Schedule - D: (See Clause 2.1)
Schedule - D: (See Clause 2.1)
Schedule – D
(See Clause 2.1)
1. Construction
The Contractor shall comply with the Specifications and Standards set forth in
Annex-I of this Schedule-D for construction of the Project Highway:
2. Design Standards
The Project Highway including Project Facilities shall conform to design requirements
set out in the following documents:
Manual of Specifications and Standards for Four Laning of Highways
published by the Indian Roads Congress – IRC- 84-2014. Paved Shoulder
as per IRC SP-73-2015, Manual for grade separators and elevated structures IRC
SP-90-2010.
Specifications for Road and Bridge works (Fifth Revision) published by
Ministry of Road Transport and Highways Where the specification for a work
is not given, Good industry practice shall be adapted to the satisfaction of the
Engineer.
Page D - 1
Construction of Elevated Corridor in Deesa on NH-27 (Km 565+850 to Km 569+600)
Dist: Banaskantha, Gujarat.
Annex – I
(Schedule-D)
Page D - 2