Ranchi Hariharganj to Parwa Mode section 98 33.765 4L HAM Shweta Technophile
from km 23.284 to km 57.049 of NH- Consultant Pvt Ltd,
98 Ghaziabad.

195 RO-UP West 2L PS of Agra - Jalesar - Etah of NH- 321G 76 2L PS EPC M/s L.N. Malviya
321G Infraprojects Pvt. Ltd.

196 RO-Patna Bakhtiyarpur-Rajauli Pkg-I from km. 20 6.682 4L HAM SA Infrastructure


47.723 to km. 54.405 Consultants Pvt. Ltd.
Balance for Award
Arranged in order of their completion with last completed shown first
Status as on 04 September, 2020
All Lengths in Km.

Sr.
RO Strech NH Length Lane Mode DPR Consultant
No.
197 RO-UP East Raebareli to Allahabad (4L) 24B 106 4L HAM Consulting Engineering
Services (I) Pvt. Ltd.

198 RO-Madurai Ramanathapuram - Dhanushkodi 87 64.56 4L TBD Feedback Infra Pvt. Ltd

199 RO-Madurai Paramakudi - Ramanathapuram 87 46.68 4L TBD Feedback Infra Pvt. Ltd

200 RO-Nagpur Bamni-MS - Telengana Border 930D 31.8 4L EPC M/s. Mukesh &
Associates
201 RO-Ranchi Jarmundi-Deoghar 114A 38 4L TBD Jindal Consurtium

202 RO-Bhopal Ujjain to Badnawar from km 49.460 SH-18 46.9 4L TBD SA Infrastructure
to km 96.750 Consultants Pvt. Ltd.

203 RO-Bhopal 4L of Dewas - Ujjain from km. 0.0 to Yet to 45 4L HAM SA Infrastructure
km. 19.76 of Old SH 18 including be Consultants Pvt. Ltd.
Ujjain Bypass (Km. 19.76 to km. 26.9) declar
& Dewas Bypass (Km. 0.00 to km. ed
14.52)
204 RO-Madurai 2L PS of Nagapattinam - Thanjavur 83 65.373 2L PS EPC Wilbur Smith Associates
from Km 1.600 to Km 16.690 & Km.
29.850 to Km. 80.133 of Old NH-67
(New NH-83)

205 RO-Madurai Attur (Road) - Krishnapuram - 136 65 2L PS TBD


Perambalur on NH 136
206 RO-Hyderabad Kodad - Khammam 365A 33 4L TBD K&J Projects Pvt. Ltd.

207 RO-Ranchi 4L of Section from Pirpainti (km. TBD 49 4L TBD NULL


1.700 of NH-80) in the state of Bihar
to Gandhigram, Godda (km. 50.800 of
NH -133) in the state of Jharkhand
(Package I)

208 RO-Ranchi 4L of Gandhigram - Hansdiha from TBD 45 4L TBD NULL


km. 50.800 to km. 94.00 of NH -133
(Package-II)
209 RO-Chennai AP/TN border (Near Nagari)-TN/AP 716B 16 4L TBD NULL
Border (Near Pullur PF)
210 RO-Chennai Mahabalipuram - Pondicherry (Pkg-II) 332A 31 4L HAM M/s. Aarvee Associates
[Mugaiyur to Marakkanam]

211 RO-Chandigarh (PB) Malout - Abohar - Sadhuwali 7 69.6 4L HAM URS Scott Wilson India
Pvt. Ltd.

212 RO-Nagpur 4L of Aurangabad-Paithan 752E 52 4L EPC M/s Egis India


Consulting Engineers
Private Ltd

213 RO-Chennai Mahabalipuram - Pondicherry (Pkg-III) 332A 43 4L HAM M/s. Aarvee Associates
Balance for Award
Arranged in order of their completion with last completed shown first
Status as on 04 September, 2020
All Lengths in Km.

Sr.
RO Strech NH Length Lane Mode DPR Consultant
No.
214 RO-Shimla 4L of HP/Punjab Border - Sihuni from 154 40 4L EPC Feedback Infra Private
km. 11.00 to km. 51.00 of Old NH-20 Limited In Joint Venture
with Casta Engineers
Pvt. Ltd.

