50% found this document useful (2 votes)
1K views

Software Engineering Prelim

The document appears to be a quiz on software engineering concepts. It contains 20 multiple choice questions testing knowledge in areas like software ethics, principles of software engineering, roles and responsibilities, and definitions of key terms. All questions were answered correctly, resulting in a perfect score of 20/20 (100%).

Uploaded by

Rochie Roasa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
50% found this document useful (2 votes)
1K views

Software Engineering Prelim

The document appears to be a quiz on software engineering concepts. It contains 20 multiple choice questions testing knowledge in areas like software ethics, principles of software engineering, roles and responsibilities, and definitions of key terms. All questions were answered correctly, resulting in a perfect score of 20/20 (100%).

Uploaded by

Rochie Roasa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 44

OED Software Engineering

Q1

Grade 20.00 out of 20.00 (100%)


Question 1
Correct
Mark 1.00 out of 1.00

Flag question

Question text

It refers to computer programs and the manuals (if any) that support them.

Select one:

a. Software 

b. Procedures

c. People

d. Feedback
Feedback

Your answer is correct.

Question 2
Correct
Mark 1.00 out of 1.00

Flag question

Question text

Identify an ethical dilemma from the situations mentioned below:

Select one:
a. Agreement in principle with the policies of senior management

b. All of the mentioned

c. Your employer releases a safety-critical system without finishing the testing of the
system 

d. Refusing to undertake a project


Feedback

Your answer is correct.

Question 3
Correct
Mark 1.00 out of 1.00

Flag question

Question text

As per an IBM report, “31%of the project get cancelled before they are completed, 53%
overrun their cost estimates by an average of 189% and for every 100 projects, there are 94
restarts”.What is the reason for these statistics ?

Select one:

a. Management issues in the company

b. Lack of software ethics and understanding

c. All of the mentioned

d. Lack of adequate training in software engineering 


Feedback

Your answer is correct.

Question 4
Correct
Mark 1.00 out of 1.00
Flag question

Question text

It is important in designing software that is free from unnatural restrictions and limitations.

Select one:

a. Incremental Development

b. Generality 

c. Consistency

d. Anticipation of Change
Feedback

Your answer is correct.

Question 5
Correct
Mark 1.00 out of 1.00

Flag question

Question text

It is often easier to use if these two concerns are divided  as much as possible into separate
sets of client functions.

Select one:

a. Software Engineering Principles

b. Abstraction

c. data structure component 

d. Modularity
Feedback
Your answer is correct.

Question 6
Correct
Mark 1.00 out of 1.00

Flag question

Question text

It is a system composed of people and computers that processes or interprets information.

Select one:

a. Information System 

b. Data

c. Data System

d. Information
Feedback

Your answer is correct.

Question 7
Correct
Mark 1.00 out of 1.00

Flag question

Question text

Efficiency in a software product does not include ________

Select one:

a. licensing 

b. processing time

c. responsiveness
d. memory utilization
Feedback

Your answer is correct.

Question 8
Correct
Mark 1.00 out of 1.00

Flag question

Question text

The reason for software bugs and failures is due to

Select one:

a. Software companies

b. All of the mentioned

c. Both Software companies and Developers 

d. Software Developers
Feedback

Your answer is correct.

Question 9
Correct
Mark 1.00 out of 1.00

Flag question

Question text

These are the policies that govern the operation of a computer system. 

Select one:
a. Hardware

b. Sofware

c. People

d. Procedures 
Feedback

Your answer is correct.

Question 10
Correct
Mark 1.00 out of 1.00

Flag question

Question text

An ________________ process simplifies verification. If you develop software by adding small


increments of functionality, then, for verification, you only need to deal with the added
portion

Select one:

a. Incremental Development 

b. Consistency

c. Generality

d. Abstraction
Feedback

Your answer is correct.

Question 11
Correct
Mark 1.00 out of 1.00
Flag question

Question text

A field studying computers and algorithmic processes, including their principles, their
software and hardware designs, their applications, and their impact on society, whereas IS
emphasizes functionality over design.

Select one:

a. Information System

b. Computer information system 

c. Information Technology

d. Computer Science
Feedback

Your answer is correct.

Question 12
Correct
Mark 1.00 out of 1.00

Flag question

Question text

Identify the correct statement: “Software engineers shall

Select one:

a. act consistently with the public interest.” 

b. ensure that their products only meet the SRS.”

c. act in a manner that is in the best interests of his expertise and favour.”

d. all of the mentioned


Feedback

Your answer is correct.

