Pert CPM
Pert CPM
Pert CPM
PERT/CPM
JQY
PERT
• PERT stands for Program (or Project) Evaluation Review
Technique
• It was developed in the late 1950s by the US Navy for the Polaris
missile project.
• It is developed to handle uncertain activity times.
CPM
• CPM stands for Critical Path Method
• Developed originally by DuPont and Remington Rand.
• It is developed for industrial projects for which activity times are
known for certain and where variability is not a concern.
0 6 6 6 3 9
C: Overhaul Machine 2 D: Adjust Machine 2
1 1 7 7 1 10
• Further assume that the activity time estimates (in days) for the
swimming pool construction project are as follows:
Activity Optimistic Most Probable Pessimistic
A 3 5 6
B 2 4 6
C 5 6 7
D 7 9 10
E 2 4 6
F 1 2 3
G 5 8 10
H 6 8 10
I 3 4 5
Additional Problem 3
• Requirements:
1. Develop the project network.
2. What are the critical activities?
3. What is the expected time to complete the project?
4. Based only on the critical path, what is the estimated probability
that the project can be completed in 25 or fewer days?
Solutions Page for Additional Problem 3
Solutions Page for Additional Problem 3
Solutions Page for Additional Problem 3
Solutions Page for Additional Problem 3