MBS 2nd Production and Operation MGMT
MBS 2nd Production and Operation MGMT
MBS 2nd Production and Operation MGMT
FACULTY OF MANAGEMENT
Office of the Dean Full Marks : 100
December 2019 Pass Marks : 50
MODEL QUESTIONS Time : 4 Hours
MBS / Second Semester / MSC 516 : Production and Operations Management
Candidates are required to answer all the questions in their own words as far as
practicable. Figures in the brackets indicate full marks.
Group “ A “
Extended Problem Analysis Questions
Attempt all Questions : [1
×30=30 ¿
1( a ) Read the following case analytically and answer the following questions. (15)
ABC Ltd. is the country’s largest manufacturer of spun yarn with well-established
market. ABC Ltd. has good reputation for quality and service. Their marketing
department identified that the potential for global market is expanding rapidly and
hence the company undertook exercise for expansion of the capacity for export
market. The company formed team of Marketing and Materials department to study
the global logistics possibilities. After extensive study, the team came up with a report
on global logistics and submitted that global logistics is essentially same as domestic
due to following similarities:
• The conceptual logistics framework of linking supply sources, plants, warehouses and
customers is the same.
• Both systems involve managing the movement and storage of products.
• Information is critical to effective provision of customer service, management of
inventory, vendor product and cost control.
• The functional processes of inventory management, warehousing, order processing,
carrier selection, procurement, and vendor payment are required for both.
• Economic and safety regulations exist for transportation.
The company had very economical and reliable transportation system in existence. For
exports as well they decided to evaluate capabilities of their existing transporter and
entrusted them with the job of transport till port. For customs formalities they engaged a
good jobs after proper cost evaluation and entered into contract for freight with shipping
company agent. The response for company’s export was very good and the company
could get as many as 15 customers within first two months and reached to a level of Rs
250 million per month by the end of first half of the year. Based on this response the
export volumes were expected to grow to a level of Rs 400 million per month by the end
of the year. When the review was made at the end of the year, company found that export
volumes had in fact come down to the level of Rs 120 million which was much lower
than it had reached in the first half of the year. The managing committee had an
emergency meeting to discuss this and the export manager was entrusted with the task of
identifying the reasons for this decline. Mr. Laxman Kumar, Chairman of ABC Ltd.
decided to visit the customers for getting the first hand information. When he discussed
the matter with the customers, the feedback on the quality and price were good but the
customers were very upset on the logistic services due to delayed shipments, frequent
changes in shipping schedules, improper documentation, improper identifications,
package sizes, losses due to transit damages etc. After coming back, the export manager
checked the dispatch schedules and found that production and ex-works schedules were
all proper. Then he studied the logistics systems and found that the logistics cost was very
high and all the logistics people were de motivated due to overwork and were
complaining of total lack of co-ordination and the system had become totally
disorganized.
Questions :
1. Analyze the case from the perspective of operations system.
2. Explain the problems experienced by ABC Ltd. What is the main cause of these
problems?
3. What logistics model should the company go for to ensure proper operations of the co
Group “B”
Problem Solving / Critical Analysis Questions
Attempt Any THREE Questions : [ 3 ×15=45 ¿
2. Explain about the location decision for a new product or service. Discuss the factors
affecting location decision. Also mention the strategic importance of location.
3. From the following information determine the optimum transportation schedule in
order to minimize transportation costs.
Plant (Unit transportation cost in Rs.) Supply
Markets (units )
A B C
P 5 2 8 150
Q 4 3 5 150
R 2 4 - 200
S 6 3 4 250
Demand (units) 250 200 175
There is no transportation facility between plant R and Market C.
4.(a) Explain about production system of an organization. Discuss any two types of
production systems.
4. (b) From the following information find the optimal assignment so that the profit is
maximized on the basis of one machine to one job.
Machines Profit in Rs.
Jobs
A B C D
X 1800 2400 2800 3200
Y 800 1300 1700 1900
Z 1000 1500 1900 2200
5. (a ) What is material requirement planning (MRP )? Discuss its merits and demerits
.
5. (b) The following table gives the inspection data relating to 10 samples of 100 items
each, concerning the production of bottle corks.
Sample Number 1 2 3 4 5 6 7 8 9 10
Number of defectives 5 3 3 6 5 6 8 10 1 4
0
On the basis of infofmations given above :
(i) Find the central line and control limits. Also prepare the control chart for
fraction defective.
(ii) Comment on the state of control of the process.
Group “C”
Concept Based Short Answer Questions
Attempt any FIVE Questions. [5
×5=25 ¿
6. What is plant layout? Why is layout planning important?
7. What do you mean by Total Quality Management ( TQM )? Describe briefly any two
principles of TQM.
10. A company requires 1000 units per month. Ordering cost is estimated to be Rs.50 per
order. The carrying cost is Rs.2 per unit per year. The purchase price is Rs. 10 per
unit. Find (i) the economic lot size to be ordered (ii) the total annual cost.
11. A small manufacturing facility is supposed to get established in order to supply parts
to three heavy manufacturing facilities. The existing plant locations with their
coordinates and volume requirements are given in the following table.
Plant Location Coordinates (x, y) Volume (Parts per
year)
A ( 250 , 270 ) 3500
B ( 325 , 420 ) 5500
C ( 420 , 130 ) 3000
Use centre of gravity method to determine the best location for the new
facility.
THE END