215 RO-Kolkata Purulia Bypass 18 10.5 2L PS EPC ICT Pvt. Ltd.


216 RO-Shimla 4L of End of Pinjore Bypass - Baddi - 21A 31.17 4L HAM NULL
Nalagarh section (km. 4.200 to km.
35.370) of NH-21A
217 RO-Bengaluru Aurad - Bidar Km 0.00 to Km 45.878 161A 45.878 2L PS EPC Louis Berger Group Inc.

218 RO-Thiruvananthapuram Mattakuzhy to Cochin on NH-85 85 11.5 4L TBD TPF Getinsa


Eurostudioes SL in JV
with TPF Engineering
Pvt Ltd

219 RO-Thiruvananthapuram KL/TN border to Munnar on NH-85 85 42 4L TBD TPF Getinsa


Eurostudioes SL in JV
with TPF Engineering
Pvt Ltd

220 RO-Thiruvananthapuram Ramanattukkara to Kuttipuram on NH- NULL Feedback Infra Pvt Ltd
66

221 RO-Delhi 4/6L of Gurgaon - Pataudi - Rewari 352W 46.11 4L HAM RITES Ltd.
from km. 0.00 to km.43.87 of NH-
352W
222 RO-Chandigarh (HR) Memmadpur - Dairi - Kharar TBD 46.3 4L EPC NULL
223 RO-Kolkata Jangipur/ Omarpur (km 244/600 of 312 52.2 4L HAM RITES Ltd.
NH-34 Jn at Talai) to Sabjikatra

224 RO-Patna Chakia-Bairgania 227 F 50 4L EPC Feedback Infra Pvt. Ltd

225 RO-Chandigarh (PB) Amritsar Bypass (Pkg III) from km. 354 33.66 2L PS EPC Frischmann Prabhu
71.496 to km. 105.158 (India) Pvt Ltd

226 RO-Ranchi Elevated Corridor in Ranchi city from 75 & 3.76 3L EPC M/s CES, Kolkata
Km 0.00 to Km 3.260 of NH-75 23
including down ramp on NH-23 from
Km 0.100 to Km 0.600

227 RO-Patna Balance work WB-10 Pkg on NH-28 122 1 4L EPC Park Projects
Consultancy Pvt. Ltd.

228 RO-Thiruvananthapuram Thuravoor Thekku-Paravoor 66 37.9 4L TBD SMEC International Pty.


Ltd in association with
SMEC (India) Pvt. Ltd

229 RO-Raipur Durg-Raipur-Arang Package - 2 from 53 47.73 4L HAM M/s Transys


km. 44.50 to km. 92.23 (near Khatti
Village to near Aurang)
Balance for Award
Arranged in order of their completion with last completed shown first
Status as on 04 September, 2020
All Lengths in Km.

Sr.
RO Strech NH Length Lane Mode DPR Consultant
No.
230 RO-Guwahati 8 New Flyovers at (i) Boragaon 27 12.09 4L EPC Feedback Infra Pvt. Ltd.
junction (ii) Gorchuk junction (iii)
Lokhra junction. (iv) Basistha junction
(v) Raha junction (vi) Demow junction
(vii) Borghat Charial (viii) Kathiatali
junction & 1 ROB at Jagiroad junction
on NH 27

231 RO-Guwahati Bal. work of 4L from165.250 Km to 27 25.34 4L EPC Almondz Global Infra-
190.587 ofJatinga junction to Consultant Limited in JV
Harangajao section of NH-54(27 new) with Thoughts
(Contract package No. EW-II/AS-21) Consultants Jaipur Pvt.
Ltd.

232 RO-Delhi Development of 6L UER II [Package - 344M 9.66 6L EPC URS Scott Wilson India
III] (Nangloi - Najafgarh Road till Pvt. Ltd. in association
Sector 24 Dwarka) from km. 28.45 to with AECOM India Pvt.
km. 38.111 Ltd.

233 RO-Delhi Development of 6L UER II [Package - 344M 13.45 6L EPC URS Scott Wilson India
II] (Karala Kanjhawala Road till Pvt. Ltd. in association
Nangloi - Najafgarh Road) from km. with AECOM India Pvt.
15.00 to km.28.45 Ltd.

