Realization of Gas Treatment Units (EPC 2 - Phase 1) South West Gas Fields Development Project, Algeria

The daily report provides an update on concrete pouring activities for various elements of a gas treatment project in Algeria. It lists 40 project elements and details the quantity of concrete poured or scheduled to be poured for elements' footings, pedestals, and ring walls. A total of 511 cubic meters of concrete had been poured to date. Work ongoing includes removing forms, reinforcement, and preparing to pour concrete for additional elements.

Uploaded by

Boufala Hilal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
88 views1 page

Realization of Gas Treatment Units (EPC 2 - Phase 1) South West Gas Fields Development Project, Algeria

The daily report provides an update on concrete pouring activities for various elements of a gas treatment project in Algeria. It lists 40 project elements and details the quantity of concrete poured or scheduled to be poured for elements' footings, pedestals, and ring walls. A total of 511 cubic meters of concrete had been poured to date. Work ongoing includes removing forms, reinforcement, and preparing to pour concrete for additional elements.

Uploaded by

Boufala Hilal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Realization of Gas Treatment Units (EPC 2 – Phase 1)

South West Gas Fields Development Project, Algeria


DAILY REPORT CPF HBH UPDATE
DATE: 01-09-2020
PREPARED BY: ABDELAZIZ BENYAHIA
DESCRIPTION OF ELEMENT TOTAL QUANTITY
OF CONCRETE
MAIN POWER
LEAN CONC FOOTINGS PEDESTALS RING WALL
C.S.
Sl. No AREA N⁰ ITEM N⁰ C.S. PAIVIN EQUIPMENT PICTUR REMARKS
EXCAV REINFORC FORMW CASTING PROTICTI BACKFIL
REPARE G m3
ON
INSP Q= m3 INSP Q= m3 INSP Q= m3 INSP Q= m3 NBR TOTAL
1 A
2 B
3 C
4 D
5 Main Piperack E
6 F 6
7 G
8 H

5 forwork for 8 P6 + 2P3+ 2P5 and F2 ready for pouring


9 A

10 GTG SHELTER B
8 7 pouring concrete for 3 P1

11 C
7 2 9 pouring concrete for 2P5+1P4 and F2

12 D 2

13 A 6 removing form
14 B
HP GTC
15 C 4 removing form on going for GTC-C
16 D 97 8 pouring concrete for GTC D

17 A 6 formwork ongoing
18 LP GTC B
19 C
20 D

21 FIRE WATER 3
22 RAW WATER TANK
23 TANK PRODUCED W
BUFFER 174 144
24 FRESH WATER

25 DIESEL STORAGE TANK

Concrete surface repair, protective coating + backfilling and


26 FENCE A 3 instalation of panels

27 105
WATER WELL
28 106

1G66-ST-25-001 & 002 A, B & C 6 removing form for F1 &F2 & F3 axe C
29

30 STAIR TOWER HP A/B/C/D 16 A & B ready for pouring

60 pouring concrete for A&B&C&D


31 STAIR TOWER LP A/B/C/D

32 SLUG CATCHER FOUNDATION A,B AND C


33 PROCESS RACK 1G01-SW-20-009
34 PROCESS RACK 1G01-SW-20-010
35 PROCESS RACK 1G01-SW-20-011
36 PROCESS RACK 1G01-SW-20-012
37 ELEC AIR compressor shelter 29 reinforcement for foundations
38 Flare area
39 HP Fuel gas separator
40
Fence post precast 4 form for 11 fondation
manhole precast 5 form for 9 manholes (walls)
41 GCB WORKSHOP
fence panel welding 3
bar bending 22