Scottoiler: Kawasaki ZZR 600: Scottoiler Esystem (The Electronic Scottoiler) Installation Guide

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

English-Kawasaki-ZZR 600-17th Octoder 2014 KAW-029

Scottoiler: Kawasaki ZZR 600


Scottoiler eSystem (the electronic Scottoiler) Installation Guide

The delivery tubing can be routed along the swingarm


using conduit and glue or self adhesive cable clips
and the dispenser can be secured on the rear spindle
using a Dispenser plate & Clip. For further information
see our easy step installation guide - Dispenser
Assemblies, General. The nib should feed the rear
sprocket between the 6 & 7 o’clock positions, with the
cut face outwards.
Connect the delivery tubing to the check valve but do
not connect the check valve, part 6, to the REP, part
7, until you are priming the system.
See picture below left

The REP can be mounted under the seat, or behind


the number plate. The REP can be orientated
anywhere between horizontal and vertical, as long as
the nozzle is inclined upwards. Remember to avoid
exhaust and engine components and to keep the filling
hole accessible. For further information, see our easy
step installation guide – Reservoir Positions, General.

Note: Picture shows a similar Swingarm

The Display Bracket, part 5, can be rotated through


360° to give 4 mounting options and can also be
flipped to provide 4 further options. The bracket can
be secured to any M5 / M6 bolt e.g. brake or clutch
lever, brake cylinder or fairing mountings, in some
cases you might need to trim the supplied bolt. It is
possible to bend the bracket to shape, do so before
fitting the Display Unit, part 1, to prevent damage to
the unit. Alternatively, the Sticky Fastener, part 4, can
be used to securely fasten the Display Unit to any flat
surface e.g. the fork yokes.
See third picture
Note: This is a generic image

Locate the bikes' battery and attach the red terminal


from the display unit to the +ve terminal on the battery,
and attach the black terminal to the -ve terminal of the
battery. Take care when routing the wires, avoiding
hot engine and exhaust components and also
avoiding moving parts such as the throttle linkages.
Where possible follow existing wiring and secure
using cable ties.

Once fitted, fill the REP and prime the pump. Attach
the delivery tubing and prime until the oil reaches the
Note: This is a generic image rear sprocket and then install the check valve. Do not
install the check valve until the delivery tubing
is full.

For further information, see the website eSystem


page which includes the Setup and Installation Guide.
Set the flow rate, using the 'Driving Screen' on the
Display Unit, to 60-70 seconds per drop (s/dp), check
the condition of your chain after a ride, and adjust as
required.
See picture bottom left
If you have any further comments or queries, and are unable to resolve them using our website, please do not hesitate to call
technical on 0141 955 1100 or email [email protected] for assistance. Thank you.
Scottoiler Ltd. 2 Riverside, Milngavie, Glasgow, G62 6PL Tel. 0141 955 1100 Fax. 0141 956 5896 www.scottoiler.com

You might also like