0% found this document useful (0 votes)
90 views3 pages

Dwork Breakdown Structure (WBS) Ds4Xxxxxdrone Delivery Prototype

The document outlines a work breakdown structure (WBS) for a drone delivery prototype project. The WBS is broken down into five levels, with level 1 being the overall project and levels 2-5 breaking down the work into initiation, planning, execution, control, and closeout phases. Each lower level provides more granular tasks for completing the project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
90 views3 pages

Dwork Breakdown Structure (WBS) Ds4Xxxxxdrone Delivery Prototype

The document outlines a work breakdown structure (WBS) for a drone delivery prototype project. The WBS is broken down into five levels, with level 1 being the overall project and levels 2-5 breaking down the work into initiation, planning, execution, control, and closeout phases. Each lower level provides more granular tasks for completing the project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

dWORK BREAKDOWN STRUCTURE

(WBS)
Ds4xxxxxDRONE DELIVERY PROTOTYPE

OUTLINE VIEW
1. Drone Delivery Prototype
1.1 Initiation
1.1.1 Evaluation & Recommendations
1.1.2 Develop Project Contract
1.1.3 Submit Project Contract
1.1.4 Project Sponsor Reviews Project Contract
1.1.5 Project Contract Signed/Approved
1.2 Planning
1.2.1 Create Preliminary Project Scope
1.2.2 Determine Project Team
1.2.3 Project Team Kickoff Meeting
1.2.4 Develop Project Plan
1.2.5 Submit Project Plan
1.2.6 Project Plan Approval
1.3 Execution
1.3.1 Project Kickoff Meeting
1.3.2 Verify & Validate User Requirements
1.3.3 Design System
1.3.4 Data Interface
1.3.5 Interface Flight Operations
1.3.6 Interface Online Order Entry
1.3.7 Interface Communications
1.3.8 Information Security
1.3.9 Procure Hardware/Software
1.3.10 Install Delivery System
1.3.11 Testing Phase
1.3.12 User Training
1.3.13 Go Live
1.4 Control
1.4.1 Bi-Weekly Project Status Meetings
1.4.2 Quarterly Key Stakeholder Meetings
1.4.3 Approval Points
1.4.4 Risk Management
1.5 Closeout
1.5.1 Audit Procurement
1.5.2 Document Lessons Learned
1.5.3 Update Files/Records
1.5.4 Gain Formal Acceptance
1.5.5 Archive Files/Documents
Level WBS Code Element Name
1 1 Drone Delivery Prototype
2 1.1 Initiation
3 1.1.1 Evaluation & Recommendations
3 1.1.2 Develop Project Contract
3 1.1.3 Submit Project Contract
3 1.1.4 Project Sponsor Reviews Project Contract
3 1.1.5 Project Contract Signed/Approved
2 1.2 Planning
3 1.2.1 Create Preliminary Project Scope
3 1.2.2 Determine Project Team
3 1.2.3 Project Team Kickoff Meeting
3 1.2.4 Develop Project Plan
3 1.2.5 Submit Project Plan
3 1.2.6 Project Plan Approval
2 1.3 Execution
3 1.3.1 Project Kickoff Meeting
3 1.3.2 Verify & Validate User Requirements
3 1.3.3 Design System
3 1.3.4 Data Interface
3 1.3.5 Interface Flight Operations
3 1.3.6 Interface Online Order Entry
3 1.3.7 Interface Communications
3 1.3.8 Information Security
3 1.3.9 Procure Hardware/Software
3 1.3.10 Install Delivery System
3 1.3.11 Testing Phase
3 1.3.12 User Training
3 1.3.13 Go Live
2 1.4 Control
3 1.4.1 Bi-Weekly Project Status Meetings
3 1.4.2 Quarterly Key Stakeholder Meetings
3 1.4.3 Approval Points
3 1.4.4 Risk Management
2 1.5 Closeout
3 1.5.1 Audit Procurement
3 1.5.2 Document Lessons Learned
3 1.5.3 Update Files/Records
3 1.5.4 Gain Formal Acceptance
3 1.5.5 Archive Files/Documents

You might also like