234 RO-Mumbai Six Laning of Satara-Kagal Pkg-III from 48 46.5 6L HAM Louis Berger Group Inc.
km. 678.50 to km. 725.00 of NH-48
(Old NH-4)
235 RO-Thiruvananthapuram 6L Minor Bridge (Paloli Palam) at km. 66 2.1 6L EPC AECOM Asia Pvt. Ltd.
203.160 & Major Bridge (Morad) at
km. 204.895 and allied works

236 RO-Thiruvananthapuram Six Laning of KT/KL Border 66 39 6L HAM AECOM Asia Pvt. Ltd.
(Thalapaddy) -Chengala from Km.
17.200 to Km. 57.20
237 RO-Bengaluru Road connectivity from Kasarkoda 66 4 4L EPC ICT Pvt Ltd
side of Honavar Port to NH-66 at Km
195.5
238 RO-Shimla Balance work of Kiratpur Nerchowk 3 47.75 4L HAM ICT Pvt. Ltd.
(Pkg-2) [Green Field]

239 RO-UP West 2L PS of Palia - Shahjahanpur from 731 89 2L PS TBD M/s Wadia Techno
km. 0.00 to km.89.00 Engineering Services
Limited

240 RO-Chennai Remaining Works of 4 lane bypasses 205 10.57 4L/2L EPC Theme Engineering
Thanner Kulam Thozur Sevapeta and PS Services Pvt. Ltd.
Veppampattu from km 50.900 to km
61.470 of NH-205 as Balance work of
Tirupathi-Tiruttani-Chennai Section in
Tamil Nadu
Balance for Award
Arranged in order of their completion with last completed shown first
Status as on 04 September, 2020
All Lengths in Km.

Sr.
RO Strech NH Length Lane Mode DPR Consultant
No.
241 RO-Delhi Development of 4L UER II [Package - 344 N 7.3 4L EPC URS Scott Wilson India
V] (Spur to Bahadurgarh Bypass) (NH- Pvt. Ltd. in association
10) from km. 0.00 to km.7.30 with AECOM India Pvt.
Ltd.

242 RO-Bhubaneswar Chandipur to Digha (Pkg-III) Km 316A 57.98 2L PS EPC NULL


141.580 to Km 199.560
243 RO-Delhi Development of 6L UER II [Package - 344M 15.7 6L EPC URS Scott Wilson India
I] (NH-1 Near Bakoli till Karala Pvt. Ltd. in association
Kanjhawala Road) from km. 0.70 to with AECOM India Pvt.
km.15.00 Ltd.

244 RO-Delhi Akshardham - DL/UP Border 709B 14.75 6L EPC NULL


245 RO-Patna Ara - Mohania (Pkg-II) 319 60.8 4L EPC M/S MSV International

246 RO-Patna Ara - Mohania (Pkg-I) 319 54.75 4L EPC Park Projects
Consultancy Pvt. Ltd.

247 RO-Jammu Delhi-Amritsar-Katra Expressway 54 28 4L EPC Feedback infra Pvt. Ltd.


(Phase-II Pkg-XIV) from Junction with
Pathankot-Gurdaspur road (NH-54)
near Balsua to Junction with NH-44
near Dabwal (Buddhi) village (Km
424+000 to km 452+000)

248 RO-Jammu Delhi-Amritsar-Katra Expressway 44 23.5 4L EPC feedback Infra Pvt. Ltd
(Phase-II Pkg-XVI) Existing Samba-Jakh
(Vijaypur) section of NH-44 including
construction of Samba Bypass to four-
lane access-controlled Expressway
standards (Design Ch. 477+500 to
501+000)

249 RO-Jammu Delhi-Amritsar-Katra Expressway 144 19 4L EPC Feedback Infra Pvt. Ltd
(Phase-II Pkg-XVII) Existing Domel-
Katra section of NH-144 to four-lane
access-controlled Expressway
standards (Design Ch. 570+000 to
589+000)

250 RO-Bengaluru Tumkur - Nelamangala (6L) 4 45.5 6L TBD M/s. Secon Pvt. Ltd.,

251 RO-Jammu Delhi-Amritsar-Katra Expressway 44 25.5 4L EPC Feedback Infra Pvt. Ltd.
(Phase-II Pkg-XV) Existing Dabwal
(Budhi) - Samba section of NH-44 to
four-lane access-controlled
Expressway standards (Design Ch.
452+000 to 477+500)
Balance for Award
Arranged in order of their completion with last completed shown first
Status as on 04 September, 2020
All Lengths in Km.