Question 13
Correct
Mark 1.00 out of 1.00

Flag question

Question text

Company has latest computers and state-of the- art software tools, so we shouldn’t worry
about the quality of the product.

Select one:

True

False 

Question 14
Correct
Mark 1.00 out of 1.00

Flag question

Question text

Select the incorrect statement: “Software engineers should

Select one:

a. be dependent on their colleagues.” 

b. not use your technical skills to misuse other people’s computers.”

c. not knowingly accept work that is outside your competence.”

d. maintain integrity and independence in their professional judgment.”


Feedback
Your answer is correct.

Question 15
Correct
Mark 1.00 out of 1.00

Flag question

Question text

It implies separating software into components according to functionality and responsibility.

Select one:

a. Modularity 

b. Abstraction

c. Separation of Concerns

d. Anticipation of change
Feedback

Your answer is correct.

Question 16
Correct
Mark 1.00 out of 1.00

Flag question

Question text

This category includes the computer itself, which is often referred to as the central
processing unit (CPU), and all of its support equipment.

Select one:

a. Software

b. Procedures
c. Data

d. Hardware 
Feedback

Your answer is correct.

Question 17
Correct
Mark 1.00 out of 1.00

Flag question

Question text

Explain what is meant by PRODUCT with reference to one of the eight principles as per the
ACM/IEEE Code of Ethics ?

Select one:

a. It means that the product designed /created should be easily available

b. The product should be easy to use

c. Software engineers shall ensure that their products and related modifications meet the
highest professional standards possible 

d. Software engineers shall ensure that their products and related modifications satisfy the
client
Feedback

Your answer is correct.

Question 18
Correct
Mark 1.00 out of 1.00

Flag question

Question text
Choose the correct option in terms of Issues related to professional responsibility

Select one:

a. Intellectual property rights

b. Confidentiality

c. Both Confidentiality & Intellectual property rights 

d. Managing Client Relationships


Feedback

Your answer is correct.

Question 19
Correct
Mark 1.00 out of 1.00

Flag question

Question text

They deal with structures and algorithms without regard for the meaning or importance of
the data that is involved.

Select one:

a. Programmer

b. Software developers 

c. Software Engineer

d. Database Administrator
Feedback

Your answer is correct.

Question 20
Correct
Mark 1.00 out of 1.00
Flag question

Question text

“Software engineers should not use their technical skills to misuse other people’s
computers.”Here the term misuse refers to:

Select one:

a. Dissemination of viruses or other malware

b. Unauthorized access to computer material

c. All of the mentioned 

d. Unauthorized modification of computer material


Feedback

Your answer is correct.

Q1_A

Grade 20.00 out of 20.00 (100%)

Question 1
Correct

Mark 1.00 out of 1.00

Flag question

Question text

As per an IBM report, “31%of the project get cancelled before they are completed, 53%
overrun their cost estimates by an average of 189% and for every 100 projects, there are 94
restarts”.What is the reason for these statistics ?
Select one:
a. Management issues in the company

b. Lack of adequate training in software engineering 

c. Lack of software ethics and understanding

d. All of the mentioned

Feedback

Your answer is correct.

Question 2
Correct

Mark 1.00 out of 1.00

Flag question

Question text

It is often easier to use if these two concerns are divided  as much as possible into separate
sets of client functions.
Select one:

a. Abstraction

b. data structure component 

c. Modularity

d. Software Engineering Principles

Feedback

Your answer is correct.

Question 3
Correct
Mark 1.00 out of 1.00

Flag question

Question text

Identify an ethical dilemma from the situations mentioned below:


Select one:

a. All of the mentioned

b. Refusing to undertake a project

c. Agreement in principle with the policies of senior management

d. Your employer releases a safety-critical system without finishing the testing of the
system 

Feedback

Your answer is correct.

Question 4
Correct

Mark 1.00 out of 1.00

Flag question

Question text

This category includes the computer itself, which is often referred to as the central
processing unit (CPU), and all of its support equipment.
Select one:

a. Software
b. Data

c. Procedures

d. Hardware 

Feedback

Your answer is correct.

