Risk Assessment Methodology: Provision of Sinage/ Implementing No Source of Ignition Within 16 Meters
Risk Assessment Methodology: Provision of Sinage/ Implementing No Source of Ignition Within 16 Meters
Risk Assessment Methodology: Provision of Sinage/ Implementing No Source of Ignition Within 16 Meters
Scope of Work Process Hazard (Potential to cause of injury) Hazardous Event/Accident that may happen Tools/Equipment Severity caused by event/Exposure Engineering Control Admin Control PPE Control Duration
Person might fall while working and falling debris/ Tools may create Face Shield/Goggles/gloves/ fire extinguisher/Facemask/Safety
RESTROOM RENOVATION 2. Masonry, Tiling works painting, ceiling works Physical Hazard/ Fire Hazard
spark or smoke when overheat
Mallet, riviter, paint roller, electric drill, scripper grinder Explosion of tools/Severe eye and hand injury Safety orientation/Toolbox meeting Everyday before work
harness/Hard hat/Safety Shoes
24 days
4. Installation of Trusses/ Welding works/ drilling Physical Hazard Fire/Explosion Hazard Electrical ground or shock to the body/ falling to ground/ Breaking of Welding machine, grinder, electric drill, wrenches, hammer, Severe body injury/ Fracture/Fatality Safety orientation/Toolbox meeting Face Shield/Goggles/gloves/ fire extinguisher/Facemask/Safety
and grinding works drill bit cause by too much pressure given harness/Hard hat/Safety Shoes
Spark may generate when two metals bump to each other with force (ex. Boarding up the work area to avoid build-up Provision of Sinage/ Implementing no source of ignition Face Shield/Goggles/gloves/ fire extinguisher/Facemask/Safety
CONCRETE POURING OF TIE BEAMS 1. Concrete pouring Physical Hazard/ Fire/Explosion Hazard Hammer and steel pipes) Conc. Mixer and pumpcrete, steel pipe, body injury/Fatality/Property Damage static/spark that can cause fire/ hammer head within 16 Meters harness/Hard hat/Safety Shoes 1 day
cover by rubber
Boarding up the work area to avoid build-up Face Shield/Goggles/gloves/ fire extinguisher/Facemask/Safety
1. Excavation/Hauling Physical Hazard Falling of boulders and debris Backhoe Severe body injurybody injury/Fatality static/spark that can cause fire Provision of sinage/ NC2 Certified to operate harness/Hard hat/Safety Shoes
Boarding up the work area to avoid build-up Provision of Sinage/ Implementing no source of ignition Face Shield/Goggles/gloves/ fire extinguisher/Facemask/Safety
RIPRAP WORKS 2. Riprapping Physical Hazard Falling of boulders and debris Mini Backhoe Severe body injury/Fatality static/spark that can cause fire within 16 Meters harness/Hard hat/Safety Shoes 60 days
Boarding up the work area to avoid build-up Face Shield/Goggles/gloves/ fire extinguisher/Facemask/Safety
3. Back filling Physical Hazard Falling of boulders and debris Backhoe Severe body injury/Fatality static/spark that can cause fire Provision of sinage/ NC2 Certified to operate harness/Hard hat/Safety Shoes