Important Instruction: 1. Words/figure May Be Changed. 2. Blanks and True/False May Be Interchanged
Important Instruction: 1. Words/figure May Be Changed. 2. Blanks and True/False May Be Interchanged
Important Instruction:
1. Words/figure may be changed.
2. Blanks and True/False may be interchanged.
1
28) In outline process chart, the ___________lines represents materials being
introduced. (horizontal)
29) The outline (operation) process chart, operation and ___________ symbols are
used. (inspection)
30) In process charts, the symbol used for inspection is__________.(square)
31) In process charts, the symbol used for storage is_______.(triangle)
32) A milk powder tin is being weighed as it is filled is an example of Operation
cum ___________(inspection)
33) Economic and Technical considerations and Human reactions must be
considered while selecting the work for _______study. (method)
34) _____chart gives simultaneously information about the progress of work and
machine loading.( manmachine )
True/ False:
1) Productivity = input / output (False)
2) PFD allowance takes care of personal needs, failure, and unavoidable delays.
(False) Correct answer (Fatigue)
3) Total work content =Basic work content + Excess time (True)
4) Skill, Efficiency, Conditions and Consistency. are used in Westing-house
System of Rating (False) (Correct Effort)
5) A four factors system performance Rating was developed at Westing house by
C.E. Bedaux. (True)
6) Method Study simplifies the job & develop more economical methods of doing
it. (True)
7) Method study and time study are not closely linked. (False)
8) Work Measurement determines how long it should take it to carry out. (true)
9) In OPC, all types of movements i.e. complex, very fast or unrestricted
movements can be recorded. (False)
10) Cycle and Chronocycle graphs provide an aid in explaining the pattern of
motion which is used in performing the operation. (True)
11) Multiple activity charts are the process charts using a time scale. (True)
12) A string diagram is a tabular record for representing the quantitative data
regarding the movement of workers, materials or equipment. (False) (Correct
answer: Travel Chart)
13) The travel chart is a very effective technique of recording for critical
examination of the movement of man and material but string diagrams take very
long time to construct. (False) (Correct answer: string diagram)
14) Frederick Taylor is not known as the "father of scientific management. (False)
15) The performance rating factor and allowances are based upon human judgment
(true)
16) A Performance Rating Factor (PRF) of 130% means a worker is slow and needs
0% more time. (False)
17) . A performance-rating factor (PRF) of 1.15 means a worker is working at a
pace that is 15 percent faster than normal. (True)
18) Allowances include time for fatigue, equipment breakdowns, rest periods.
(True)
19) Personal fatigue and delay allowances are added to normal time; to arrive at
Standard (True)
20) Predetermined time standards are time available in books and electronic tables
(True)
2
21) Repetitive element occurs in every work cycle of the job. (True)
22) Occasional element occurs at intervals. (True)
23) Constant element in which basic or normal time reminds constant. (True)
24) Variable element basic or normal time varies. (True)
25) Machines perform manual element. (False)
26) Governing element does not occupies a longer time than any other element. (False)
27) Normal time = Observed Time x Performance Rating Factor or, OT x PRF (True)
28) Predetermined time standards are advantageous since they avoid needing multiple
performance ratings. (True)
29) W.F.S. is kind of PMTS known as Work Force System (False) (Correct answer
Factor).
30) Rating Factor= Normal Performance / Observed performance (False) (correct
answer: Observed performance/ Normal Performance)
Match the followings for various types of elements used in Time study:
No Types of Elements No %
Allowances
A Personal allowance I 0-15%
B Basic fatigue allowance II 5%
C Awkward work posture III 4%
concentrations
D Visual concentrations IV 1-8%
E Poor Lighting V 0-10%
F Tediousness or VI 1-5%
monotony
G Protective equipment VII 0-5%
H Mental strain VIII 0-20%
Answers:
A B C D E F G H
II III I V VI VII VIII IV
3
Match the followings for various types of allowances:
Answers:
A B C D E F G H
II III I V VI VII VIII IV
4) Draw the diagram of total time of operation consisting work content and total
ineffective time addition:
4
5) What is Total Productivity?
Total Productivity: When the change in output is caused by changed in the quantity
of all or more than one variable, it is called as total factor productivity.
5
8) Write formula to calculate efficiency on output and time basis:
6
12) Write advantages of method study:
1) Improved working and standardized procedures.
2) Better work place layout
3) Less fatigue to operators.
4) Better product quality
5) Effective utilization of men, material & machinery
6) Efficient and fast material handling.
7) Reduced health hazards
8) Efficient planning of the section
9) Streamlined working procedures
7
17) Draw process chart symbols
8
4.The correct order of procedure in method study is
Select – Record – Examine – Develop – Define – Install – Maintain *
Select – Define – Examine – Develop – Record – Install – Maintain
Select – Record – Develop – Examine – Define – Install – Maintain
Select – Record – Examine – Define – Develop – Install – Maintain
5.The following factor(s) must be considered while selecting the work for
method study
Economic considerations
Technical considerations
Human reactions
All of the given*
11.The outline (operation) process chart, the following symbols are used
Operation and inspection *
Operation and transportation
Inspection and transportation
Operation and storage
9
12.The following is (are) the type(s) of flow process chart
Man type
Material type
Equipment type
All of the given *
20.In SIMO chart, the movements are recorded against time measured in _____.
Minutes
11
Seconds
Micro seconds
Winks *
22.The height of chair should be such that the top of work table is ________ the
elbow level of the operator.
at same level of
about 30 mm below
about 30 mm above
about 50 mm above *
27.Which one of the following chart gives simultaneously information about the
progress of work and machine loading?
Process chart
Machine load chart
Man-machine chart *
Gantt chart
11
Policy allowance *
Interference allowance
Process allowance
Learning allowance
32.The average time recorded by work study man for an operation is called
Standard time
Normal time
Representative time *
None of these
33.Time study is carried out to determine the time required to complete job by
A slow worker
A fast worker
An average worker *
An apprentice
12
Estimate the selling prices and delivery dates
All of the given *
37.Micro-motion study is
Enlarged view of motion study
Analysis of one stage of motion study
Minute and detailed motion study
Subdivision of an operation into therbligs and their analysis *
44.The chart which gives an estimate about the amount of materials handling
between various work stations is known as
13
Flow chart
Process chart
Travel chart *
Operation chart
14