Question 5
Correct

Mark 1.00 out of 1.00

Flag question

Question text

The reason for software bugs and failures is due to


Select one:

a. All of the mentioned

b. Software companies

c. Software Developers

d. Both Software companies and Developers 

Feedback

Your answer is correct.

Question 6
Correct

Mark 1.00 out of 1.00


Flag question

Question text

It is a system composed of people and computers that processes or interprets information.


Select one:

a. Information System 

b. Data System

c. Information

d. Data

Feedback

Your answer is correct.

Question 7
Correct

Mark 1.00 out of 1.00

Flag question

Question text

They deal with structures and algorithms without regard for the meaning or importance of
the data that is involved.
Select one:

a. Database Administrator

b. Software developers 
c. Software Engineer

d. Programmer

Feedback

Your answer is correct.

Question 8
Correct

Mark 1.00 out of 1.00

Flag question

Question text

Efficiency in a software product does not include ________


Select one:

a. processing time

b. memory utilization

c. responsiveness

d. licensing 

Feedback

Your answer is correct.

Question 9
Correct

Mark 1.00 out of 1.00


Flag question

Question text

It implies separating software into components according to functionality and responsibility.


Select one:

a. Modularity 

b. Separation of Concerns

c. Abstraction

d. Anticipation of change

Feedback

Your answer is correct.

Question 10
Correct

Mark 1.00 out of 1.00

Flag question

Question text

Identify the correct statement: “Software engineers shall


Select one:

a. ensure that their products only meet the SRS.”

b. act in a manner that is in the best interests of his expertise and favour.”
c. act consistently with the public interest.” 

d. all of the mentioned

Feedback

Your answer is correct.

Question 11
Correct

Mark 1.00 out of 1.00

Flag question

Question text

It refers to computer programs and the manuals (if any) that support them.
Select one:

a. Feedback

b. People

c. Software 

d. Procedures

Feedback

Your answer is correct.

Question 12
Correct

Mark 1.00 out of 1.00


Flag question

Question text

Choose the correct option in terms of Issues related to professional responsibility


Select one:

a. Managing Client Relationships

b. Both Confidentiality & Intellectual property rights 

c. Confidentiality

d. Intellectual property rights

Feedback

Your answer is correct.

Question 13
Correct

Mark 1.00 out of 1.00

Flag question

Question text

Company has latest computers and state-of the- art software tools, so we shouldn’t worry
about the quality of the product.
Select one:

True

False 
Question 14
Correct

Mark 1.00 out of 1.00

Flag question

Question text

An ________________ process simplifies verification. If you develop software by adding small


increments of functionality, then, for verification, you only need to deal with the added
portion
Select one:

a. Abstraction

b. Incremental Development 

c. Consistency

d. Generality

Feedback

Your answer is correct.

Question 15
Correct

Mark 1.00 out of 1.00

Flag question

Question text

Select the incorrect statement: “Software engineers should


Select one:

a. maintain integrity and independence in their professional judgment.”

b. not knowingly accept work that is outside your competence.”

c. be dependent on their colleagues.” 

d. not use your technical skills to misuse other people’s computers.”

Feedback

Your answer is correct.

Question 16
Correct

Mark 1.00 out of 1.00

Flag question

Question text

These are the policies that govern the operation of a computer system. 
Select one:

a. Procedures 

b. Sofware

c. Hardware

d. People

Feedback

Your answer is correct.

Question 17
Correct

Mark 1.00 out of 1.00

Flag question

Question text

“Software engineers should not use their technical skills to misuse other people’s
computers.”Here the term misuse refers to:
Select one:

a. Unauthorized access to computer material

b. All of the mentioned 

c. Unauthorized modification of computer material

d. Dissemination of viruses or other malware

Feedback

Your answer is correct.

Question 18
Correct

Mark 1.00 out of 1.00

Flag question

Question text

A field studying computers and algorithmic processes, including their principles, their
software and hardware designs, their applications, and their impact on society, whereas IS
emphasizes functionality over design.
Select one:
a. Information System

b. Computer Science

c. Computer information system 

d. Information Technology

Feedback

Your answer is correct.

Question 19
Correct

Mark 1.00 out of 1.00

Flag question

Question text

It is important in designing software that is free from unnatural restrictions and limitations.
Select one:

a. Generality 

b. Anticipation of Change

c. Incremental Development

d. Consistency

Feedback

Your answer is correct.

