Calcule BPP - Contis Razvan

Download as pdf or txt
Download as pdf or txt
You are on page 1of 15

1.

Determinarea cotelor de nivel necesare pentru amplasarea pasajului (teren,DN,CF)

N=3

Km 94 + (900 + N x 50) = km 94 + (900 + 150) = km 95 + 050

Km pasaj :95 + 050 (CF)

Cote de nivel DJ 1

-cota teren: 487,84

1/25.73=x/21.76 => x = 21.76/25.73 = 0.84

487.00+0.84 = 487.84

-NSC (nivelul superior al caii):492.35

3/1300 = x/1019.53  1300x = 3058.59

x = 3058.59/1300 = 2.35

490.00 + 2.35 = 492.35

Cote de nivel DN

-cota teren : 470.62

2/32.16 = x/10.11

32.16x = 20.22

x = 20.22/32.16 = 0.62

470.00 + 0.62 = 470.62

-NSC(nivelul superior al caii : 475.35


4/1200 = x/1004.65  1200x = 4018.6 => x = 4018.6/1200 = 3.35

472.00 + 3.35 = 475.35

Cote de nivel (CF)

-cota teren : 470.78

1/32.16 = x/25.12

32.16x = 25.12

x = 25.12/32.16 = 0.78

470.00 + 0.78 = 470.78

-NSS ( nivel superior sina) : 473.375

3/1200 = x/950  1200x = 2850 => x = 2850/1200 = 2.375

471.00 + 2.375 = 473.375

Cota de nivel DJ 2

-cota teren : 483.95

1/21.65 = x/20.65  21.65x = 20.65 => x = 20.65/21.65 = 0.95

483.00 + 0.95 = 483.95

NSC : (nivelul superior al caii) : 483.44

4/1200 = x 1033.18  1200x = 4132.72 => x = 4132.72/1200 = 3.44

480.00 + 3.44 = 483.44


2. Determinarea inaltimii de constructie hc si a nivelului superior al caii pe

pod Hgr = 0.51 + (3 x 0.01) = 0.54 m

hc = Hgr + hps + hbp + hh + hsp + hac

hc = 0.54 + 0.10 + 0.10 + 0.01 + 0.04 + 2 x 0.035 = 0.86

Alcatuirea suprastructurii podului :

Deschiderea de calcul a unei grinzi L in m:

L=12.50 m + 3 x 0.20 m = 13.10 m

Lt = L + 2 x 0.25 m = 13.1 m + 2 x 0.25 m = 13.60 m

Hgp = 0.51 + 3 x 0.01 m = 0.54 m


3. Evaluarea actiunilor pentru suprastructura
3.1 Actiuni permanente
3.1.1 Generalitati
L = deschidere de calcul
L = 13.10m
Agrinda = arie grinda [m2 ]
Agrinda = 0.188 m2 (din acad)
Apb = arie placa de beton [m2 ]
Apb = 1.87 m2 (din acad)
ngrinzi = 9 buc

3.1.2 Greutatea proprie a grinzii


Vgrinda = volum grinda [m3 ]
Vgrinda = Agrinda x L = 0.188 m2 x 13.10 m = 2.46 m3
Ggrinda = greutate grinda [KN]
Ggrinda = Vgrinda x ‫ﻻ‬ba = 2.46 m3 x 25 KN/m3 = 61.5 KN
ggrinda = greutate grinda / m
ggrinda = Ggrinda / L = 61.5 KN / 13.10 m = 4.69 KN/m

Momente incovoietoare si forte taietoare din greutate proprie grinda

L (m) ggrinda R1 R2
13.1 4.69 30.72 30.72

Sectiune 0 1 2 3 4 5 6 7 8 9 10
0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1
x 0 1.31 2.62 3.93 5.24 6.55 7.86 9.17 10.48 11.79 13.1
M(x) 0.00 36.22 64.39 84.51 96.58 100.61 96.58 84.51 64.39 36.22 0.00
V(x) 30.72 24.58 18.43 12.29 6.14 0.00 -6.14 -12.29 -18.43 -24.58 -30.72
3.1.3 Greutatea placii de suprabetonare
gpb = greutatea placii de beton / m
gpb = Apb x ‫ﻻ‬ba = 1.87 m2 / 9 grinzi x 25 KN/m3 = 5.21KN/m
‫ﻻ‬ba = greutate specifica beton armat [KN/m3] = 25 KN/m3