Sr.
RO Strech NH Length Lane Mode DPR Consultant
No.
252 RO-Jammu Delhi-Amritsar-Katra Expressway 44 , 19 4L EPC Feedback Infra Pvt. Ltd.
(Phase-II Pkg-XVIII) Existing Jakh 144A
(Vijaypur)-Jammu Airport section of
NH-44 & NH-144A to four-lane access-
controlled NH standards (Design Ch.
0+000 to 19+000)

253 RO-Bhopal Indore - Edlabad (Pkg-II) [Tejajinagar 347B 34 4L HAM Lion Engineering
to Balwara] G Consultant Pvt. Ltd.

254 RO-Mumbai Vadodara Mumbai Expressway (Phase NE 4 14.51 8L HAM ICT Pvt. Ltd.
II - Pkg XVIII) [Km. 79.783 to Km.
94.290 of Spur] (Morbe - JNPT
Section)

255 RO-Mumbai Vadodara Mumbai Expressway (Phase NE 4 27.12 8L HAM ICT Pvt. Ltd.
II - Pkg XIII) [Km. 26.582 to Km.
50.700] (Shirsad - Masvan)

256 RO-Mumbai Vadodara Mumbai Expressway (Phase NE 4 26.3 8L HAM ICT Pvt. Ltd.
II - Pkg XII) [Km. 50.700 to Km.
77.000] (Masvan - Ganjad)

257 RO-Mumbai Vadodara Mumbai Expressway (Phase NE 4 17.2 8L HAM ICT Pvt. Ltd.
II - Pkg XIV) [Km. 3.000 to Km. 20.200
of Spur] (Shirsad - Akloli)

258 RO-Bengaluru 4L of Channarayapatna Bypass and 75 18.8 4L EPC MSV International Inc.
Hassan Bypass with structures in
Devihalli - Hassan section

259 RO-Bhubaneswar Road connectivity from Jamujhadih 316A 61.66 4L EPC NULL
on NH-16 to Dhamra port via
Basudevpur from Km.0.000 to
Km.61.660
260 RO-Bhubaneswar 4L of Banarpal to Ballahar Chhak & 149 / 16 4L EPC M/s Arkitechno
Ballahar Chhak to Godibandha from 53 Consultant Pvt Ltd
km 75.200 to km 84.000 of NH 149 &
Km.314.130 to Km.321.000 of NH-53

261 RO-Bhubaneswar Balance work of Panikoili Rimoli 20 7 4L EPC Not engaged separately
Section of new NH-20 from Km 0.00 for balance work.
to Km. 163.000
262 RO-Chandigarh (PB) Sangatkalan - Harbasnagar 54 14.9 4L EPC Lea Associates India Pvt
ltd
263 RO-Chennai Balance Works of Tirupathi Tiruttani 205 14 4L/2L Item Theme Engineering
Chennai section of NH 205 from km PS Rate Services Pvt. Ltd.
274.800 to km 338.030 in AP and
from km 0.000 to km 50.900 in TN
including Tiruvallur Bypass

264 RO-Patna 4L of Bal. works of Patna - Gaya - 22 39 4L Item M/s ICT Pvt. Ltd.
Dobhi (Pkg-I) from km. 0.00 to km. Rate
39.00 of Old NH-83
Balance for Award
Arranged in order of their completion with last completed shown first
Status as on 04 September, 2020
All Lengths in Km.

Sr.
RO Strech NH Length Lane Mode DPR Consultant
No.
265 RO-Patna Patna Koilwar from km. 0.00 to km. 30 33.25 4L EPC M/s Vax consultant
33.2
266 RO-Bhubaneswar Basudevpur to Chandipur (Pkg-II) Km 316A 50.68 2L PS EPC NULL
91.00 to Km 141.580

267 RO-Chandigarh (PB) Delhi-Amritsar-Katra Expressway 7 ,SH- 36.94 4L EPC M/s Feedback Infra Pvt.
(Phase-I Pkg-VII) from Junction with 11 Ltd.
Patiala-Bathinda road (NH-7) near
Bhawanigarh to Junction with
Ludhiana-Malerhkotla (SH-11) near
Bhogiwal village (Km 188+830 to km
225+770)