Question 20
Correct
Mark 1.00 out of 1.00

Flag question

Question text

Explain what is meant by PRODUCT with reference to one of the eight principles as per the
ACM/IEEE Code of Ethics ?
Select one:

a. It means that the product designed /created should be easily available

b. Software engineers shall ensure that their products and related modifications meet the
highest professional standards possible 

c. The product should be easy to use

d. Software engineers shall ensure that their products and related modifications satisfy the
client

Feedback

Your answer is correct.

Q1_B

Grade 10.00 out of 10.00 (100%)

Question 1
Correct

Mark 1.00 out of 1.00

Flag question

Question text
During the Defense which of the following the researchers must do first? 
Select one:

a. Group presentation

b. Orientation from the chairman of the panel  

c.  Defense- question and answer

d. Evaluation

Feedback

Your answer is correct.

Question 2
Correct

Mark 1.00 out of 1.00

Flag question

Question text

It is very significant to note that the researcher must be totally aware of the purpose of the
research problem.
Select one:

True 

False

Question 3
Correct

Mark 1.00 out of 1.00


Flag question

Question text

The introduction is very important in establishing the affective setting of the research.
Select one:

True

False 

Question 4
Correct

Mark 1.00 out of 1.00

Flag question

Question text

Which of the following is not true about Research title?


Select one:

a. Title should summarize the main idea of the paper

b. It must include the major variable/s

c. None of the choices 

d. It must be self-explanatory

Feedback

Your answer is correct.


Question 5
Correct

Mark 1.00 out of 1.00

Flag question

Question text

Acknowledgement sheet should be  placed immediately after the title page. Generally, it
contains statements of recommendation and acceptance.
Select one:

True

False 

Question 6
Correct

Mark 1.00 out of 1.00

Flag question

Question text

The following are elements of the Problem and Its Background except,
Select one:

a. Scope and Delimitation

b. introduction

c. Statistical Treatment 

d. Statement of the Problem


Feedback

Your answer is correct.

Question 7
Correct

Mark 1.00 out of 1.00

Flag question

Question text

A research title must not come from personal experience, an article read, a scene witnessed
or news heard for it will invalidate the study.
Select one:

True

False 

Question 8
Correct

Mark 1.00 out of 1.00

Flag question

Question text

The Title page should be center-justified and in all capital letters, follows the inverted
pyramid style, and is single-spaced.
Select one:

True 
False

Question 9
Correct

Mark 1.00 out of 1.00

Flag question

Question text

Which of the following is the External criteria in formulating research problem?


Select one:

a. Hazards, penalties, and handicaps

b. Ethical considerations 

c. Time factor

d. Ethical issues

Feedback

Your answer is correct.

Question 10
Correct

Mark 1.00 out of 1.00

Flag question

Question text

During the Defense which of the following must be done last?


Select one:

a. Group presentation

b. Evaluation 

c. None of the choices

d. Orientation from the chairman of the panel

Feedback

Your answer is correct.

Q2_A

Grade 20.00 out of 20.00 (100%)

Question 1
Correct

Mark 1.00 out of 1.00

Flag question

Question text

Projects are often defined broadly when they begin, and as time passes, the specific details
of the project become clearer.
Select one:

a. A project should have a primary customer or sponsor. 

b. A project is developed using progressive elaboration or in an iterative fashion. 

c. A project requires resources, often from various areas


d. A project involves uncertainty

Feedback

Your answer is correct.

Question 2
Correct

Mark 1.00 out of 1.00

Flag question

Question text

Which of the following is not project management goal?


Select one:

a. Avoiding customer complaints 

b. Maintaining a happy and well-functioning development team

c. Delivering the software to the customer at the agreed time

d. Keeping overall costs within budget

Feedback

Your answer is correct.

Question 3
Correct

Mark 1.00 out of 1.00

Flag question
Question text

Quality planning is the process of developing a quality plan for


Select one:

a. team

b. project manager

c. project 

d. customers

Feedback

Your answer is correct.

Question 4
Correct

Mark 1.00 out of 1.00

Flag question

Question text

Project managers have to assess the risks that may affect a project.
Select one:

True

False 

Question 5
Correct

Mark 1.00 out of 1.00


Flag question

Question text

Identify the sub-process of process improvement


Select one:

a. De-processification

b. Process introduction

c. Process analysis 

d. Process distribution

Feedback

Your answer is correct.

