Category Quantity
Manhole
House Chamber
Trench
Road restoration
Length/ Inner Width/ outer dia/
dia/smaller dia bigger dia
Manhole
S. No. Site Name Diameter (mm) Depth (m)
ID
1 900 1.3
2 900 1
3 900 1
5
6 1200 2
1200 2
1200 2
1200 2
1500 4.2
1500 3.41
1500 3.39
1800 3.3
1800 3.31
1800 3.29
1800 3.3
2100 4
Number/
Height Area (m2) Volume (m2) Ratio
0.090 0.001539
0.100 0.00222
35.249
0.0542
0.0240 2.260
0.228 0.4840
0.090 0.001539
0.100 0.00222
44.673
0.0688
0.0304 2.260
0.300 0.8904
0.090 0.001539
0.100 0.00222
54.098
0.0833
0.0368 2.260
84.544
0.1301
0.0576 2.260
114.779
0.1766
0.0782 2.260
151.168
0.2326
0.1029 2.260
0.300
0.090 0.001539
0.100 0.00222
63.523
0.0978
0.0433 2.260
98.427
0.1515
0.0670 2.260
132.695
0.2042
0.0904 2.260
173.542
0.2671
0.1182 2.260
0.300
0.090 0.001539
0.100 0.00222
72.948
0.1123
0.0497 2.260
98.427
0.1515
0.0670 2.260
132.695
0.2042
0.0904 2.260
173.542
0.2671
0.1182 2.260
0.300
Outgoing
Check of
dia pipe H1 (m) H2 (m) H3 (m) H4 (m) V1 L1
height
outer dia
0.001539
0.0023
0.527473 0.0527
22.934
0.0353
0.0175 2.022
0.1247
Volume
Check of Number of of cement
H2 (m) V1 L1 V2 L2
height bricks concrete
(m3)
0.15 Its OK 0.412 7.500 0.076 1.5 212.144 0.161442
Cement
Cement
Cement concrete at concrete
concrete
PCC bedding for
benching for ring
0.1247 0.029 0.0335