268 RO-Chandigarh (PB) Delhi-Amritsar-Katra Expressway 5 , SH- 34.79 4L EPC M/s Feedback Infra Pvt.
(Phase-I Pkg-VIII) from Junction with 11 Ltd.
Ludhiana-Malerkotla (SH-11) near
Bhogiwal village to Junction with
Ludhiana-Moga road (NH-5) near
Mullanpur Dakha (Km 225+770 to km
260+560)

269 RO-Chandigarh (PB) Delhi-Amritsar-Katra Expressway 5 34.11 4L EPC M/s Feedback Infra Pvt.
(Phase-I Pkg-IX) from Junction with Ltd.
Ludhiana-Moga road (NH-5) near
Mullanpur Dakha to Junction with
Phillaur-Nakodar road near Nurmahal
village (Km 260+560 to km 294+670)

270 RO-Chandigarh (PB) Delhi-Amritsar-Katra Expressway 7 ,SH- 30.91 4L EPC M/s Feedback Infra Pvt.
(Phase-I Pkg-VI) from Junction with 10 Ltd.
Patiala-Samana-Patran road (SH-10)
near Ghagga village to Junction with
Patiala-Bathinda road (NH-7) near
Bhawanigarh (Km 157+250 to Km
188+830)

271 RO-UP West Meerut - Najibabad from km. 39.24 to 119 40.25 4L HAM K&J Projects Pvt. Ltd.
km. 86.59 of NH-119 (Pkg-II)

272 RO-Bhubaneswar CG/OD Border - OD/AP Border 130C 235 4L HAM M/s Arkitechno
D Consultants (India) Pvt.
Ltd.
273 RO-Chandigarh (PB) Delhi-Amritsar-Katra Expressway 3 36 4L EPC NULL
(Phase-I Spur-I) from Kang Sahib (
Nakodar ) to start of Beas Bridge near
Goindwal Sahib four-lane access-
controlled Expressway standards
(Design Ch. 0+000 to 36+000)

274 RO-Jaipur Jaisalmer-Myalijar (Pkg. BM-07) 11 98.7 4L/2L HAM LEA Associates South
PS Asia Pvt Ltd
Balance for Award
Arranged in order of their completion with last completed shown first
Status as on 04 September, 2020
All Lengths in Km.

Sr.
RO Strech NH Length Lane Mode DPR Consultant
No.
275 RO-UP West Muzzafarnagar - Miranpur 709A 27.25 4L EPC L.N.Malviya Infra
D Projects Pvt. Ltd. -
PIONEER Infra
Consultants Pvt. Ltd (JV)

276 RO-UP West Bijnor-Kotawali 709A 21.68 2L PS EPC L.N.Malviya Infra


D Projects Pvt. Ltd. -
PIONEER Infra
Consultants Pvt. Ltd (JV)

277 RO-Mumbai Patas-Vasunde Phata - Baramati 965G 56 4L EPC Dhruv Consultancy


Bypass Services Ltd

278 RO-Bengaluru Flyover at Kalladka Town including 75 2.1 6L EPC M/s Voyants Solutions
approaches from Km. 311.57 to Km. Pvt. Ltd., Gurugram
313.67 in Addahole to B.C. Road
section

279 RO-Jaipur Delhi Road to Agra Road of Jaipur TBD 46.46 6L HAM Upham International
Ring Road (North) from km. 101.00 to Corporation Ltd - SA
km. 147.463 Infra structural Pvt Ltd
(JV)

280 RO-Jaipur DNP Area (Delinked stretch of Desert 44 49 2L PS TBD yet to be appointed
National Park)
281 RO-Mumbai 4L of Baramati to Indapur (Pkg-II) 965G 43 4L EPC SATRA Infrastructures
from km. 41.400 to km. 84.550 of NH- Management Services
965G (Saint Tukaram Marg) Pvt. Ltd

282 RO-Mumbai 4L of Indapur to Tondle (Pkg-III) from 965G 47 4L EPC SATRA Infrastructures
km.84.550 to km. 131.00 of NH-965G Management Services
(Saint Tukaram Marg) Pvt. Ltd