Question 6
Correct

Mark 1.00 out of 1.00

Flag question

Question text

It refers to the amount of time available to complete a project


Select one:

a. Budget constraints

b. Time constraints 
c. Cost constraints

d. Duration constraints

Feedback

Your answer is correct.

Question 7
Correct

Mark 1.00 out of 1.00

Flag question

Question text

An independent relationship must exist between the attribute that can be measured and the
external quality attribute.
Select one:

True

False 

Question 8
Correct

Mark 1.00 out of 1.00

Flag question

Question text

Every project should have a  well-defined objective. For example, many people hire firms to
design and build a new house, but each house, like each person, is unique.
Select one:

a. A project has a unique purpose. 

b. A project requires resources, often from various areas.

c. A project is developed using progressive elaboration or in an iterative fashion.

d. A project is temporary

Feedback

Your answer is correct.

Question 9
Correct

Mark 1.00 out of 1.00

Flag question

Question text

A temporary endeavor undertaken to create a unique product, service, or result.


Select one:

a. Project 

b. System

c. Plan

d. Documentation

Feedback
Your answer is correct.

Question 10
Correct

Mark 1.00 out of 1.00

Flag question

Question text

Most projects have many interested parties or stakeholders, but someone must take the
primary role of sponsorship.

Select one:

a. A project should have a primary customer or sponsor 

b. A project is developed using progressive elaboration or in an iterative fashion.

c. A project involves uncertainty

d. A project has a unique purpose

Feedback

Your answer is correct.

Question 11
Correct

Mark 1.00 out of 1.00

Flag question

Question text

A 66.6% risk is considered as


Select one:

a. low

b. moderate

c. high 

d. very low

Feedback

Your answer is correct.

Question 12
Correct

Mark 1.00 out of 1.00

Flag question

Question text

Resources include people, hardware, software, or other assets. Many different types of
people, skill sets, and resources are needed to build a home.

Select one:

a. A project involves uncertainty

b. A project should have a primary customer or sponsor

c. A project has a unique purpose

d. A project requires resources, often from various areas 

Feedback
Your answer is correct.

Question 13
Correct

Mark 1.00 out of 1.00

Flag question

Question text

Which of the following is not considered as a risk in project management?


Select one:

a. Staff turnover

b. Testing 

c. Product competition

d. Specification delays

Feedback

Your answer is correct.

Question 14
Correct

Mark 1.00 out of 1.00

Flag question

Question text

A project’s duration might be just one week or it might go on for years, but every project
has an end date.
Select one:

a. A project is an endeavor

b. All of the above

c. A project is deliverable 

d. A project is temporary 

Feedback

Your answer is correct.

Question 15
Correct

Mark 1.00 out of 1.00

Flag question

Question text

It refers to what must be done to produce the project's end result


Select one:

a. Output constraints

b. Scope constraints 

c. Limit constraints

d. Deliverable  constraints

Feedback

Your answer is correct.

Question 16
Correct

Mark 1.00 out of 1.00

Flag question

Question text

Resources, such as people and equipment, need to do work.


Select one:

a. None of the above

b. A project is an endeavor 

c. A project is temporary

d. A project is deliverable

Feedback

Your answer is correct.

Question 17
Correct

Mark 1.00 out of 1.00

Flag question

Question text

Which of the following is incorrect activity for the configuration management of a software
system?
Select one:
a. Internship management 

b. Version management

c. Change management

d. System management

Feedback

Your answer is correct.

Question 18
Correct

Mark 1.00 out of 1.00

Flag question

Question text

It refers to the budgeted amount available for the project.


Select one:

a. Amount constraints

b. Cost constraints 

c. Money constraints

d. Budget constraints

Feedback

Your answer is correct.

Question 19
Correct
Mark 1.00 out of 1.00

Flag question

Question text

The process each manager follows during the life of a project is known as
Select one:

a. Project Management

b. All of the mentioned

c. Manager life cycle

d.  Project Management Life Cycle 

Feedback

Your answer is correct.

Question 20
Correct

Mark 1.00 out of 1.00

Flag question

Question text

Which of the following is/are main parameters that you should use when computing the
costs of a software development project?
Select one:

a. travel and training costs


b. effort costs (the costs of paying software engineers and managers)

c. all of the mentioned 

d. hardware and software costs

Feedback

Your answer is correct.

You might also like