Momente incovoietoare si forte taietoare din placa de suprabetonare

L (m) gpb R1 R2
13.1 5.21 68.32 68.32

Secti-
0 1 2 3 4 5 6 7 8 9 10
une
0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1
x 0 1.31 2.62 3.93 5.24 6.55 7.86 9.17 10.48 11.79 13.1
M(x) 0.00 40.23 71.53 93.88 107.29 111.76 107.29 93.88 71.53 40.23 0.00
V(x) 34.13 27.30 20.48 13.65 6.83 0.00 -6.83 -13.65 -20.48 -27.30 -34.13

3.1.4 Greutatea elementelor caii (parapeti, umpluturi, sistem rutier)


gCTP = (gpp + gpd + gbord + ggr_pp + ggr_pd + gump + gSR) / ngrinzi = 50.68 KN/m / 9 grinzi =
5.63 KN/m
gCTP = greutate cale-trotuar-parapet /m
gpp = greuate parapet pietonal /m
gpp = 0.5 KN/m
gpd = greutate parapet directional /m
gpd= 1 KN/m
gbord = greutate bordura /m
gbord = Abord x ‫ﻻ‬ba = 0.035 m2 x 25 KN/m3 = 0.87 KN/m
Abord = arie bordura [m2]
ggr_pp = greutate grinda parapet pietonal / m
ggr_pp = Agr_pp x ‫ﻻ‬ba = 0.12 m2 x 25 KN/m3 = 3 KN/m
ggr_pd = greutate grinda parapet directional / m
ggr_pd = Agr_pd x ‫ﻻ‬ba = 0.123 m2 x 25 KN/m3 = 3.07 KN/m
gump = greutate umplutura trotuar / m
gump = Aump x ‫ﻻ‬bs = 0.29 m2 x 24 KN/m3 = 6.96 KN/m
Aump = arie beton de umplutura la trotuar [m 2]
‫ﻻ‬bs = greutate specifica beton simplu [KN/m 3] = 24 KN/m3
gSR = greutate sistem rutier /m
gSR = Abeton panta x ‫ﻻ‬bs + Ahidroizolatie x ‫ﻻ‬mb + Asapa prot x ‫ﻻ‬ba + Aasfalt x ‫ﻻ‬ac
gSR = 0.52 m2 x 24 KN/m3 + 0.11 m2 x 22 KN/m3 + 0.34 m2 x 25 KN/m3 + 0.54 m2 x 22
KN/m3 = 35.28 KN/m
gCTP = 0.5 + 1 + 0.87 + 3 + 3.07 + 6.96 + 35.28 = 50.68 KN/m

Momente incovoietoare si forte taietoare din cale,trotuar,parapet

L (m) gCTP R1 R2
13.1 5.63 36.88 36.88

Sectiune 0 1 2 3 4 5 6 7 8 9 10
0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1
x 0 1.31 2.62 3.93 5.24 6.55 7.86 9.17 10.48 11.79 13.1
M(x) 0.00 43.48 77.29 101.45 115.94 120.77 115.94 101.45 77.29 43.48 0.00
V(x) 36.88 29.50 22.13 14.75 7.38 0.00 -7.38 -14.75 -22.13 -29.50 -36.88
PRODUCED BY AN AUTODESK STUDENT VERSION

Diagrame de eforturi din greutate proprie grinda


ggrinda=4.69 KN/m

0 1 2 3 4 5 6 7 8 9 10

R1 = 30.72 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 R2 = 30.72

13.10

30.72 +
V
-
30.72

M
+

PRODUCED BY AN AUTODESK STUDENT VERSION


PRODUCED BY AN AUTODESK STUDENT VERSION

Mmax=100.61

Diagrame de eforturi din placa de suprabetonare


gpb=10.43 KN/m

0 1 2 3 4 5 6 7 8 9 10

R1 = 68.32 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 R2 = 68.32

13.10

68.32 +
V
-
68.32

M
+

Mmax=111.76

Diagrame de eforturi din cale, trotuar, parapet


gCTP=5.63 KN/m

0 1 2 3 4 5 6 7 8 9 10

R1 = 36.88 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 R2 = 36.88

13.10

36.88 +
V
-
36.88

M
+

Mmax=120.77

PRODUCED BY AN AUTODESK STUDENT VERSION


4. Determinarea cotelor de nivel pentru elementele componente ale pilei:

NIS in pct Q = 481.875

Distanta de la pct Q la axul de rezemare = 10.50 m

i=1%

10.50 x 0.01 = 0.105

NISp = 481.875 + 0.105 = 481.98

1) Cota superioara a banchetei cuzinetilor – NSBC

HAP FIX = 40 mm = 0.04 m

NSBC = NISp – HAP FIX = 481.98 – 0.04 = 481.94

Inaltimea banchetei cuzinetilor HBC = 1.20 m (se alege constructiv)

