0% found this document useful (0 votes)
36 views2 pages

Hazop Action Sheet: Project Title Yanbu Phase 3 Power & Desalination Plant Interfaces P&ID Drawing No

This HAZOP action sheet documents clarification needed for a project involving the Yanbu Phase 3 Power & Desalination Plant interfaces. Specifically, it addresses clarifying the impact on the multi-stage flash system if the temperature element malfunctions and the need for redundant instrumentation to monitor steam temperature. The engineer proposed using the multiple process steam temperature transmitters on the supply header for redundancy. Upon reviewing the revised piping and instrumentation diagram, the client technical project manager agreed and closed the item.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views2 pages

Hazop Action Sheet: Project Title Yanbu Phase 3 Power & Desalination Plant Interfaces P&ID Drawing No

This HAZOP action sheet documents clarification needed for a project involving the Yanbu Phase 3 Power & Desalination Plant interfaces. Specifically, it addresses clarifying the impact on the multi-stage flash system if the temperature element malfunctions and the need for redundant instrumentation to monitor steam temperature. The engineer proposed using the multiple process steam temperature transmitters on the supply header for redundancy. Upon reviewing the revised piping and instrumentation diagram, the client technical project manager agreed and closed the item.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

HAZOP ACTION SHEET

Project Title Yanbu Phase 3 Power & Desalination Plant Interfaces


P&ID Drawing No 455-00-DT-M-10250 Sheet 5 of 15
71-GDH-MFB-001
HAZOP Title MP Steam Export
KKS No NAE

Item No: 005

Responsible Person:

Part of System/ Supply to vacuum system More temperature


Parameter:

Action Recommended: Clarify impact to MSF in event of spurious malfunction of temperature element
71GDH01CT001 and requirement for redundant instrumentation.

Engineer Proposal: MP steam temperature transmitter on the header will be used for redundant use.
There are three (3) MP steam temperature transmitter on the supply header.
Please refer to the revised P&ID no. 71-GDH-MFB-001.

Final Clarification: SWCC/Fichtner comments (23.04.2015):


Noted. Item closed.