XZCXZXCZXC BREAKDOWN STRUCTURE (WBS) Drone Delivery Prototype

The document outlines the work breakdown structure for a drone delivery prototype project. It details the initiation, planning, execution, control, and closeout phases of the project and their subtasks.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
125 views3 pages

XZCXZXCZXC BREAKDOWN STRUCTURE (WBS) Drone Delivery Prototype

The document outlines the work breakdown structure for a drone delivery prototype project. It details the initiation, planning, execution, control, and closeout phases of the project and their subtasks.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

xzcxzxczxc BREAKDOWN STRUCTURE

(WBS)
DRONE DELIVERY PROTOTYPE

OUTLINE VIEW
1. Drone Delcccxxzxxivery Prototype
1.1 Initiation
1.1.1 Evaluation & Recommendations
1.1.2 Develop Project Contract
1.1.3 Submit Project Contract
1.1.4 Project Sponsor Reviews Project Contract
1.1.5 Project Contract Signed/Approved
1.2 Planning
1.2.1 Create Preliminary Project Scope
1.2.2 Determine Project Team
1.2.3 Project Team Kickoff Meeting
1.2.4 Develop Project Plan
1.2.5 Submit Project Plan
1.2.6 Project Plan Approval
1.3 Execution
1.3.1 Project Kickoff Meeting
1.3.2 Verify & Validate User Requirements
1.3.3 Design System
1.3.4 Data Interface
1.3.5 Interface Flight Operations
1.3.6 Interface Online Order Entry
1.3.7 Interface Communications
1.3.8 Information Security
1.3.9 Procure Hardware/Software
1.3.10 Install Delivery System
1.3.11 Testing Phase
1.3.12 User Training
1.3.13 Go Live
1.4 Control
1.4.1 Bi-Weekly Project Status Meetings
1.4.2 Quarterly Key Stakeholder Meetings
1.4.3 Approval Points
1.4.4 Risk Management
1.5 Closeout
1.5.1 Audit Procurement
1.5.2 Document Lessons Learned
1.5.3 Update Files/Records
1.5.4 Gain Formal Acceptance
1.5.5 Archive Files/Documents
Level WBS Code Element Name
1 1 Drone Delivery Prototype
2 1.1 Initiation
3 1.1.1 Evaluation & Recommendations
3 1.1.2 Develop Project Contract
3 1.1.3 Submit Project Contract
3 1.1.4 Project Sponsor Reviews Project Contract
3 1.1.5 Project Contract Signed/Approved
2 1.2 Planning
3 1.2.1 Create Preliminary Project Scope
3 1.2.2 Determine Project Team
3 1.2.3 Project Team Kickoff Meeting
3 1.2.4 Develop Project Plan
3 1.2.5 Submit Project Plan
3 1.2.6 Project Plan Approval
2 1.3 Execution
3 1.3.1 Project Kickoff Meeting
3 1.3.2 Verify & Validate User Requirements
3 1.3.3 Design System
3 1.3.4 Data Interface
3 1.3.5 Interface Flight Operations
3 1.3.6 Interface Online Order Entry
3 1.3.7 Interface Communications
3 1.3.8 Information Security
3 1.3.9 Procure Hardware/Software
3 1.3.10 Install Delivery System
3 1.3.11 Testing Phase
3 1.3.12 User Training
3 1.3.13 Go Live
2 1.4 Control
3 1.4.1 Bi-Weekly Project Status Meetings
3 1.4.2 Quarterly Key Stakeholder Meetings
3 1.4.3 Approval Points
3 1.4.4 Risk Management
2 1.5 Closeout
3 1.5.1 Audit Procurement
3 1.5.2 Document Lessons Learned
3 1.5.3 Update Files/Records
3 1.5.4 Gain Formal Acceptance
3 1.5.5 Archive Files/Documents