283 RO-Delhi DL/UP Border - EPE Crossing 709B 16.45 6L EPC NULL
284 RO-Nagpur Govindhpur (MS - Telangana Border)- 353B 56 4L EPC M/s. Mukesh &
Rajura Associates
285 RO-Patna Umagaon-Saharsa 527A 141.04 4L EPC NULL
286 RO-Hyderabad Hyderabad - Maneguda 163 46.39 4L TBD M/s. Feedback Infra
Pvt.Ltd
287 RO-Patna Umagaon-Saharsa (Package-III) 527A 26.04 2L TBD VKS Infratech
Bideshwar Asthan (NH-27, E-W) to Management Pvt. Ltd.
Bheja
288 RO-Patna Umagaon-Saharsa (Package-V) Bakaur- 327E 39.08 2L TBD VKS Infratech
Parsarma-Bangaon-Bariyahi & Spur to Management Pvt. Ltd.
Mahishi
289 RO-Patna 4L from km. 34.600 to km. 79.970 & 131A 49 4L HAM Aarvee Associates
2LPS from km. 79.970 to km. 82.000
of Narenpur - Purnea Section of NH-
131A
290 RO-Madurai Rajapalyam - Shenkottai (Lot-3) / 744 62 4L HAM Feedback Infra Pvt. Ltd
Tamil Nadu / (Pkg-2)
291 RO-Bhopal Badnawar - Amarholi SH18 42.09 4L HAM NULL
Balance for Award
Arranged in order of their completion with last completed shown first
Status as on 04 September, 2020
All Lengths in Km.

Sr.
RO Strech NH Length Lane Mode DPR Consultant
No.
292 RO-Madurai Additional Structures in KL/TN Border - 47 9.74 4L EPC VKS Infratech
Kanyakumari from km 43.0 to km Management Pvt. Ltd.
96.714
293 RO-Madurai 6-laning of Trichy - Thanjavur section 83 56 6L EPC Feedback Infra Pvt. Ltd
of NH-67
294 RO-Madurai Thanjavur - Kaikurichi (near 36 51.8 4L EPC Aarvee Associates
Pudukottai) Architects Engineers &
Consultants Pvt. Ltd.

295 RO-Madurai Pilayarpatti - Kaikurichi (near 36 32.51 4L EPC Aarvee Associates


Pudukkottai) Architects Engineers &
Consultants Pvt. Ltd.

296 RO-Ranchi 4L from Km 55.00 (Kuru) to Km 75 41 4L HAM L.N. Malviya Infra


95.400 (Udaipura) on NH-75 (Sec-I) Projects Pvt. Ltd.,
Bhopal
297 RO-Chennai Puducherry (Km.29.000) to 332 38 4L HAM Feedback Infra Pvt. Ltd
Poondiyankuppam (Km.67.000)

298 RO-Chennai Viluppuram (Km.0.000) to Puducherry 332 29 4L HAM Feedback Infra Pvt. Ltd
(Km.29.000)
299 RO-Chennai Meensurutti (Km.98.433) to 227 31.53 4L HAM Aarvee Associates
Chidambaram (Km.129.965) of NH- Architects Engineers &
227 Consultants Pvt. Ltd.

300 RO-UP West 4L of Moradabad-Jaspur section from 734 54.5 4L TBD NULL
km 0.00 to km 54.50 of NH-734

301 RO-Chennai Poondiyankuppam (Km.67.000) to 332 56.8 4L HAM Feedback Infra Pvt. Ltd
Sattanathapuram (Km.123.800)

302 RO-Hyderabad Four laning of NH-363 from 363 52.6 4L HAM Aarvee Associates
Repallewada from Km.288.510 to Architects Engineers &
TL/MH Border Km.288.510 Consultants Pvt. Ltd.

303 RO-Jaipur Jodhpur Ring Road Section-II (Nagaur - 26 6L TBD Feedback Infra Pvt. Ltd
Dangiyawas)
304 RO-Chandigarh (HR) Jagadhari - HR/HP Border (Ponta 344 34 4L TBD M/s Rites Ltd.
Sahib)
305 RO-Nagpur Nagpur-Wainganga - Bhandara- 6 45 6L HAM K&J Projects Pvt. Ltd.
Nagpur
306 RO-Bhubaneswar Cuttack - Kandarpur 55 14.1 4L TBD NULL
307 RO-Kolkata Palsit-Panagarh 19 67.75 6L BOT Toll Chaitanya Project
Consultancy Pvt. Ltd.