2) Cota inferioara a banchetei cuzinetilor NIBC = NSBC – HBC = 481.94 – 1.20 = 480.74

3) Determinarea nivelului rostului elevatie – fundatie

NTNp = nivelul terenului natural din dreptul pilei

NTNp = 470.70

REF = rost elevatie – fundatie (de calcul)

REF = NTNp – 0.50 = 470.70 – 0.50 = 470.20

4) Inaltimea elevatiei HE

HE= NIBC – REF = 480.74 – 470.20 = 10.54 m => HE = 10.55 m

5) Rost elevatie – fundatie real (REF) REFreal = NIBC – HE = 480.74 – 10.55 = 470.19

6) Determinarea nivelului talpii fundatiei

REF = 470.19

Strat de argila prafoasa

2.75 + 0.05 x 3 = 2.90 m

TF = talpa fundatiei

TF calcul = min {NTNp – hi = 470.70 – 0.90 = 469.80

NTNp – [0.75 + 2.90 + 0.5] = 470.70 – 0.75 – 2.90 – 0.5 = 466.55


TF calcul = 466.55

7) Inaltimea fundatiei (HF)

HF = REFfinal – TF calcul = 470.19 – 466.55 = 3.64 => HF = 3.65 m

Deoarece talpa fundatiei se incastreaza mai putin de 50 cm in stratul de pietris cu bolovanis alegem
inaltimea fundatiei HF = 3.90 m

Talpa fundatie final:

TFfinal = REFfinal – HF = 470.185 – 3.90 = 466.29

8) Latimea talpii fundatiei (BF)

HF = 3.90 m

De la marginea elevatiei se vor trasa planuri cu unghiuri de 60 gradefata de orizontala pana la intersectia
cu nivelul talpii fundatiei. Latimea talpii este compusa din latimea elevatiei la care se adauga proiectiile
pe orizontala ale celor 2 planuri (multiplu de 5 cm).

=> BF = 5.70 m

Treaptele fundatiei se determina astfel incat cele 2 planuri sa nu fie intrerupte (1/3H F, 2/3HF)

Determinarea cotelor de nivel pentru elementele componente ale culeei C1:

Panta longitudinala a pasajului este 1%.

Cota pe linia rosie in axul de rezemare = 482.98

9) Cota superioara a banchetei cuzinetilor – NSBC

HCONSTRUCTIE = 0.86m

HAP MOBIL = 60 mm = 0.06 m

NSBC = Cota linie rosie – HCONSTRUCTIE - HAP MOBIL = 482.98 – 0.86 - 0.06 = 482.06

Inaltimea banchetei cuzinetilor HBC = 1.00 m (se alege constructiv)

10) Cota inferioara a banchetei cuzinetilor

NIBC = NSBC – HBC = 482.06 – 1.00 = 481.06

11) Determinarea nivelului rostului elevatie – fundatie

NTNp = nivelul terenului natural din dreptul culeei C1

NTNp = 470.67

REF = rost elevatie – fundatie (de calcul)

REF = NTNp – 0.50 = 470.67 – 0.50 = 470.17


12) Inaltimea elevatiei HE

HE= NIBC – REF = 481.06 – 470.17 = 10.89 m => HE = 10.90 m

13) Rost elevatie – fundatie real (REF)

REFreal = NIBC – HE = 481.06 – 10.90 = 470.16

14) Inaltimea fundatiei (HF)

HF = 3.00 m (data in proiect)

15) Cota inferioara fundatie culee

REFfinal = 470.16

Talpa fundatie final:

TFfinal = REFfinal – HF = 470.16 – 3.00 = 467.16

16) Latimea talpii fundatiei (BF)

lE= 3.10m (proiect)

De la marginea elevatiei (in fata elevatiei) se va trasa un plan cu unghi de 60 grade fata de orizontala
pana la intersectia cu nivelul talpii fundatiei. Latimea talpii este compusa din latimea elevatiei la care se
adauga proiectia pe orizontala a planului la care se adauga 10 cm in spatele elevatiei (multiplu de 5 cm).

BF = 0.10 + 3.10 + 1.73 = 4.93m => BF = 5.00 m

Treaptele fundatiei: 1/3HF, 2/3HF.

Determinarea cotelor de nivel pentru elementele componente ale culeei C2:

Panta longitudinala a pasajului este 1%.

