Energy Recovery Unit - Tender Specifications

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

DIVISION 15 Revision 00

15780

ENERGY RECOVERY EQUIPMENT

PART 1 GENERAL

1.1 DESCRIPTION OF WORK

A. This Section includes all air handling equipment and fans.

1.2 QUALITY ASSURANCE

A. Requirements of Regulatory Agencies:


1. All fans shall be tested and rated in accordance with AMCA Standard 210.
Fans shall bear the AMCA label.
1.3 REFERENCES

A. AMCA 511 Certified Ratings Program for Air Control Devices.


B. Canadian Electrical Code C22.2 NO. 113-15 - Fans and Ventilators.
C. USGBC: U.S. Green Building Council LEED® Rating System.
D. - Standard for Ducted Heat Recovery Ventilators.
E. - Heating and Cooling Equipment.

1.4 SUBMITTALS

A. Shop Drawings and Product Data:


1. Air handling units, Fan Coil Units and fans.
a. Submit complete fan performance curves marked to indicate selection
points for proposed fans. Data submitted shall also include sound
power levels in all octave bands.

PART 2 PRODUCTS

FRESH AIR SYSTEM

Under the scope, the Contractor shall install required number of FAHU, double skin, horizontal air
handling unit capable of providing fresh air of desired CFM and condition as indicated in the schedule
of equipment.

The FAHU shall consists of intake chamber with Volume Control sand trap louver, damper panel type
pre-filter and bag type final filters, cooling coil, evaporator fan and all housed in a heavy gauge
galvanized and painted sheet steel double skin casing.

The insulation shall not be less than 25mm in thickness.

DIV: 15 MECHANICAL SEC: 15780


REV: 00 1 of 4
The unit shall be provided with a drain pan, bolted access doors shall be provided for fan, coil and filter
maintenance. The evaporator fans shall be belt driven; forward curved, centrifugal type equipped with
adjustable motor pulleys and shall be suitable for the 3 phase system voltage.
The evaporator fans performance rating shall be according to BS 848. The fans motors shall be rated to
e built-in thermals
overload protection. The fans and their motors shall be provided with permanently lubricated bearings.

Each of the fan and motor assemblies shall be isolated from the casing by suitable anti-vibration
mountings.

The FAHU shall be installed in the roof as shown in the drawings. The units shall be supported on
specially designed anti-vibration spring isolators. The supply shall be ducted and shall be provided with
sound attenuator and acoustic liner to required length such that the noise level does not exceed NR 30
index at the discharge end of any of the grill/diffuser.

A fresh air intake shall be provided with a 0-100% manual opposed blade control damper with insect
screen and sand trap louver.

The throw away flat panel filters shall be side withdrawal type and shall have minimum efficiency of
92% on BS 2831 test dust No: 2. The Bag Filters shall have minimum efficiency of 99% on BS 2831 test
dust No: 2. the initial pressure drop across the filters shall not exceed w inch WG.

The fan static pressure shall be calculated by the supplier taking into account the resistance of supply and
return ducts, drops, across filters, attenuates, diffusers, fresh air grilles etc.,

All necessary electrical devices such as contractors, breakers, fuses, LV control transformers, etc., shall
be provided. The electrical components and wiring of the unit shall comply with the relevant IEC or BS
standards. All wiring shall be clearly identified. The unit control panel shall be designed to IP 44
protection class.

The AHU shall be provided with supply duct mounted temperature sensor and fan speed regulator. Each
regulator shall have facility for unit ON/OFF Auto condition and cycle control Auto/Manual/Fan with
set point control/Voltage free contacts from the fire alarm panel shall be wired, such that in case of fire
detection in apartments the FAHU's are tripped.

2.1 MATERIALS

A. Air Handling Units.

1. The units shall be provided as required for individual areas.


a. Units shall be complete with fans, motor, belt drive, belt guards,
filters, coils, and dampers.
b. Casings:
Air handling units shall be housed in a double skin casing constructed
of galvanised steel sheets (internal and external) not less than 1 mm in
thickness. The casing shall be painted or plasticised externally by the
AHU manufacturer at the factory prior to despatch. The cabinet shall

DIV: 15 MECHANICAL SEC: 15780


REV: 00 2 of 4
be adequately reinforced and stiffened with steel angles or other
structural members, and shall be provided with all necessary interior
panels, supports for equipment, access openings, and dampers. Casing
openings connected to ducts shall be equipped with removable angles
and bolts for attaching canvas or other flexible connections. All
interior surfaces of the casing shall be rendered rust resistant.
Removable panels in the casing shall provide easy access to all parts
for lubrication and servicing when unit is installed. The cabinet panels
shall be 50 mm thick with expanded foam, mineral wool or fibreglass
insulation sandwiched between the inner and outer skins. Fan casing
sections shall be provided with access doors. Access doors shall be
double skin, insulated, 50 mm thick with Plexiglass windows. Fan
sections on units with internally mounted motors shall be furnished
with a ceiling mounted vapour proof light fixture wired to an external
switch.
c. Each fan unit shall have an air capacity to be determined by the
Contractor in compliance with the design criteria and the safety factors

shall be determined by the Contractor to suit the air distribution system


a approval.
Fan units shall be installed complete with electric motor and drive
equipment. Fans shall be rated and constructed in accordance with
AMCA standard codes. Fans shall be statically and dynamically
balanced at all speeds. Fans shall have externally mounted, self-
aligning. grease- lubricated ball bearings. Fan bearings to have
200,000 hour minimum life per AFBMA-9. Fan shafts shall be made
of steel, and shall be provided with key seats and keys for the impeller
hubs and fan pulleys or with other equally positive fastening. V-belt
drives shall be designed for at least 50 percent overload capacity and
shall be designed to allow adjustment of fan speed. Fan motors shall
be equipped with adjustable base or rails for belt tightening. Motor and
fan mountings shall be on a resilient base constructed of steel shapes
and connected through spring or rubber-in-shear isolators. Contractor
shall submit complete fan performance curves marked to indicate
selection points for proposed fans. Data submitted shall include sound
power levels in all octave bands. The fan discharge shall connect to the
casing through a flexible duct connector.
d. Motors shall be TEFC type and as per Division 16 Electrical. The
motors shall be rated at least 15% higher than the maximum power
drawn at any of the operating speeds or conditions. Starter will be
provided under Division 16, ELECTRICAL. Wiring to the motor lugs
is specified under Division 16, ELECTRICAL. Provide motors with
ball bearings rated for 200,000 hour minimum life per AFBMA-9.
Motors shall be suitable for variable speed operation where required
and auxilliary star-delta staring above 4 kW.
e. Each unit shall be provided with necessary piping, valves, and
accessories as indicated on Drawings and as specified.
f. Mixing boxes with dampers shall be provided where required.

DIV: 15 MECHANICAL SEC: 15780


REV: 00 3 of 4
ITEM BRAND/MANUFACTURERS MODEL PLACE OF ORIGIN
CARRIER KSA
TRANE MALAYSIA
FAHU S YORK TURKEY
DAIKIN UAE
TROSTEN UAE

PART 3 EXECUTION

3.1 INSTALLATION/APPLICATION/PERFORMANCE/ERECTION

Install fans and accessories in accordance with manufacturer's instructions.

DIV: 15 MECHANICAL SEC: 15780


REV: 00 4 of 4