1157 Pax 32 Nos 36 Nos 259 Pax 774 Pax Calculations: Step 1
1157 Pax 32 Nos 36 Nos 259 Pax 774 Pax Calculations: Step 1
CALCULATIONS
Parameters Abb. ValueUnit
No of processing desk open CD 60
Process time for service at desk PTcd 135 seconds
No of baggage drop position open BD 20 nos
Process time at baggage drop PTbd 130 seconds
Originating peak hour passenger PhP 2450 nos
Peak 30 min factor PK 65%
Ratio of passenger using baggage drop facilities BR 15% seconds
Ratio of passenger using traditional check in facilities CR 80% seconds
Approxmate no of departure passport control desk Pdi 12
Process time per passenger at departure passport control PTpd 60 seconds
Maximum queing time for first MQT 7
Area required for departure passport control facitilies A 1380 sq.m
Depth of one departure control desk PDd 3m
Width of one departure control desk PDw 2.2 m
Maximum no of passenger waiting in queue Qmax 10
Space per person SP 1 m2
Corridor width behind desk W 3.5 m
Correction factor for demand variability Cf 1.11
Correction factor for Qmax Qf 0.22