Cota pe linia rosie in axul de rezemare = 482.71

17) Cota superioara a banchetei cuzinetilor – NSBC

HCONSTRUCTIE = 0.86m

HAP MOBIL = 60 mm = 0.06 m

NSBC = Cota linie rosie – HCONSTRUCTIE - HAP MOBIL = 482.71 – 0.86 - 0.06 = 481.79

Inaltimea banchetei cuzinetilor HBC = 1.00 m (se alege constructiv)

18) Cota inferioara a banchetei cuzinetilor

NIBC = NSBC – HBC = 481.79 – 1.00 = 480.79

19) Determinarea nivelului rostului elevatie – fundatie

NTNp = nivelul terenului natural din dreptul culeei C2


NTNp = 470.87

REF = rost elevatie – fundatie (de calcul)

REF = NTNp – 0.50 = 470.87 – 0.50 = 470.37

20) Inaltimea elevatiei HE

HE= NIBC – REF = 480.79 – 470.37 = 10.42 m => HE = 10.50 m

21) Rost elevatie – fundatie real (REF)

REFreal = NIBC – HE = 480.79 – 10.50 = 470.29

22) Inaltimea fundatiei (HF)

HF = 3.00 m (data in proiect)

23) Cota inferioara fundatie culee

REFfinal = 470.29

Talpa fundatie final:

TFfinal = REFfinal – HF = 470.29 – 3.00 = 467.29

24) Latimea talpii fundatiei (BF)

lE= 3.10m (proiect)

De la marginea elevatiei (in fata elevatiei) se va trasa un plan cu unghi de 60 grade fata de orizontala
pana la intersectia cu nivelul talpii fundatiei. Latimea talpii este compusa din latimea elevatiei la care se
adauga proiectia pe orizontala a planului la care se adauga 10 cm in spatele elevatiei (multiplu de 5 cm).

BF = 0.10 + 3.10 + 1.73 = 4.93m => BF = 5.00 m

Treaptele fundatiei: 1/3HF, 2/3HF.


5 Determinarea eforturilor sectionale (M, N, H) corespunzatoare
starii limita de echilibru pe talpa fundatiei pilei
5,1 Greutati proprii ale elementelor pilei

Fundatie pila
Latime treapta 1= 2,80 m
Latime treapta 2 (BF)= 5,70 m
Inaltime treapta 1 1,30 m
Inaltime treapta 2 2,60 m
H F= 3,90 m
Lungime fundatie =  9,00 m
γba= 25,00 kN/m3
VF= 166,14 m3
GF= 4153,5 kN

Elevatie pila

Latime pila (BE)= 1,10 m
Lungime zona dreapta= 5,90 m
Raza racordare= 0,55 m
Inaltime elevatie (HE)= 10,55 m
γba= 25,00 kN/m3
VE= 70,98 m3
GE= 1774,40 kN

Bancheta cuzineti 5,2 Greutati ale pamantului pe talpa fundatiei


Lungime bancheta cuzineti= 11,30 m
Lungime bancheta constanta= 7,30 m HP1= 1,82 m
Lungime consola= 2,00 m TF2= 1,45 m
Inaltime bancheta maxima (HB)= 1,20 m HP2= 0,52 m
Inaltime bancheta minim= 0,75 m TF1= 0,85 m
Latime bancheta= 1,30 m Lungime fundatie =  9,00 m
Nr console= 2 γp= 19,00 kN/m3
γba= 25,00 kN/m3 VP1= 23,75 m3
Vzc= 11,39 m3 GP1= 451,27 kN
Vcons= 5,07 m3 VP2= 3,98 m3
VBC= 16,46 m3 GP2= 75,58 kN
GBC= 411,45 kN GP3=GP2= 75,58 kN
GP4=GP1= 451,27 kN
5.3 Forte provenite de la suprastructura

5.3.1 Actiuni permanente
V0Ek,gr= 30,72 kN
0
V Ek,pb= 34,13 kN
V0Ek,CTP= 36,88 kN
nr grinzi= 18
Rfperm= 1830,99 kN

5.3.2 Actiuni din trafic ‐ Grupa 1.a ‐ convoiul LM1 + 3kN/m2 trotuare

L (lungime de calcul grinda)= 13,10 m
Distanta intre osii= 1,20 m
L‐1.20 11,90 m

αQ= 1
Q= 500,00 kN
r1= 1
r2= 0,91
αq= 1
q= 45,00 kN/m
aq= 6,55
Rtrafic= 1248,95 kN
5.3.3 Forta de franare

Ffr= 395,37 kN

5.3.4 Calculul eforturilor sectionale pe talpa fundatiei pilei
Rezultanta fortelor orizontale
H=1.35xFfr= 533,75 kN
Rezultanta fortelor verticale

N= 12424,14 kN

Rezultanta momentului de rasturnare

M= 8970,47 kNm